One of the Kitimat LNG projects plans to self-generate power for liquefaction plant

At least one of the two large liquified natural gas projects in Kitimat is, at least at this point, planning to self-generate the power required using a gas-fired, steam-driven electrical generation system.

A job ad posted this weekend by the headhunting firm Fircroft is seeking a Lead Project Engineer, Power Plant for “Our client, a major international owner/operating company, requires expertise for their LNG mega-project in Western Canada.”

The job, which requires 20 years and more experience, would be located in Calgary for eighteen months, then move to Kitimat for the remainder of a four year contract paying from $1650 to $1850 per day.

By Fircroft describing the job as a “mega-project” means that the client is either Shell’s LNG Canada project or the Chevron and Apache KM LNG project, since the much smaller BC LNG project could not be described as a “mega-project.”

As well as the standard qualifications for a senior engineer, the job posting lists:

• Power Plant design, operation and construction experience required.
• Boiler design, construction, operation, and commissioning experience required.
• Heat Recovery Steam Generation (HRSG) design, processes, construction, operation, and commissioning experience required.
• Integrates inherent safety in design and operability in concept selection and development for gas resource opportunities.

Providing the power for the Kitimat and other northwestern LNG projects is becoming controversial. The power is needed to cool the natural gas so it can be loaded onto tankers for shipment to customers.

The BC government recently announced a $650,000 study of the cumulative effect on air quality for the planned industrial expansion in the Kitimat area, including the Rio Tinto Alcan Kitimat modernization project, which would increase the amount of sulphur dioxide emissions, combined with as many as three LNG projects and the associated increase in tanker traffic, as well as the possible and even more controversial Enbridge Northern Gateway project.

At the time of the BC announcement, the Globe and Mail reported:

If natural gas is used either for direct-drive or combined-cycle electricity generation to produce the energy required for the proposed Shell LNG facility at Kitimat, approximately 300 million cubic feet of natural gas would be burned. The proposed Chevron Apache LNG facility could burn approximately 140 million cubic feet of natural gas.

The other alternative for powering the LNG plants is to use hydro-electricity, and BC Hydro at the moment doesn’t have the capacity to supply the LNG projects with power. One possibility is the controversial Site C dam project in the Peace River basin, which is also under review by the BC government. 

Although the job is restricted to Canadian citizens or permanent residents, it is clear that the engineer will have to also answer to the project’s overseas partners since one requirement is to conduct:  “Overseas VIP workshops, including Value Engineering, Process Simplification, Process Optimization and Design to Capacity.”