Chevron takes over Kitimat LNG operations from Apache, EOG and Encana

logoChevronApache has a new partner in the Kitimat LNG project, Chevron Canada Ltd and, in effect,  Chevron is taking over the project from Apache who has been unable to find customers for the liquified natural gas project in Asia.

A news release from Apache announced “a broad agreement with Chevron Canada Limited to build and operate the Kitimat LNG project.”

Chevron Canada and Apache Canada each will become a 50 per cent owner of the Kitimat LNG plant, the Pacific Trail Pipeline and 644,000 gross undeveloped acres in the Horn River and Liard basins. Chevron Canada will operate the LNG plant, which will be located on the northern British Columbia coast, and the pipeline.  Apache will continue to develop shale gas resources at the Liard and Horn River basins in north eastern BC.

Encana and EOG Resources — currently 30 percent non-operating partners in Kitimat LNG and Pacific Trail Pipeline — will sell their interests to Chevron and exit the venture. As part of the transaction with Chevron, Apache will increase its ownership of the plant and pipeline to 50 percent from 40 percent.

G. Steven Farris, Apache’s chairman and chief executive officer said in the company news release, “This agreement is a milestone for two principal reasons: Chevron is the premier LNG developer in the world today with longstanding relationships in key Asian markets, and the new structure will enable Apache to unlock the tremendous potential at Liard, one of the most prolific shale gas basins in North America.” “With experience developing LNG projects, marketing expertise and financial wherewithal, Chevron is the preferred coventurer to join Kitimat LNG,” Farris said. “Apache has a proven record in finding and developing shale gas resources in Canada and is the logical operator for the upstream elements of the joint venture.”

In its news release, Chevron quoted  vice chairman George Kirkland as saying:  “The Kitimat LNG development is an attractive opportunity that is aligned with existing strategies and will drive additional long-term production growth and shareholder returns.”

“This investment grows our global LNG portfolio and builds upon our LNG construction, operations and marketing capabilities. It is ideally situated to meet rapidly growing demand for reliable, secure, and cleaner-burning fuels in Asia, which are projected to approximately double from current levels by 2025.”

The  two-train (stage) Kitimat LNG Project is still working through the Front-End Engineering and Design (FEED) phase. Construction has continued at the Bish Cove site throughout the summer but has slowed down to the uncertainty over the future of the project and some environmental problems.

Current plans call for two liquefaction trains, each with expected capacity of 5 million tons of LNG per annum (about 750 million cubic feet of gas per day). Kitimat has received all significant environmental approvals and a 20-year export license from the Canadian federal government.

The 290-mile (463-km) Pacific Trail Pipeline is planned to provide a direct connection between the Spectra Energy Transmission pipeline system and the Kitimat LNG terminal.

While the Apache release says: “The project has strong support from many of the First Nations along the route,”  there is no support at this moment from the Wet’suwet’en, in the area from Burns Lake through Smithers to the mountains, because some houses are strongly opposed to the pipeline on their traditional territory.

In the Apache news release, Farris says: “”We want to thank and acknowledge EOG and Encana for their contribution to the development of the Kitimat project. We appreciate the hard work of many employees and contractors to advance the project to this stage and the strong support the plant and pipeline projects have received from local communities, provincial and federal officials and the Haisla and other First Nations.

“Construction of the plant and pipeline will have a significant economic impact, and the operational phase will provide opportunities for employment as well as royalties and tax revenues for the Federal, Provincial and local governments for many years,” he said. “Chevron and Apache will continue to develop this project in a safe and environmentally responsible manner.”

As the news releases point out Chevron is a major player in Australia’s LNG projects, considered by many to be Canada’s rival in finding market for natural gas in Asia. Chevron is the operator and led marketing efforts at Wheatstone, a two-train plant with capacity of 8.9 million tons of LNG a year that is expected to commence operations in 2016. Chevron also operates the Gorgon LNG project in Australia and LNG Angola.

Much of the media attention is also on the deal for the natural resources northeastern BC, with, Chevron Canada acquiring approximately 110,000 net acres in the established Horn River Basin from Encana, EOG and Apache, and approximately 212,000 net acres in the Liard Basin from Apache. Chevron Canada Limited and Apache will each hold a 50 percent interest and Apache will operate these two natural gas resource developments.

In its news release, Encana concentrates on the natural gas deal, quoting Randy Eresman, Encana’s President & CEO, “This investment by Chevron, a multinational LNG player, represents a key step in the development of LNG export from Western Canada. Our main goal since we first acquired an interest in Kitimat LNG almost two years ago was to help ensure the progression of this project towards its development. While we are no longer a direct participant in this project, we continue to support LNG export as vital to diversifying markets for North American natural gas.”

The company goes on to say that: “The sale of Encana’s interest in the proposed Kitimat LNG export facility is consistent with the company choosing to focus on its core business. In addition, this transaction reduces Encana’s future capital commitments. The proceeds from this transaction will help to strengthen the balance sheet and provide further financial flexibility to fund capital programs and develop key and emerging resource plays.”

The Financial Post points out that “the Chevron deal leaves most of the LNG projects in the hands of foreign companies, which have competing interests in LNG projects across the world.” That means that the Haisla Nation, with its partnership with the BC LNG project, is one of the few Canadian players left in the LNG scramble.

 

PetroChina in multi-billion dollar LNG buying spree in Canada and Australia

PetroChina went on a multi-billion dollar natural gas buying spree Thursday, Dec. 13, 2012, picking up shares in operations in both Canada and Australia.

In Canada, Encana, one of the partners in the Kitimat LNG project, signed a joint venture arrangement with Phoenix Duvernay Gas, a wholly owned subsidiary of PetroChina, to explore and develop Encana’s extensive undeveloped Duvernay naturgal gas holdings in west-central Alberta. According to an Encana news release, Phoenix will gain a non-controlling 49.9 per cent interest in Encana’s approximately 445,000 acres in the Duvernay play for total consideration of C$2.18 billion.

Hours earlier, PetroChina agreed to pay $1.63 billion for BHP Billiton’s 10 per cent share for an Australian LNG development, known as Browse, that like the KM LNG project in Kitimat had been delayed by the uncertainty in the LNG market. The other partners in the Browse are Woodside Petroleum, Chevron Corporation, Royal Dutch Shell and BP.

Encana says the PetroChina/Phoenix investment is significant for the Duvernay, which Encana describes as a “liquids rich play” with potential for natural gas, butane and oi development.

THE Encana release quotes Randy Eresman, Encana President & CEO. “A transaction of this magnitude keeps us on track to create a more diversified commodity portfolio and maintain our balance sheet strength. It is a strong endorsement of Encana’s position as a reliable long term partner.”

The release also quotes Zhiming Li, Phoenix’s President & Chief Executive Officer, as saying The Duvernay project will combine Phoenix’s integrated upstream and downstream capabilities and financial resources with Encana’s proven resource play hub expertise. This joint venture will build a foundation for the successful development of the Duvernay play and help to diversify our business portfolio. Encana is our ideal long term partner for the development of our future natural gas business.”

The company goes on to say:

Having entered into several joint venture transactions in 2012, these types of arrangements have become an important part of Encana’s business model. Joint ventures help the Company to achieve a highly efficient deployment of capital throughout its vast exploration and development asset base as Encana transitions to a more diversified portfolio of commodities.

Significantly, the Encana release, while talking about LNG development and export, it makes no mention of the Kitimat KM LNG project, instead looking south to Louisiana.

These relationships have the potential to increase natural gas demand as a number of Encana’s partners are actively exploring opportunities to export liquefied natural gas (LNG), while some are industrial consumers looking to transition to natural gas as fuel for their operations. An example is a recent agreement with Nucor Energy Holdings (Nucor) which is designed to support Nucor’s increased use of natural gas for its facilities, such as its direct reduced iron facility currently under construction in Convent, Louisiana.

Reports say PetroChina paid a premium price for the Australian Browse natural gas project, anticipating that if it comes on stream, as planned in 2018, the current glut in the natural gas market will have eased and once again LNG will be a seller’s market.

The Browse project at James Price Point on the north-western coast of Australia is facing similar opposition to projects in British Columbia, including some of the site’s aboriginal landowners and from some environmental groups.

The opposition to the Australian Browse project, according to reports,  reflects a split in the local aboriginal community.  While Wikipedia says that 60 per cent of the local aboriginal people voted in favour of the project, there is also fierce opposition, according to the Australian Mining Journal, which reported in 2009:

[A] number of Traditional Owners, as part of the Save The Kimberley organisation, issued a statement which said there is not unanimous support for this site.

In a signed declaration, Traditional Owners have affirmed that they do not support the imposition of an industrial site on their country and will legally challenge the authenticity of any agreements entered into by the Kimberley Land Council supporting the proposal.

The statement said that “…many local Indigenous people are disgusted by the apparent abandonment of the established process put in place by the previous State government. Concerns include the threats made earlier in the year by the Premier regarding compulsory acquisition of land and the pre-empting of the Joint State and Commonwealth environmental and cultural assessment process via announcements by Woodside and the Premier.”

 

A company called Woodside Petroleum, which leads the LNG venture wants to build the “greenfield” onshore terminal but is facing competition from Shell’s proposed offshore floating LNG “given the land access challenges and soaring development costs in Australia,” even though Shell also has a stake in the Browse project.

The Encana PetroChina deal comes a week after the Conservative government approved the takeover of Nexen by the China National Offshore Oil Corporation (CNOOC) and the take over by the Malaysian state oil company Petronas of Progress Energy. Petronas and Progress Energy have announced plans for an LNG export facilty at Lelu Island, opposite Port Edward, near Prince
Encana spokesman Jay Averill told the Globe and Mail the Duvernay deal will not need approval from Investment Canada because PetroChina will only gain a 49.9-per-cent, non-controlling share of the specific Encana assets.

In Australia, in October, CNOOC bought a stake in Queensland Curtis LNG from British energy company BG. BG, in partnership with Spectra Energy has also announced plans for an LNG facility at Prince Rupert 

Related links

Petroleum Economist
PetroChina pays premium for Browse stake

Calgary Herald

PetroChina inks $2.18B deal with Encana Joint venture to invest $4 billion to develop Alberta Duvernay

 

 

Apache considering North American pricing for Kitimat LNG executives tell Miami conference

Apache is considering selling liquified natural gas shipped to Asia from Kitimat at North American prices, a industry-watching news site reports from an energy conference in Miami.

Argus Media says that Apache and its partners in KM LNG, EOG and Encana are still finding little interest in the original idea of selling the LNG at  the Asian base price, called Japan Cleared Customs price, which is a percentage of the price of oil.  The idea at that time was that profit would come from the difference between North American market price and the higher Asian price.

That was undercut when another group, Cheniere Energy, decided to sell natural gas to Asia from  its Sabine Pass export terminal in Louisiana based on the “Henry Hub”  North American market price for natural gas,  plus a 15 per cent surcharge and a reservation fee.

Argus says  Encana’s president for US operations Jeff Wojahn told investors at a Bank of America Merrill Lynch Global Energy Conference in Miami  that the Kitimat developers are now considering “options typical for the Gulf coast export projects.”

Argus also quotes  Apache manager of investor relations Castlen Kennedy as saying: ““Kitimat is progressing and we will announce a final investment decision (FID) soon. The local government is very supportive of us.”

Argus quotes Encana’s Wojahn as saying the FIB will come in the first quarter of 2013, using their own natural gas supplies. “All three of the partners have assets in the Horn River so it’s a natural area of development for the play. And the Horn River basin is a world-class shale gas basin, it’s waiting for an LNG pump, so it’s really positioned well.”

Apache delays Kitimat decision again, Wall Street Journal reports

The Wall Street Journal (subscription required) is reporting that Apache has once again delayed its decision whether or not to go ahead with the Kitimat LNG project.

So far there is no news release on the Apache site and no other media has matched the Wall Street Journal story.

Analysts are blaming the decision on the recent move by some players in the energy industry to sell natural gas to Asia at low  North American prices, rather than the world price, which is determined as a percentage of the price of oil.   A move by Asian countries to buy LNG at the lower North American market price would undercut the profitability of any LNG export project through Kitimat.

 

 

 

Kitimat LNG progressing–or is it?

At the District of Kitimat Council meeting on Monday, October 1, as part of Mayor Joanne Monaghan’s regular “good news” briefing, she told council that the Kitimat LNG  project continues to “progress positively.”  The news from Calgary on Tuesday, however, was not as promising.

Both Bloomberg News and the Calgary Herald reported that  Apache, which owns 40 per cent of the KM LNG partnership is worried about a recent decision by a rival gas company to sell natural gas to world markets at low North American prices rather than, as been customary up until now, as percentage of the world oil price. That differential gives the North American gas companies a profit in Asia and it is that profit difference that makes Kitimat attractive for LNG projects.

At the council meeting, Monaghan reported, quoting Apache’s  Apache’s Manager of Public and Government Affairs Natalie Poole-Moffatt, as saying that  Kitimat LNG will be opening a full time community office in downtown Kitimat near the City Centre mall in the near future.  Apache says renovations are nearly complete and they will be holding an open house in the near future.

Monaghan said that work on the Kitimat LNG site at Bish Cove continues with blasting to create proper elevation, crushing and sorting of rock and constructing an access route to the forest service road. This summer work began on the two year $25 million upgrades to the old forest service road “which will improve conditions on the road.”

However, in Calgary, the Herald quoted KM LNG vice-president David Calvert as saying “things are going so well that it has been decided to risk spending on clearing ground before completion of the front end engineering and development study and final investment decision.”

But according to several media reports,  Calvert told an Energy Roundtable in Calgary on Tuesday that a final go-ahead for Kitimat LNG is not a done deal. the Herald quoted Calvert as saying: “We remain convinced that oil-linked pricing is critical to the viability of our Canadian LNG industry.”

Bloomberg reported that a recent deal by Cheniere Energy Inc. to sell liquefied natural gas based on North American pricing (also known as Henry Hub pricing) means that it is difficult for Apache to find Asian customers to sign the long term LNG contracts needed to make the Kitimat project viable. (Asian LNG prices are based on the “Japan Customs Cleared Price” set by the Japanese government as a percentage of the price of crude oil).

Bloomberg quoted Calvert as saying: “It created quite a ripple through the marketplace,” and Bloomberg said, the Cheniere deal has created “unrealistic expectations.”

Related

Globe and Mail

Canadian gas producers dreaming big – again 

Canada losing the race to sell LNG

Updated

The Haynesville Shale

Cheniere Deal Hurts Canadian LNG Project

Cheniere is less sensitive to prices given its role as a middleman, while Apache, Encana and EOG are producers, for whom the price is very important.  One advantage of Kitimat is its west coast location, but that is only a minor cost advantage over Gulf Coast facilities.

The clock is ticking on Kitimat.  It sounds like Asian buyers are sitting on the sidelines waiting for lower prices.  Right now the U.S. government is sitting on future LNG approvals pending the release of a study around year-end.  If the U.S. approves the pending applications, a proverbial flood of LNG will come to market with Henry Hub-based pricing.  At that point Kitimat’s owners will be in a tough spot.  Kitimat is vital to B.C., but the economics might not work.

Wall Street Journal

Cheniere Lights a Match in the Gas Market

 

Minor oil leak at Bish Cove

In a report to District of Kitimat Council, Apache’s Manager of Public and Government Affairs,  Natalie Poole-Moffatt,  also reported that on September 19, an oil leak was spotted on a piece of heavy equipment at Bish Cove.  The report says;

WestCoast Marine was notified and booms were deployed as a preemptive measure in Bish Cove, no machine oil has migrated to Bish Cove. Environmental crews are on site executing a remediation plan.  Both the [BC] Provincial Emergency PLan (PEP) and Aboriginal and Northern Affairs Canada  were notified of the incident.

The piece of equipment  is currently being repaired and will undergo operational tests to ensure  the equipment can function without further concern.  Environmental staff will remain on the site 24/7 until remediation is complete.

Haisla, BC government sign agreement for third LNG facility at Kitimat

Updated with map, agreement details

Map of Haisla Framework Agreement
A map, released by the BC government, shows the area of Crown land covered by the Haisla Framework agreement that could lead to another LNG project in Kitimat. (Govt of BC)

The Haisla Nation and the BC government have signed an agreement that will lead to a third liquified natural gas project near Kitimat.

The “Haisla Framework Agreement” allows for the lease or sale of up to approximately 700 hectares of Crown land near the Douglas Channel, and for the foreshore lease of submerged lands of up to 102 hectares for a berthing facility.

 

The area is just north of the Haisla Reserve land  at Bish Cove where the KM LNG project will be located, but south of the proposed BC LNG and Enbridge terminals.  It is all undeveloped and unserviced land within the boundaries of the District of Kitimat.

That could mean, if all projects go ahead there the west side of Douglas Channel from Kitimat almost to Jesse Falls would see three, perhaps fourm hydrocarbon facilities and terminals.

The agreement provides the Haisla with the options for up to a 60-year lease or the possibility of purchasing of the land outright.

The agreement also commits both parties to start work on land-use planning for areas around the Douglas Channel, which, the BC government says, has tremendous potential as a marine port.

A news release from the BC government today does not specify the backer of the terminal, While the most obvious candidate could be the  Shell project LNG project (last fall Shell purchased the old Methanex site and the associated marine terminal at Kitimat) there is now media speculation that there could be other players involved, possibly another giant Exxon Mobile.

A news release from the BC government says that the “framework agreement” is a “significant step toward government’s commitment to have three terminals and their connecting pipelines operating by 2020, creating more than 1,400 ongoing jobs and generating an estimated $600 billion in economic activity over 30 years.”

The release says the agreement “provides the structure for a land purchase or lease that will Haisla Framework agreement logoallow the Haisla to partner with industry to develop a liquefied natural gas (LNG) facility and marine export terminal on the west side of the Douglas Channel in the areas around Haisla Reserve #6.”

The release quotes, Ida Chong,  BC Minister of Aboriginal Relations and Reconciliation  as saying:

Our government is working with First Nations like the Haisla to create new jobs and opportunities throughout British Columbia. This agreement builds on our strong partnership with the Haisla Nation, and it is the key to unlocking the vast potential of a whole new natural gas export industry in British Columbia which will provide long-term stability for families and communities.

It also  quotes Ellis Ross, Chief Councillor of the Haisla Nation: –

This agreement allows the Haisla to look at the land on the west side of the Douglas Channel in a different light. This gives the Haisla and associated projects the certainty needed for the LNG proposals and other projects coming forward for our territory. If we are able to do this, the Haisla people will benefit, as will all British Columbians and Canadians.

Ida Chong and Ellis Ross sign agreement
Ida Chong and Ellis Ross sign the Haisla Framework Agreement in Vancouver, Sept.14, 2012 (Govt of BC photo)

The release goes on to say that the agreement signals a closer working relationship between the Haisla and BC in and around the Kitimat and Douglas Channel area. It commits both parties to start work on land-use planning for areas around the Douglas Channel, which has tremendous potential as a marine port. This certainty will allow other development projects in the area to proceed.

The agreement says the Haisla will work independently to find a suitable partner for the development of the land. Details of the lease or sale are expected to be finalized this fall.

TransCanada to build Shell’s “Coastal Gaslink” natural gas pipeline to Kitimat

Trans Canada logoShell Canada and its Asian partners have chosen TransCanada Corporation to design, build, own and operate the proposed natural gas pipline to Kitimat, now called the Coastal GasLink project.

The estimated $4-billion pipeline will transport natural gas from the Montney gas-producing region near Dawson Creek, in northeastern British Columbia to the proposed natural gas export facility at Kitimat, BC.

The LNG Canada project is a joint venture led by Shell, with partners Korea Gas Corporation, Mitsubishi Corporation and PetroChina Company Limited.

A news release from TransCanada says “Shell and TransCanada are working toward the execution of definitive agreements on the Coastal GasLink project.”

In the release, Russ Girling, TransCanada president and CEO says:

Our team has the expertise to design, build and safely operate pipeline systems. We look forward to having open and meaningful discussions with Aboriginal communities and key stakeholder groups, including local residents, elected officials and the Government of British Columbia, where we will listen to feedback, build on the positive and seek to address any potential concerns. Coastal GasLink will add value to British Columbians, particularly Aboriginals and communities along the conceptual route, by creating real jobs, making direct investments in communities during construction and providing economic value for years to come.

TransCanada says the company has approximately 24,000 kilometres of pipelines in operation in western Canada including 240 kilometres of pipelines in service in northeast BC. Another 125 kilometres of proposed additions either already having received regulatory approval or currently undergoing regulatory review. These pipelines form an integral and growing part of TransCanada’s NOVA Gas Transmission Ltd. (NGTL) System, which brings natural gas from Alberta to British Columbia to a hub near Vanderhoof.

Girling said in the release:

TransCanada is a leading energy infrastructure company in North America, with a 60-year history of safe, efficient and reliable operation of our assets and a respect for the communities and environments where we operate. We appreciate the confidence that Shell and its partners have placed in us to build, own and operate this natural gas pipeline in British Columbia. We will work collaboratively with them, Aboriginals and other stakeholders as we launch into the initial phases of consultation and regulatory review.

LNG Canada logo

Project parameters

 

In it’s release TransCanada describes the potential Coastal GasLink pipeline project this way:

  • Receipt point: Near Dawson Creek, BC
  • Delivery point: Proposed LNG Canada facility near Kitimat, BC
  • Product: Natural gas from BC’s abundant Montney, Horn River and Cordova basins and elsewhere from the Western Canada Sedimentary Basin
  • Length of route: Approximately 700 kilometres of large diameter pipe
  • Initial pipeline capacity: In excess of 1.7 billion cubic feet of gas per day
  • Anticipated jobs: Estimated 2000-2500 direct construction jobs over a 2- during construction 3 year construction period
    Estimated cost: Detailed cost information will be developed following completion of project scoping and planning. The current estimate is approximately $4 billion
  • Regulatory process: Applications for required regulatory approvals are expected to be made through applicable BC provincial and Canadian federal processes
  • Estimated in-service date: Toward the end of the decade, subject to regulatory and corporate approvals

Pipeline route

TransCanada says: “The final pipeline route will take into consideration Aboriginal and stakeholder input, the environment, archaeological and cultural values, land use compatibility, safety, constructability and economics.:

Pacific Trails Pipeline
The Pacific Trails Pipeline would go cross country to Kitimat. (PTP)

At this point there are two possible routes for the pipeline west of Vanderhoof. One route would be to follow the existing Pacific Northern Gas route that roughly parallels Highway 16. The second possibility is a cross-country route, which may lead to controversy. The Pacific Trails Pipeline, which would feed the KM LNG partners (Apache, Encana and EOG) goes across the mountains from Smithers. While the PTP project has the approval of most First Nations in the regions, Apache and PTP are still in negotiations with some Wet’suwet’en houses over portions where the pipeline would cross the traditional territory of the houses. The much more controversial Enbridge Northern Gateway pipeline follows a similar cross-country route and faces much stiffer opposition than the Pacific Trails Pipeline, due to the content of that pipeline, mainly diluted bitumen and because, critics say, Pacific Trails managed to secure the most geologically stable cross country route earlier in this decade when the pipeline was originally planned to import, not export, natural gas.

TransCanada says the Coast Gaslink pipeline will also have an interconnection with the existing Nova Gas (NGTL System and the liquid NIT) trading hub operated by TransCanada.  The company says:

A proposed contractual extension of TransCanada’s NGTL System using capacity on the Coastal GasLink pipeline, to a point near the community of Vanderhoof, BC, will allow NGTL to offer delivery service to its shippers interested in gas transmission service to interconnecting natural gas pipelines serving the West Coast. NGTL expects to elicit interest in and commitments for such service through an open season process in late 2012.

That means that the Asian customers will not be just dependent on natural gas from northeast British Columbia.  Instead the “molecules” of natural gas from Alberta will join the stream heading to Kitimat. “Open season” in the energy industry is an auction where potential customers or transporters bid for use the pipeline.

In the release Girling says:

The potential Coastal GasLink pipeline project will allow British Columbians, and all Canadians, to benefit from the responsible development of valuable natural gas resources and will provide access to new markets for that gas. The project will also create substantial employment opportunities for local, skilled labourers and businesses as part of our construction team,” concluded Girling. “We know the value and benefits that strong relationships in British Columbia can bring to this project and we look forward to deepening those ties as our extensive pipeline network grows to meet market and customer needs.

TransCanada Corp. is no stranger to controversy, the company is the main proponent of the Keystone XL pipeline from Alberta to the US Gulf Coast. Portions of that pipeline were put on hold by President Barack Obama pending further review and Keystone has become a hot issue in the current American presidential election.

Apache expects first LNG cargo from Kitimat in 2016

Map of Apache Corp LNG projects in the Pacific Region
A map of Apache Corp's liquified natural gas projects, including Ktimat, as presented to the UBS conference on May 22, 2012 (Apache)

Apache said Tuesday, May 22, 2012, that it expects the first LNG cargo leave the Kitimat terminal for Asia sometime in 2016, with possible further expansion in the future.

Patrick Cassidy, director of Apache’s Investor relations division, was making a presentation to the UBS Global Oil and Gas Conference in Houston, Texas, on the company’s future plans.

One slide in the Power Point presentation summed up Apache’s Pacific strategy, both at Kitimat and its chief rival, the Wheatstone project in Western Australia.

Apache said the final investment decision for the first train or phase the Kitimat LNG is still expected later this year. Previous reports have indicated the decision will likely come in the fourth quarter as Apache and its partners line up customers in Asia.

Originally the KM LNG partners said the project would start up in 2015, but delays, including the unusually harsh winter in Kitimat, which slowed construction at the Bish Cove site,  and the search for customers for the natural gas, has pushed the date back to 2016.

Apache  Corp. owns 40 per cent the KM LNG partnership,  Canada’sEncana Corp. and EOG Resources each  own 30 per cent each.

Two other projects are planned for Kitimat, the smaller BC LNG co-owned by Houston-based investors and the Haisla Nation and a larger project announced last week by Royal Dutch Shell.

LINK: Apache presentation to UBS Conference

 

Apache posts job for Kitimat LNG construction manager

Apache CorporationThe Apache Corporation website has a posting for a construction manager for the Kitimat LNG project.

The posting says the job will initially based in Houston, Texas, with the manager coming to Kitimat sometime in the future.

The posting calls for the manager to provide an overall construction plan, co-ordinate and control the construction project from inception to completion aimed at meeting the Project’s requirements in order to produce a functionally and financially viable safe project that will be completed on time within the authorized budget and to the required quality standards.

Some of the job requirements give hints of the project to come:

  • Previous LNG Project experience including construction
  • Experience of modular and stick built construction
  • Working knowledge of safety system and management to maintain world class safety performance
  • Working knowledge environment system and management to maintain world class environmental performance
  • Knowledge of logistics in remote sites
  • Knowledge of heavy haul and lift works
  • Proven ability with advanced project management principles
  • Proven ability with people management
  • Experience in Canadian labor law and have deep experience working with unionized labor
  • Experience in working through cold weather climates

 

The site also has a posting for a Contracts and Procurement Manager.

Both postings expire on May 2, 2012.

Although Apache and its partners, Encana and EOG Resources now say that they have postponed the final go-ahead decision on the KM LNG project until the fourth quarter of 2012, as negotiations continue with Asian natural gas customers, the postings are indication that the project is progressing.