Enbridge files massive river oil spill study with the Joint Review Panel

Kitimat River map from Enbridge study
A Google Earth satellite map of the Kitimat River used as part of Enbridge Northern Gateway’s oil spill modelling study.

Enbridge Northern Gateway today filed a massive 11-volume study with the Joint Review Panel outlining possible scenarios for oil spills along the route including the Kitimat and Morice Rivers in British Columbia.

The study, carried out by three consulting firms, Stantec Consuting and AMEC Environmental & Infrastructure both of Calgary and RPS ASA of Rhode Island, is called “Ecological and Human Health Assessment for Pipeline spills.”

Overall the models created by study appear to be extremely optimistic, especially in light of recent events, such as the damning report on by the US
National Transportation Safety Board and the finding of violations by the US Pipeline and Hazardous Material Safety Administration with Enbridge operations during the 2010 Marshall, Michigan, spill and subsequent cleanup difficulties encountered by Enbridge.

The executive summary of the report begins by saying

This document presents conservatively developed assessments of the acute and chronic risk to ecological and human receptors in the unlikely event of a full bore pipeline break on the proposed Enbridge Northern Gateway Pipeline project. Three representative hydrocarbon types (condensate, synthetic oil
and diluted bitumen) were evaluated with releases occurring to four different rivers representing a range of hydrological and geographic characteristics, under both low-flow and high-flow conditions. The analysis indicates that that the potential environmental effects on ecological and human health from each hydrocarbon release scenario could be adverse and may be significant. However, the probability of the releases as considered in the assessment (i.e., full bore rupture, with no containment or oil recovery) is low, with return periods for high consequence watercourses ranging from 2,200 to 24,000 years. Therefore, the significant adverse environmental effects as described in this report are not likely to occur.

So the study says that it is “conservative” that means optimistic, that a full bore pipelink break with no containment or recovery is “an unlikely event” and would probably occur every 2,200 and 24,000 years. Not bad for a pipeline project that is supposed to be operational for just 50 years.

The summary does caution:

The analysis has also shown that the outcomes are highly variable and are subject to a great many factors including the location of the spill, whether the hydrocarbons are released to land or directly to a watercourse, the size of the watercourse, slope and flow volumes, river bed substrate, the amount of suspended particulate in the water, environmental conditions (such as the time of year, temperature and wind speeds, precipitation, etc.), the types of shoreline soils and vegetative cover and most significantly, the type and volume of hydrocarbon released.

The highly technical study is Enbridge’s official response to those intervenors who have “requested additional ecological and human health risk assessment studies pertaining to pipeline spills” and a request from the Joint Review Panle for more information about “the long term effects of pipeline oil spills on aquatic organisms (including the sensitivity of the early life stages of the various salmon species), wildlife, and human health.”

The report presents modelling on the release of three hydrocarbons, diluted bitumen, synthetic oil and condensate at four river locations along the pipeline route for their potential ecological and human health effects, under two flow regimes (i.e., high and low flow), broadly representing summer and winter conditions.

Modelling was done for four areas:

• Chickadee Creek: a low gradient interior river tributary discharging to a large river system
located up-gradient from a populated centre within the Southern Alberta Uplands region
• Crooked River: a low gradient interior river with wetlands, entering a lake system within
the Interior Plateau Region of British Columbia
• Morice River: a high gradient river system along the western boundary of the Interior
Plateau Region of British Columbia
• Kitimat River near Hunter Creek: a high gradient coastal tributary discharging to a large
watercourse with sensitive fisheries resources, downstream human occupation, and discharging to the Kitimat River estuary

In one way, the study also appears to be a partial victory for the Kitimat group Douglas Channel Watch because the model for the Kitimat River is based on a spill at Hunter Creek, which has been the subject of extensive work by the environmental group, but the consulting study is markedly optimistic compared to the scenario painted by Douglas Channel Watch in its presentations to District of Kitimat council.

The study describes the Kitimat River:

The hypothetical release location near Hunter Creek is southwest of Mount Nimbus, in the upper Kitimat  River watershed, and flows into Kitimat River, then Kitimat Arm, approximately 65 km downstream. The area is in a remote location and maintains high wildlife and fisheries values. The pipeline crossing near Hunter Creek is expected to be a horizontal direction drilling (HDD) crossing. The release scenario
assumes a discharge directly into Kitimat River…

The streambed and banks are composed of coarse gravel, cobbles and boulders. Shoreline vegetation (scattered grasses and shrubs) occurs in the channel along the tops of bars. Vegetation is scattered on the channel banks below the seasonal high water mark and more developed (i.e., grasses, shrubs and trees) bove the seasonal high water mark.

Wildlife and fish values for the Kitimat River are high: it is important for salmon stocks, which also provide important forage for grizzly bears, bald eagles and osprey on the central coast. The Kitimat River estuary, at the north end of Kitimat Arm, also provides year-round habitat for some waterbirds and seasonal habitat for staging waterfowl.

There is considerable recreational fishing, both by local people and through fishing guides, on Kitimat River, its estuary and in Kitimat Arm. There is also likely to be a high amount of non-consumptive recreational activity in the area, including wildlife viewing, hiking and camping. The Kitimat River estuary, for example, is well known for waterbird viewing.

While no fish were captured at this location during the habitat survey, salmonoid fry and coho salmon were observed downstream. Previously recorded fish species in the area include chinook, coho and chum salmon, rainbow trout, Dolly Varden, and steelhead trout.

However, the next paragraph appears to show that a full bore rupture on the Kitimat River would have widespread consequences because it would cover a vast area of First Nations traditional territory, saying

Aboriginal groups with traditional territories within the vicinity of the Kitimat River hypothetical spill scenario site include the Haisla Nation, Kitselas First Nation, Kitsumkalum First Nation, Lax-Kw’alaams First Nation and Metlakatla First Nation.

It also acknowledges:

Oral testimony provided by Gitga’at First Nation and Gitxaala Nation was also reviewed in relation to this hypothetical spill scenario, although the traditional territories of these nations are well-removed from the hypothetical spill site.

The report then goes on to list “the continued importance of traditional resources” for the aboriginal people of northwestern BC.

especially marine resources. People hunt, fish, trap and gather foods and plants throughout the area and traditional foods are central to feasting and ceremonial systems. Food is often distributed to Elders or others in the community. Written evidence and oral testimony reported that Coho, sockeye, pink, and spring salmon remain staples for community members. Halibut, eulachon, herring and herring roe,
various species of cod, shellfish, seaweed, and other marine life are also regularly harvested and consumed, as are terrestrial resources, including moose, deer, beaver, muskrat and marten. Eulachon remains an important trade item. Written evidence provides some information on seasonality of use and modes of preparation. Seaweed is dried, packed and bundled and preserved for later use. Each species of
salmon has its own season and salmon and other fish are prepared by drying, smoking, freezing or canning. Salmon are highly valued and often distributed throughout the community…

Some areas used traditionally are not depicted geographically. Upper Kitimat River from the Wedeene River to the headwaters has long been used for trapping, hunting, fishing and gathering of various foods. Fishing, hunting and gathering activities take place along the lower Kitimat River and its tributaries. Marine resources are collected in Kitimat Arm, Douglas Channel, and Gardner Canal. Old village and
harvesting sites are located along the rivers and ocean channels in this vicinity.

Intertidal areas are important and highly sensitive harvesting sites that support a diversity of species. Many intertidal sites are already over harvested and are therefore vulnerable. Conservation of abalone has been undertaken to help the species recover. Some concern was expressed in oral testimony regarding the
potential for archaeological sites and the lack of site inventory in the area. Oral testimony made reference to the Queen of the North sinking and the potential for a similar accident to result in human health and environmental effects.

A spill at Hunter Creek

The model says that all three types of floating oil in Kitimat River under high-flow conditions would reach approximately 40 kilometres downstream from Hunter Creek while low-flow conditions showed variation.

Under what the study calls low flow conditions, most condensate would evaporate. The bitumen would cause “heavy shore-oiling” for the first 10 kilometres, with some oiling up to 40 kilometres downstream.

The most sedimentation would occur for synthetic oil, and the least for condensate. Synthetic oil under both flow conditions would have the largest amounts deposited to the sediments. This is because of the low viscosity of synthetic oil, which allows it to be readily entrained into the water where it may combine with suspended sediments and subsequently settle. Synthetic oil under high-flow conditions would result in the most entrained oil and so the most extensive deposition to the sediment. Diluted bitumen, for both flow conditions, would result in the most deposited on shorelines, with the remainder (except that which evaporated or degraded) depositing to the sediments.
The condensate also would also have significant entrainment, but higher winds prevailing in under low flow conditions would enhance evaporation and rapidly lower concentrations in the water as compared to high-flow conditions. In all scenarios, a large amount of entrained oil and high concentrations of dissolved aromatics would move down the entire stretch of Kitimat River and into Kitimat River estuary.

Long term scenario

The modelling appears to be extremely optimistic when it reaches four to six weeks after the pipeline breach, especially in light of the continued cleanup efforts in Michigan, estimating that the “fast-flowing” nature of the Kitimat River would disipate all the different forms of hydrocarbon in the study saying

 a fast-flowing coastal river like Kitimat River, with gravel or cobble bottom would be affected by a large volume of crude oil released in a short period of time.

Oiling of shoreline soils is heavy in the reaches between the release point and 10 km downstream, becoming lighter to negligible beyond 10 km. Deposition of hydrocarbons to river sediment is greatest for the synthetic oil and diluted bitumen (high flow) scenarios extending up to 40 kilometres downriver, with predicted hydrocarbon concentrations in sediment approaching 1,000 mg/kg dry weight. Deposition of hydrocarbons to river sediment is considerably lighter for the diluted bitumen (low flow) and condensate scenarios. In these scenarios, oiling of river sediment is negligible….

It says that within four weeks of the end of the acute phase of the spill scenarios, concentrations in river sediments and river water would decline becoming quite low at the end of two years.

As for the affects on plants and invertebrates:

Oiling of shorelines would be extensive, particularly at assessment locations within 10 kilometres of the pipeline break location, under both the high and low flow scenarios, for synthetic oil and condensate. High loadings occur as far as 25 kilometres downstream, again asusming that damage would begin to disipate after four weeks declining over the next one to two years. Predicted effects are generally less severe for the diluted bitumen spill scenarios, due to lower expected loading of oil onto shorelines. Low to negligible shoreline oiling would occur for Kitimat River under most of the scenarios at the 40 kilometres assessment location and points downstream. Based on this assessment, very little oiling of shorelines would extend to the estuary and the environmental effects would be minimal.

The study goes on to say that the “model suggests that there would be no significant risk to fish health based upon chronic exposure to petroleum hydrocarbons  for the oil spill scenarios in Kitimat River or the potentially affected areas within the estuary, either at four weeks or one to two years following the hypothetical spill events. Risk to developing fish eggs in Kitimat River and estuary at four weeks and one to two years again indicate no significant risk to developing fish eggs in spawning gravels.”

It also claims that “chronic risks” to wildlife would be minimal, with some elevated risk for “muskrat, belted kingfisher, mallard duck, spotted sandpiper and tree swallow,” if they were exposed to synthetic oil. The muskrat, mallard duck and spotted sandpiper
could be vulnerable to bitumen and diluted bitumen.

It then claims that “no significant effects of chronic exposure (to all hydrocarbons) would occur for grizzly bear, mink, moose, river otter, bald eagle, Canada goose, herring gull or great blue heron for the Kitimat River hydrocarbon spill scenarios.”

Again, it appears from the sutdy that the spotted sandpiper would be most vulnerable to “bulk weathered crude oil exposure” includingcondensate, diluted bitumen and synthetic oil.

For the Kitimat section it concludes:

In the unlikely event of an oil spill, recovery and mitigation as well as the physical
disturbance of habitat along the watercourse would be likely to substantially reduce the exposure of wildlife receptors to hydrocarbons as compared to the scenarios evaluated here.

Link to Volume One of the Enbridge Northern Gateway Report Ecological and Human Health Assessment for Pipeline Spills

US Pipeline and Hazardous Material Safety Admin cites Enbridge for violations in Kalamazoo spill, wants $3.7 million fine

Updated with Enbridge statement

The United States Pipeline and Hazardous Materials Safety Administration today cited Enbridge for a series of violations in connection with the pipeline rupture and bitumen spill at Mashall, Michigan,  in 2010 and is proposing the company be fined a record $3.7 million.

A letter issued today, July 2, 2012, from the PMHSA  to Richard Adams, Vice President, U.S. Operations, Enbridge Energy Limited Partnership, lists a series of alleged failures by Enbridge.

The letter says the investigation began on July 26, 2010, the day after the Enbridge Energy Limited Partnership’s 30-inch diameter Line 6B pipeline ruptured near Marshall, Michigan on July 25, spilling 20,000 barrels of crude and contaminating 38 miles of the Kalamazoo River.

That investigation, the letter says, turned up numerous violations of US regulations including, safety rules, faulty risk analysis, failure to follow proper operation and management procedures and problems with reporting and operator qualification requirements.

The PHMSA alleges that Enbridge violated 24 regulations for pipeline safety and procedures, with civil penalties ranging from $41,200 to $1,000,000 for a total of $3.7 million.

None of the allegations have been proven and Enbridge is free to contest the filings and allegations and ask for a hearing.

In a news release, Enbridge responded:

Enbridge appreciates the hard work and due diligence that PHMSA has put into this investigation,” said Stephen J. Wuori, President, Liquids Pipelines, Enbridge Inc. “Safety has always been core to our operations. Enbridge completed a detailed internal investigation of this incident in the fall of 2010 and has made numerous enhancements to the processes and procedures in our control center since the Line 6B accident, including the training provided to pipeline operators, and has made significant changes in this critical component of our operations. Incident prevention, detection and response have also been enhanced. We will carefully examine the NOPV to determine whether any further adjustments are appropriate.

The letter says the investigation began on July 26, 2010, the day after the Enbridge Enbridge Energy Limited Partnership’s 30-inch diameter Line 6B pipeline ruptured near Marshall, Michigan on July 25, spilling 20,000 barrels of crude and contaminating 38 miles of the Kalamazoo River.

That investigation, the letter says, turned up numerous violations of US regulations including, safety rules, faulty risk analysis, failure to follow proper operation and management procedures and problems with reporting and operator qualification requirements.

The letter also outlines what happened during the spill, as seen through the eyes of PHMSA investigators.

According to the letter, the Enbridge pipeline failed despite a series of In-Line Inspections that the company had performed on the pipeline. Those inspections, the PHMSA investigators say found “multiple corrosion and crack-like anomalies on the pipe joint that failed on July
25, 2010.” It is alleged that Enbridge did not conduct any field examination of the reported anomalies before the accident.

According to the PHMSA, there was actually a crack detection being performed on Line 6B on the day of the failure and the testing equipment was left in the pipeline until the after the line was restarted on September 27, 2010.

The reports says the Michigan pipeline ruptured at 17:58 EDT on July 25, 2010, approximately 0.6 miles downstream of the company’s Marshall pumping station. At the time, Enbridge’s Edmonton Control Center  (CCO) was in the process of starting a scheduled 10-hour shutdown of the pipeline.

The PHMSA report says:

as soon as the failure occurred, the CCO received multiple alarms and indications of abnormal operations on Line 6B, but the company did not execute its suspected-leak or emergency procedures. Instead, Enbridge allowed the pipeline to remain idle as part of the Scheduled Shutdown for approximately 10 hours, during which time a new shift came on duty at the CCO, which brought in a new set of controllers, supervisors, and support personnel.

At approximately 04:00, on July 26, 2010, Enbridge initiated the scheduled start-up of Line 6B … Within minutes, the CCO received multiple alarms and indications of abnormal operating conditions, which indicated that the pressure at the Marshall pumping station had not increased as expected and the imbalance between the volume of product injected into the pipeline and the volume of product being delivered from the pipeline exceeded established thresholds. Again, Enbridge did not execute its suspected leak or emergency procedures. Instead, Enbridge continued to pump crude oil into the line while the controller, supervisors, and support personnel evaluated the situation.

After an hour, the Edmonton control centre abandoned the attempted restart and shut down the pipeline. During the time Enbridge was trying to restart the pipeline, an additional 10,460 barrels of crude oil was injected into the pipeline.

The PHMSA report says that the Enbridge control room was monitoring the “lack of typical pressure and flow conditions for this pipeline configuration and alarms.” Control room supervisors contacted managers and the decision was made to restart the pipeline a second time, which began at 0720 on July 26.

Again the Enbridge control “received multiple alarms and indications of abnormal
operating conditions.”

Enbridge continued to pump oil for another 31 minutes sending 5,831 barrels of oil into the pipeline.

By this time supervisors and managers were discussing the possibility of a suspected leak but no one activated Enbridge’s spill procedures. The second restart was halted at 0751 at which time a new shift took over the control room.

Enbridge managers “discussed the two restart attempts, resulting in the Line 6B controller
conducting further investigation into the historical operating information on the line but
taking no action to deal with a spill.”

It was three hours and fifteen minutes after the shift change, at 11:18 on July 26, roughly 17 hours after the failure occurred, that the Enbridge control room received an emergency call from an employee of a local gas company, Consumers Energy, reporting oil in a creek near Marshall, Michigan.

It was at that point that Enbridge closed remotely operated valves on each side of the reported leak, isolating three miles of pipeline on either side of the rupture. It was then that Enbridge activated its emergency procedure and field personnel were sent to the scene. The field personnel confirmed the spill to the Edmonton control room at 11:43.

On July 28, the Pipeline and Hazardous Materials Safety Administration issued “a Corrective Action Order” to Enbridge requiring the company to take action to protect the public, property, and the environment. “Amongst other things, the Corrective Action Order required a pressure reduction, verification of pipeline integrity, integration of information, and provisions for ensuring ongoing safe operation considering all risk factors.”

The letter then cites Enbridge for the following alleged violations:

Pipeline integrity management in high consequence areas

The letter says that after an integrity assessment of Line 6B, Enbridge failed to obtain, within 180 days, sufficient information about anomalous conditions presenting a potential threat to the integrity of Line 6B. Enbridge conducted a high-resolution integrity assessment of Line 6B on October 13, 2007 and received the “vendor report” on June 4, 2008. The citation says “The 180 day deadline was April 10, 2008. Enbridge did not demonstrate that the 180 day period was impracticable.”

The report says Enbridge implemented pressure restrictions on the pipeline on July 17, 2009, approximately 462 days after the deadline to have sufficient information to identify anomalous conditions. A year later, according to the PHMSA, Enbridge submitted a “Long Term Pressure Reduction Notification” to PHMSA on July 15, 2010. The date of discovery was reported by Enbridge as July 17, 2009 not June 2008.

US regulations require pipeline companies to fix “corrosion anomalies” in pipelines with 180 days. The citation says that starting back as far as 2004, Enbridge “did not schedule remediation of
corrosion anomalies involving the longitudinal weld seam of pipe joint #217720, that is the joint that eventually ruptured causing the spill. The report says Enbridge also did not remediate crack-like anomalies on the same pipe joint… that could impair the integrity of the pipeline” and “Enbridge could not demonstrate that the company attempted or scheduled any remediation of the corrosion or crack anomalies that were identified by the assessments” nor did Enbridge schedule that joint for excavation prior to the rupture.

Risk analysis

The PHMSA alleges that Enbridge failed to consider all relevant risk factors associated with the determination of the amount of product that could be released from a rupture on the pipeline. Enbridge’s risk analysis process also assumed a pipeline rupture of this magnitude would be identified by its leak detection instrumentation within five minutes, and that it would take an additional three minutes to close remotely operated valves on either side of the rupture.

Before the spill, Enbridge had estimated the worst case scenario at the that location would be a release 1,670 barrels initially with another 1938 barrels released during “drain down” for a total of3,608 barrels

The actual failure scenario demonstrates the rupture was not recognized by Enbridge, and the isolation valves were not closed, until approximately 17 hours after it occurred. An additional 16,431 barrels of product was injected into the ruptured pipeline, causing the total spill volume to greatly exceed Enbridge’s worst case discharge scenario for this location.

Evaluation

The PHMSA letter alleges that “Enbridge did not properly consider the results of corrosion and cracking assessments nor did Enbridge integrate the information from these assessments to
properly assure overall pipeline integrity.”

While the investigation revealed that while “Enbridge has a long history of performing
integrity assessments” those assessment results “were evaluated independently and not integrated in a fashion that assures pipeline integrity.”

General Requirements

The PHMSA says US regulations require that whenever an operator discovers any condition that could adversely affect the safe operation of its pipeline system, “it shall correct it within a
reasonable time,” adding that “if the condition is of such a nature that it presents
an immediate hazard to persons or property, the operator may not operate the affected part of the system until it has corrected the unsafe condition.”

The letter says” “Enbridge failed to correct a condition that could affect the safe operation of a
pipeline within a reasonable time following discovery. Enbridge discovered the
condition as a result of …. instrumentation alarms and events that alerted
within seconds and minutes of the rupture…”

Since the alarms would have indicated conditions that could adversely affect the safe operation of the pipeline,” the PHMSA says: “The expected initial corrective action is to notify appropriate company and emergency response personnel to investigate and mitigate the effects of any unsafe conditions. This was not done until approximately 17 hours after discovery of the conditions.”

The letter says Enbridge did not follow established written procedures for responding to,
investigating, and correcting the cause of pressure outside of normal operating
limits during the shutdown and Enbridge did not notify responsible personnel in accordance with
the procedure. It says that Enbridge has not developed a specific written procedure for responding to an Invalid Pressure Alarm, but has instead developed a written procedure for required actions based on alarm severity.

For an S6-Severe Alarm, the procedures require the controller to: (1) Notify the Shift Lead; (2) Advise on site/on-call personnel; (3) Create a F ACMAN (Enbridge term for Facility Management record-keeping system used to documents abnormal operating conditions).

The PHMSA says “Enbridge failed to take any of these required actions.”

It goes on to allege that Enbridge did not follow established written procedures for responding to,
investigating, and correcting the cause of pressure in the pipeline that were outside of normal operating limits and goes on to say that Enbridge has not developed a specific written procedure for responding to a Low Suction Pressure Alarm.

As in the previous case, Enbridge’s procedures were based on “alarm severity.”

For an S4-Warning Alarm, the procedures require (1) Discretionary controller response to alarm dependent on operating conditions, (2) Notify the Shift Lead if unsure of response, (3) If multiple S4 alarms are active for a related issue, the response and severity may be raised, ( 4) FACMAN creation may be required, (5) Advise on-site/on-call personnel if required.

Again the PHMSA alleges: “ Enbridge did not take any of the above actions, or any
other actions, in response to this alarm. The fact the Marshall suction pressure
abruptly dropped to 0 psig, which was unexpected and abnormal, dictates followup
investigative actions in accordance with the procedure, in order to determine
the reason/source of the alarm.”

The report says that Enbridge did not follow established written procedures for responding to, investigating, and correcting the cause of an unintended shutdown at the Marshall Unit and Enbridge also did not notify responsible personnel in accordance with the procedure.

Emergencies

The PHMSA says Enbridge did not take necessary action to minimize the volume of hazardous
liquid released in the event of a failure or notify police during an emergency, even though that was required by Enbridge’s own emergency notification procedures, saying that the shift lead in the Edmonton control room should have initiated the procedures at 18:03, on July 25, when an alarm went off.

Enbridge policy on leak “triggers” that is “unexplained abnormal operating conditions or events that indicate a leak” requires that a number of procedure be started once a leak trigger is detected. The PHMA says neither the suspected leak or confirmed leaks procedures were executed by the Edmonton control room nor were managers, field personnel and local police notified.

Public Awareness

The PHMSA letter says that Enbridge did not evaluate the effectiveness of its public awareness program in accordance with the written procedures. The company’s plan calls on the public awareness manager to “informally assess the effectiveness of public awareness efforts” each year, but the PHMSA says “Enbridge could not demonstrate this was being performed.”

The investigation identified a number of instances where actions taken by members of the PAP target audience were not in accordance with the program message (e.g. not associating the odour with that of a possible crude oil release, not contacting Enbridge’s Emergency Number in response to the odour complaints, and entry into the spill area by untrained individuals).

The release resulted in a number of local residents being displaced, contamination of approximately 38 miles of the Kalamazoo River, and contamination of affected fish and wildlife.

Accident reporting

The PHMSA also alleges that Enbridge failed to properly report the incident to the proper authorities, in this case the US Department of Transportation. It says Enbridge failed to accurately report the time of failure and other significant facts relevant to the extent of damages associated with a pipeline rupture which occurred at 17:58, on July 25, 2010. According to the PHMSA, Enbridge incorrectly reported the time the accident was discovered as 09:45 July 26 and also reported the material had not reached the Kalamazoo River yet, and that the release was secured.

According to the letter, investigative interviews show that the Edmonton control room personnel were aware that there were abnormal conditions on the pipeline, that “the rupture had likely occurred when the pipeline was shutdown, the night before” that “the release was not secured, as oil was moving down the Kalamazoo River. The impacts to people, property, and the environment were immediately obvious when emergency response actions were initiated.” The letter says that Enbridge did not file follow up reports to augment the initial report to Department of Transportation nor did it “currently available accident information” to the DOT within 30 days.

A report filed by Enbridge on August 25, 2010, again misreported the time of the spill, now calling it “11:41 on July 26, 2010, when it had been clear within hours of discovery that the failure date and time was approximately 17:58 on July 25, 2010.” It goes on to say that Enbridge report “also did not indicate the number of general public evacuated, even though daily EPA Pollution Reports indicated the number of residences that were evacuated, and Enbridge paid for alternative lodging for these evacuees as necessary.” It also alleges that some of the technical details in that August report on pipeline pressure were inaccurate and goes on to say that some subsequent reports filed by Enbridge were inaccurate although “the correct information has been known by the operator for some time.”

One example was that a witness told investigators on December 5, 2011 indicated that Enbridge determined the total costs of damages associated with the Line 6B rupture were currently $720
million but the value reported in a report filed on February 22, 2011 report was $550 million. The PHMSA says: “It is unknown at what point the $720 million value was determined by Enbridge, but the reported value was not updated until March 6, 2012, approximately 3 months after the interview.”

Employee qualifications

The PHMSA report alleges that Enbridge allowed an “unqualified individual to perform covered tasks (operating a pipeline) without direct observation by a qualified individual.” It says a previously qualified controller, who had been off duty for an extended period of time, was operating the pipeline console, and a qualified controller was assigned to oversee the operations.

According to the investigation “the qualified pipeline controller, even though seated adjacent to the un-qualified pipeline controller, was performing other tasks, and not directing and observing line operations, as required by the written procedures.” The report says that after multiple alarms went off “the unqualified pipeline controller did not respond to the alarms in full accordance with the operator’s written procedures, and the qualified pipeline controller’s oversight of the operations was insufficient to ensure that the required actions were taken.

In its news release, Enbridge added:

Enbridge has worked closely and cooperatively with all federal and state agencies, including PHMSA and the National Transportation Safety Board (NTSB) throughout the investigation of the Line 6B accident, and is now reviewing the NOPV in detail. Enbridge will not comment specifically on the contents of the NOPV until it completes that analysis.

On June 18, 2012, Lorraine Little, Enbridge senior manager of US public affairs, liquids operations and projects,  appeared before District of Kitimat Council. At that time, Little outlined how the company was working on clean up operations. She also said Enbridge had improved its operations and emergency response since the Michigan incident but would not go into detail, due to ongoing investigations and litigation in the United States.

.

PHMSA notice of possible violation to Enbridge Energy

 

 

 

Haisla Nation, in JRP filing, “take offence” at implication of Enbridge’s funding questions

Haisla NationThe Haisla Nation, in its response to a series of questions about funding posed by Enbridge through the Joint Review process, has replied that it “ takes offence at the implication that its participation in the Joint Review Panel process is strictly to oppose the Northern Gateway Project.”

The funding questions by Enbridge were, in effect, a political fishing expedition by the energy company, because in one question Enbridge was asking about money that may have come from the charity Tides Canada, which is now subject a concerted attack by the Conservative government and right-wing  columnists in the business media.

In its response to Enbridge, the Haisla Nation says it has received no funding from Tides Canada.

The Haisla Nation, however, does detail what funding it has received, including some from Enbridge, and then counters that with details of just how expensive it is to participate in the Joint Review Process.

The Haisla say that in December, 2009, the First Nation asked the Canadian Environmental Assessment Agency for $1,593,900 for participating in the Joint Review Panel process over the next two years.

According to the document filed with the JRP, the Haisla Nation says the Canadian Environmental Assessment Agency offered $371,500, leaving a shortfall of $1,222,400.

The Haisla say that they have now reviewed that original application and the First Nation “notes that even the $1,593,900 sought in the original application for participant funding would not be enough to cover these costs.”

The Haisla acknowledge that they did receive funding from Enbridge Northern Gateway The Haisla Nation has received funding from the Northern Gateway “to prepare and provide a traditional use study in relation to the proposed project,” without stating the actual amount, adding that participating in the JRP has created a deficit “costing the Haisla Nation funds that will need to be diverted from other pressing projects and issues.”

Enbridge’s next question asked if the Haisla Nation was a member of the Turning Point/Great Bear Initiative and therefore had received funding for “opposing the Northern Gateway Project?”
The Haisla reply that:

The Haisla Nation takes offence at the implication that its participation in the Joint Review Panel process is strictly to oppose the Northern Gateway Project. As set out above, the Haisla Nation is participating in the Joint Review Panel process as it is currently the only process for assessing the proposed project. This process has been imposed without meaningful consideration of Haisla Nation concerns, and the Haisla Nation is participating despite an unlevel playing field.

The Haisla Nation has not received funding from the Turning Point/Great Bear Initiative to participate in the Joint Review Panel proceedings, to oppose the Northern Gateway Project, or for any other purpose regarding the Northern Gateway Project.

The Haisla then emphasize:

The Haisla Nation has not received funding from Tides Canada or similar organizations, either directly or indirectly, to participate in the Joint Review Panel proceedings, to oppose the Northern Gateway Project, or for any other purpose regarding the Northern Gateway Project.

The next question from Enbridge not only asked about the personal finances of members of the Haisla Nation council, but also showed that even after years of involvement with First Nations, Enbridge still hasn’t done its homework and can’t even spell “Kitamaat.”

Enbridge asked:

Have any members of the Kitimaat Village Council received funding from Tides Canada or similar organizations to participate in this proceeding or to otherwise oppose the Northern Gateway Project, either directly or indirectly? If so, how much funding was received and by whom?

The Haisla reply by saying

This question is beyond the scope of matters currently before the Joint Review
Panel. Nevertheless, the Haisla Nation offers the following information:

“Kitimaat Village Council” is a misspelling of the former name of the Haisla
Nation Council. The Haisla Nation Council is the elected government of the
Haisla Nation.

The document then lists the names of the current members of the Haisla Nation Council (which are available to Enbridge and everyone else on the Haisla Nation website) and goes on to say:

The Haisla Nation Council is governed by rules and a code of ethics that require disclosure of any potential conflicts of interest. If any member of Haisla Nation Council had received funding from Tides Canada or similar organizations in their personal capacity, they would have had to disclose this to Council.

None of these members have received funding from Tides Canada or similar organizations, either directly or indirectly, to participate in the Joint Review Panel proceedings, to oppose the Northern Gateway Project, or for any other purpose regarding the Northern Gateway Project.

The final question from Enbridge asked the Haisla, in the financial disclosure to
“include funding received by the Headwaters Initiative.”

The Haisla reply:

Headwaters Initiative has no affiliation with the Haisla Nation Council. The Haisla Nation Council has no information about funding received by Headwaters Initiative.

That question again shows again that despite years of involvement in northwestern British Columbia, Enbridge hasn’t done its homework, since the Headwaters Initiative is an environmental organization with members from not only the Haisla Nation but also non-aboriginal residents of both Kitimat and Terrace.

It appears that Enbridge was asking those questions as part of a preparation for a “follow the money” spin campaign building on the work of blogger Vivian Krause and her right-wing supporters in the business media. If so, so far,  it hasn’t worked out very well for Enbridge.
Haisla Nation Response to NGP Information Request  (pdf)

Haisla outline where they believe Enbridge Gateway plans are inadequate

Haisla NationIn their filing with the Joint Review Panel, the Haisla Nation point to what they say is inadequate information provided by Enbridge on the Northern Gateway project, including:

To date the material provided by Northern Gateway does not adequately explain the known risks inherent to the proposed project and lacks significant detail with  respect to the extent and degree of potential effects. The material provided by  Northern Gateway does not provide sufficient information to determine how the  risks inherent to the proposed project will be minimized, nor how the potential for  significant adverse effects will be avoided.

There are a number of areas where the Haisla Nation has identified inadequateinformation, including but not limited to:

.
Design: there is a lack of information about detailed design  considerations and monitoring procedures for pipeline integrity to avoid  accidents and malfunctions due to corrosion, seismic events, and terrain  instability. A notable example of this problem is in the Kitimat River  Valley, where Northern Gateway has identified a high level of risk but has  not offered any solutions. Another is the concern about the corrosive nature of the material to be transported. Northern Gateway denies that  this is a problem, yet the US Department of Transportation Pipeline and
Hazardous Material Safety Administration (PHMSA) has commissioned a  major study to investigate the corrosive nature of diluted bitumen in pipelines.

Materials to be transported: there is a lack of information about the fate, behaviour and effects of diluted bitumen, synthetic crude and condensate in the cold water marine and freshwater environment. This concern has been identified by federal government participants as well as by numerous intervenors, and Northern Gateway has acknowledged the need for more research and information. Yet, Northern Gateway has not agreed to undertake this work so that it is available for review in this process.

Volume of material to be transported: Northern Gateway’s application is for a pipeline that will transport 525,000 barrels of diluted bitumen per day. Yet the pipeline will be built to have a capacity of up to 850,000 barrels per day, and Northern Gateway’s application materials identifies future phases with increased volumes up to this amount. The risk assessments conducted by Northern Gateway are premised on 525,000 barrels per day, and fail to contemplate higher volumes which would affect a number of matters, including but not limited to: pipeline risk; volume of potential spills; and tanker traffic volume. The risk assessment needs to be revised, to address the risks associated with the pipeline transporting 850,000 barrels of diluted bitumen per day. Without this revision, Northern Gateway is asking the JRP to conduct its assessment on incomplete information that, by definition, understates the true potential risk of the proposed project.

.Baseline information: Northern Gateway has not undertaken the studies necessary to generate baseline ecosystem assessments for the Kitimat River drainage and Kitimat Arm, including seasonal habitat utilization by species and life stages throughout the watershed. This information is necessary to determine both stream crossing construction strategy and to assess the potential impacts of a spill, as well as to determine how to respond to a spill and when. A ‘one-size fits all’ approach to stream crossings during construction and spill response, when adequateinformation about seasonal habitat utilization by species and life stages throughout the watershed is lacking, is not adequate. This information is needed to determine when construction can proceed and what timeframe limitations there are for activities, to ensure that adverse effects to fish and wildlife are avoided. This information is also required, should a spill occur, to enable a proper assessment of the extent and degree of adverse effects as well as to provide a proper basis for restoration of affected habitat.

Past spills: there is a lack of information about the cause, effects, emerging information and lessons learned as a result of Enbridge’s large diluted bitumen spill into the Kalamazoo River. We know that 3,785,400 liters of diluted bitumen were pumped out of the pipeline, with a largeportion of that ending up in to the Kalamazoo River. We know the large volume of the spill was the result of numerous attempts to re-pressurize the pipeline despite repeated spill alarms being triggered. We know that government agencies stepped in to manage the spill because Enbridge’s response was not swift enough. We know that Enbridge’s clean-up costs to date exceed insurance coverage. We know that two years later Enbridge is still under a clean-up mandate from the US Environmental Protection Agency and the Michigan Department of Environmental Quality, and that portions of the Kalamazoo River are still closed to recreational use. What we do not know, however, is what the cause of the pipeline rupture was, what Enbridge has learned about how diluted bitumen behaves once it is released into the environment, or how a local population that relies on the river for fishing, for traditional harvesting and gathering of foods and medicines would have been affected.

Oil spill response: there is a lack of information about oil spill response and planning, including best practices, best available technology and the local on-site equipment and personnel required full-time to respond properly to a spill. This is largely due to the lack of adequate baseline information on which to base response planning. Further, Northern Gateway has demonstrated an unwillingness to fully consider how spill response would be carried out until it receives a certificate for its project.

Yet Northern Gateway seeks to rely on spill response as a mitigation strategy. If Northern Gateway seeks to rely on spill response as a mitigation strategy, it should provide in detail, prior to project approval, what its oil spill response would include and demonstrate that it is logistically, technologically and economically feasible. Northern Gateway has not done this.

.Mitigation measures: there is a lack of information about existing proven mitigation measures and their effectiveness in cleaning up an oil spill, restoring habitat and regenerating the species dependent on the affected habitat. This should be evaluated as part of project review, prior to project approval. Where Northern Gateway seeks to rely on a mitigation measure as a basis for project approval, it must demonstrate that the proposed mitigation will actually work.

Avoidance of any significant adverse effects must be the primary goal and dictate the design and location of the proposed project. Mitigation (e.g. complete resolution) of any potential environmental effects should be the preferred option, when all efforts to avoid such effects fail. Compensation for environmental effects must be a last resort and relied on only when best efforts have been made to avoid or mitigate effects. Unfortunately, the material submitted by Northern Gateway suggests that compensation is the primary option and lack of evidence on project design and procedures makes it impossible to evaluate how potential effects could be avoided or mitigated.

For example, Northern Gateway proposes to have spill interception points (river control points) along the Kitimat River Valley as part of its mitigation, but has no realistic plan in place that takes into consideration response delay times, rates of transportation, access issues or baseline ecosystem, fish and wildlife information for the receiving environment.

 

 

Main story Haisla Nation confirms it opposes Northern Gateway, demands Ottawa veto Enbridge pipeline; First Nation also outlines “minimum conditions” if Ottawa approves the project

Haisla Nation Response to NGP Information Request  (pdf)

Haisla outline conditions, concerns for Northern Gateway project

Haisla NationIn its extensive document filed with the Northern Gateway Joint Review panel, the Haisla Nation emphasize their opposition to the project.

However, the Haisla are anticipating that the project will be approved and  therefore submitted a lengthy series of conditions for that project, should it be imposed on the northwest by the federal government.

Nevertheless, if the project were to be approved AFTER the Crown meaningfully consulted and accommodated the Haisla Nation with respect to the impacts of the proposed project on its aboriginal title and rights, and if that consultation were meaningful yet did not result in changes to the proposed project, the following conditions would, at a minimum, have to be attached to the project.

 

1. Conditions Precedent: The following conditions precedent should be met prior to any field investigations, pre-construction activities or construction activities as well as during and subsequent to such investigations or activities. These conditions are necessary to ensure that potential effects of the project can be avoided or mitigated to reduce the likelihood of habitat damage or destruction:

Comprehensive seasonal water quality monitoring throughout the Kitimat River watershed, Kitimat Arm and Douglas Channel that account for seasonal variations in flow, tidal cycles, snowmelt, rainfall, etc.

Parameters for measurement would be have to be agreed upon by the
Haisla Nation prior to certification of the project;

Comprehensive seasonal fisheries surveys of fish habitat utilization  throughout the Kitimat River watershed, Kitimat Arm and Douglas Channel that account for where species and life stages are at different times of the year and accurately define sensitive habitats;

Comprehensive seasonal wildlife and bird surveys of habitat utilization throughout the Kitimat River watershed, Kitimat Arm and Douglas Channel that account for where species and life stages are at different times of the year and accurately define sensitive habitats;

Comprehensive seasonal vegetation surveys of habitat utilization throughout the Kitimat River watershed, Kitimat Arm and Douglas Channel that accounts for the distribution of species and life stages at different times of the year and accurately define sensitive habitats;

Development of comprehensive spill response capability based on a realistic assessment of spill containment, spill response and spill capacity requirements throughout the Kitimat River Valley, Kitmat Arm and Douglas Channel. The Haisla Nation’s past experience has shown that relying onpromises is not good enough. This spill response capability must be demonstrated prior to project approval;

Verification that the proposed project would result in real benefits, economic or otherwise, that would flow to the Haisla Nation, to other First Nations, and to British Columbia.

Whenever any field investigations or activities are proposed, the proposal or permit application would have to include the following environmental protections:

Soil and erosion control plans;

Surface water management and treatment plans;

Groundwater monitoring plans;

Control and storage plans for fuels, lubricants and other potential contaminants;

Equipment deployment, access and use plans;

Habitat reclamation of disturbed or cleared areas.

Prior to any pre-construction or construction activities the following detailed studies would have to be undertaken and provided to the Haisla Nation for review and approval, to ensure that the best design and construction approaches are being used, so that potential effects of the project can be avoided or mitigated to reduce the likelihood of habitat damage or destruction:

Detailed analysis of terrain stability and slide potential throughout the pipeline corridor and at the storage tank and terminal site;

Detailed engineering design to mitigate seismic risk and local weather extremes;

.Development of pipeline integrity specifications and procedures including
best practices for leak detection;

Development of storage tank integrity specifications and maintenance and monitoring procedures;

Assessment of spill containment, spill response and spill capacity requirements throughout the Kitimat River watershed, Kitimat Arm and Douglas Channel;

.Development of detailed tanker acceptance program specifications and
procedures;

Development of detailed tanker and tug traffic management specifications and procedures;

Development of detailed port management specifications and procedures including operating limits for tanker operation, movement and docking.

2. Ongoing Consultation: A commitment to ongoing consultation with and accommodation of the Haisla Nation on all of the activities set out above.

3. Ongoing process for variance, waiver or discharge of conditions: A commitment to ongoing meaningful involvement of the Haisla Nation by the National Energy Board prior to any decision on any changes to or sign off on conditions and commitments to any certificate that is issued.

4. Third Party Oversight of Construction: A requirement that NorthernGateway fund a third party oversight committee, which should include a Haisla Nation representative, to monitor certificate compliance during construction of the marine terminal and the pipeline. This committee would have the ability to monitor and inspect construction and should be provided with copies of allcompliance documents submitted by Northern Gateway to the National Energy Board.

5. Operational Conditions: A number of operational conditions should beincorporated into the certificate, including but not limited to:

The requirement to monitor terrain along the pipeline so that breaches based on earth movements can be anticipated and prevented;

The requirement to implement automatic pipeline shutdown whenever a leak detection alarm occurs;

Conditions on the disposal of any contamination that must be removed as a result of an accident or malfunction resulting in a spill that will minimize additional habitat destruction and maximize the potential for regeneration of habitat and resources damaged by the spill;

Parameters for terminal and tanker operations (including standards for tankers allowed to transport cargo; tanker inspection requirements and schedules; escort tug specifications, standards, maintenance and inspection; pilotage protocols and procedures; environmental conditions and operating limits; etc.) as well as other parameters set out in and reliedon for the TERMPOL review to become conditions of any certificate issued by the National Energy Board, with a provision that the Haisla Nation’s approval of any changes to these conditions is required.

Answering the questions from Enbridge Northern Gateway, the Haisla also outline a long series of concerns.

1. Physical and Jurisdictional Impacts

1.1 Construction

The Haisla Nation is concerned about the direct physical and jurisdictional impacts that the construction of the proposed project will have. These concerns are set out for each of the marine terminal, the pipeline, and tanker traffic, below:

Marine Terminal:

a. The proposed marine terminal will require the alienation of 220-275
hectares (554-680 acres) of land from Haisla Nation Territory, land
to which the Haisla Nation claims aboriginal title.

b. The terminal will require the additional alienation of land for
ancillary infrastructure and development, including:

i. road upgrades,

ii. perimeter access roads and roads within the terminal area,

iii. a potential public bypass road,

iv. an impoundment reservoir,

v. a disposal site for excess cut material outside the terminal
area,

vi. a new 10km long transmission powerline, and

vii. a 100-m waterlot with a 150-m “safety zone”.

c. The terminal proposes to use Haisla Nation aboriginal title land,
including foreshore and waters, in a way that is inconsistent with
Haisla Nation stewardship of its lands, waters and resources and
with the Haisla Nation’s own aspirations for the use of this land.
Since aboriginal title is a constitutionally protected right to use the
aboriginal title land for the purposes the Haisla Nation sees fit, this
adverse use would fundamentally infringe the aboriginal title of the
Haisla Nation.

d. The terminal will require the destruction and removal of
documented culturally modified trees, some with modifications
dating back to 1754. These culturally modified trees are living
monuments to the history of the Haisla people.

e. The terminal will expose two Haisla Nation cultural heritage sites to
increased risk of vandalism and chemical weathering.

f. The terminal will result in the direct loss of 4.85 hectares (11.98
acres) of freshwater fish habitat (harmful alteration, disruption or
destruction (HADD) under the Fisheries Act).

g. The terminal will require dredging, underwater blasting, and
placement of piles and berthing foundations, resulting in an as yet
un-quantified loss of intertidal and subtidal marine habitat.

Pipeline:

a. The proposed pipeline construction right-of-way will require the
alienation of 9,200 hectares (22,734 acres) of Haisla Nation
Territory – land to which the Haisla Nation claims aboriginal title –
and will put this land to a use that is inconsistent with Haisla Nation
stewardship of its lands, waters and resources and with the Haisla
Nation’s own aspirations for the use of this land.

b. The pipeline will require 127 watercourse crossings in Haisla Nation
Territory. Seven of these are categorized as high risk, 5 as
medium high risk, and 7 are medium or medium low risk for harmful
alternation, disruption or destruction (HADD) of fish habitat. This
risk is just from pipeline construction and does not address the
issue of spills.

c. The pipeline is estimated to result in temporary or permanent
destruction of freshwater fish habitat of 3.1 hectares (7.68 acres) in
Haisla Nation Territory.

d. The pipeline will require the clearing of land and vegetation and the
destruction of wetlands. The extent of this is yet to be quantified.

Tanker Traffic:

a. Although Northern Gateway has not made any submission on this
point, it is clear that having adequate spill response capability at
Kitimat will require additional infrastructure upgrades in and around
Kitimat, as well as potential spill response equipment cache sites.
None of this has been considered or addressed in Northern
Gateway’s application material – as such the material is
incomplete.

b. The construction for this additional infrastructure could result
impacts to ecosystems, plants, wildlife and fish, and in additional
HADD or fish mortality from accidents.

All of the land alienations required for the proposed project would profoundly
infringe Haisla Nation aboriginal title which is, in effect, a constitutionally
protected ownership right. The proposed project would use Haisla Nation
aboriginal title land in a way that is inconsistent with Haisla Nation stewardship of
its lands, waters and resources and with the Haisla Nation’s own aspirations for
the use of this land. Since aboriginal title is a constitutionally protected right to
use the aboriginal title land for the purposes the Haisla Nation sees fit, this
adverse use would fundamentally infringe the aboriginal title of the Haisla Nation.

The Haisla Nation is also concerned about the socio-economic and health
impacts of the proposed project. Northern Gateway has yet to file its Human
Health and Ecological Risk Assessment. Further, the socio-economic impact
analysis submitted as part of the application provides only a limited assessment
of the potential impacts of the project on the Haisla Nation at a socio-economic
level.

Haisla Nation society and economy must be understood within the cultural
context of a people who have lived off the lands, waters and resources of their
Territory since long before European arrival. To limit a socio-economic impact
assessment to direct impacts and to ignore consequential impacts flowing from
those impacts fails to capture the potential impacts of the proposed project on the
Haisla Nation at a socio-economic level.

1.2 Operation

The proposed marine terminal, pipeline corridor and shipping lanes will be
located in highly sensitive habitats for fish, wildlife and plants. Any accident of
malfunction at the wrong time in the wrong place can be devastating ecologically.
The Haisla Nation has identified the following concerns relating to physical
impacts from the operation of the proposed project:

Marine Terminal:

a. Intertidal and subtidal marine habitat impacts as a result of marine
vessels.
b. The likelihood of spills from the marine terminal as a result of operational
mistakes or geohazards.

c. The effects and consequences of a spill from the marine terminal. This
includes impacts on the terrestrial and intertidal and subtidal marine
environment and fish, marine mammals, birds, and other wildlife, as well
as impacts on Haisla Nation culture and cultural heritage that could result
from such impacts.

d. Response to a spill from the marine terminal, including concerns about
spill response knowledge, planning and capability, as well as impacts
flowing from response measures themselves.

Pipeline:

a. The likelihood of spills from the pipeline as a result of pipeline failure,
resulting from inherent pipeline integrity issues or external risks to pipeline
integrity, such as geohazards.

b. The effects and consequences of a spill from the pipelines. This includes
impacts on the terrestrial environment and freshwater environment, and
on plants, fish, birds, and other wildlife, as well as impacts on Haisla
Nation culture and cultural heritage that could result from such impacts.

c. Response to a spill from the pipelines, including concerns about spill
response knowledge, planning and capability, as well as impacts flowing
from response measures themselves.

Tanker Traffic:

a. Increased vessel traffic in waters used by Haisla Nation members for
commercial fishing and for traditional fishing, hunting and food gathering.

b. The likelihood of spills, including condensate, diluted bitumen, synthetic
crude, and bunker C fuel and other service fuels, from the tankers at sea
and at the marine terminal.

c. The effects and consequences of a spill. This includes impacts on the
marine environment and fish, marine mammals, birds, and other wildlife,
as well as impacts on Haisla Nation culture and cultural heritage that could
result from such impacts.

d. Response to a spill, including concerns about spill response knowledge,
planning and capability, as well as impacts flowing from response
measures themselves.

e. Potential releases of bilge water, with concerns about oily product and
foreign organisms.
These issues are important. They go to the very heart of Haisla Nation culture.
They go to the Haisla Nation relationship with the lands, waters, and resources of
its Territory. A major spill from the pipeline at the marine terminal or from a
tanker threatens to sever us from or damage our lifestyle built on harvesting and
gathering seafood and resources throughout our Territory.

Northern Gateway proposes a pipeline across numerous tributaries to the Kitimat
River. A spill into these watercourses is likely to eventually occur. The evidence
before the Panel shows that pipeline leaks or spills occur with depressing
regularity.

One of Enbridge’s own experiences, when it dumped 3,785,400 liters of diluted
bitumen into the Kalamazoo River, shows that the concern of a spill is real and
not hypothetical. A thorough understanding of this incident is critical to the
current environmental assessment since diluted bitumen is what Northern
Gateway proposes to transport. However, nothing was provided in the application
materials to address the scope of impact, the level of effort required for cleanup
and the prolonged effort required to restore the river. An analysis of this incident
would provide a basis for determining what should be in place to maintain
pipeline integrity as well as what should be in place locally to respond to any spill.

The Kalamazoo spill was aggravated by an inability to detect the spill, by an
inability to respond quickly and effectively, and by an inability to predict the fate
of the diluted bitumen in the environment. As a result, the Kalamazoo River has
suffered significant environmental damage. The long-term cumulative
environmental damage from this spill is yet to be determined.

Further, the Haisla Nation is also concerned about health impacts of the
proposed project and awaits the Human Health and Ecological Risk Assessment
which Northern Gateway has promised to provide.

1.3 Decommissioning

Northern Gateway has not provided information on decommissioning that is detailed enough to allow the Haisla Nation to set out all its concerns about the potential impacts from decommissioning at this point in time. This is not good enough. The Haisla Nation needs to know how Northern Gateway proposes to undertake decommissioning, what the impacts will be, and that there will be financial security in place to ensure this is done properly.

2. Lack of Consultation

 

Broadly, the Haisla Nation has concerns about all three physical aspects of the
proposed project – the pipeline, the marine terminal and tanker traffic – during all
three phases of the project – construction, operation and decommissioning.
These concerns have not been captured or addressed by Northern Gateway’s
proposed mitigation. The Haisla Nation acknowledges that a number of these
concerns can only be addressed through meaningful consultation with the
Crown. The Haisla Nation has therefore repeatedly asked federal decision-
makers to commit to the joint development of a meaningful consultation process
with the Haisla Nation. The federal Crown decision-makers have made it very
clear that they have no intention of meeting with the Haisla Nation until the Joint
Review Panel’s review of the proposed project is complete.

The federal Crown has also stated that it is relying on consultation by NorthernGateway to the extent possible. The federal Crown has failed to provide anyclarity, however, about what procedural aspects of consultation it has delegated to Northern Gateway. Northern Gateway has not consulted with the Haisla Nation and has not advised the Haisla Nation that Canada has delegated any aspects of the consultation process.

The Haisla Nation asserts aboriginal title to its Territory. Since the essence of

aboriginal title is the right of the aboriginal title holder to use land according to its
own discretion, Haisla Nation aboriginal title entails a constitutionally protected
ability of the Haisla Nation to make decisions concerning land and resource use
within Haisla Nation Territory. Any government decision concerning lands,
waters, and resource use within Haisla Nation Territory that conflicts with a
Haisla lands, waters or resources use decision is only valid to the extent that the
government can justify this infringement of Haisla Nation aboriginal title.

The Supreme Court of Canada has established that infringements of aboriginal
title can only be justified if there has been, in the case of relatively minor
infringements, consultation with the First Nation. Most infringements will require
something much deeper than consultation if the infringement is to be justified.
The Supreme Court has noted that in certain circumstances the consent of the
aboriginal nation may be required. Further, compensation will ordinarily be
required if an infringement of aboriginal title is to be justified [Delgamuukw].

The Haisla Nation has a chosen use for the proposed terminal site. This land
was selected in the Haisla Nation’s treaty land offer submitted to British Columbia
and Canada in 2005, as part of the BC Treaty Negotiation process, as lands
earmarked for Haisla Nation economic development.

The Haisla Nation has had discussions with the provincial Crown seeking to
acquire these lands for economic development purposes for a liquefied natural
gas project. The Haisla Nation has had discussions with potential partners about
locating a liquefied natural gas facility on the site that Northern Gateway
proposes to acquire for the marine terminal. The Haisla Nation sees these lands
as appropriate for a liquefied natural gas project as such a project is not nearly
as detrimental to the environment as a diluted bitumen export project. This use,
therefore, is far more compatible with Haisla Nation stewardship of its lands,
waters and resources.

By proposing to use Haisla Nation aboriginal title land in a manner that is
inconsistent with Haisla Nation stewardship of its lands, waters and resources,
and that interferes with the Haisla Nation’s own proposed reasonable economic
development aspirations for the land, the proposed project would result in a
fundamental breach of the Haisla Nation’s constitutionally protected aboriginal
title.

Similarly, Haisla Nation aboriginal rights are constitutionally protected rights to
engage in certain activities (e.g. hunting, fishing, gathering) within Haisla Nation
Territory. Government decisions that infringe Haisla Nation aboriginal rights will
be illegal unless the Crown can meet the stringent test for justifying an
infringement.
Main story Haisla Nation confirms it opposes Northern Gateway, demands Ottawa veto Enbridge pipeline; First Nation also outlines “minimum conditions” if Ottawa approves the project

Haisla Nation Response to NGP Information Request  (pdf)

Haisla Nation confirms it opposes Northern Gateway, demands Ottawa veto Enbridge pipeline; First Nation also outlines “minimum conditions” if Ottawa approves the project

Haisla NationThe Haisla Nation has confirmed in a filing with the Northern Gateway Joint Review Panel that it opposes the Enbridge Northern Gateway project.

The document, filed June 29, 2012, is one of the most significant filed with the JRP during all the years of the debate over the controversial Northern Gateway, setting out a three stage process that will govern, whether Enbridge or the federal government like it or not, the future of the Northern Gateway pipeline project.

First, the Haisla Nation affirms that it opposes the Northern Gateway project

Second, the Haisla Nation is demanding that the federal government, in recognition of aboriginal rights and title, reject the Northern Gateway project on Haisla traditional territory.

Third, probably anticipating that Stephen Harper and his government will attempt to force the Northern Gateway on British Columbia, the Haisla are demanding meaningful consultation and set out a stringent set of minimum conditions for the project on Haisla traditional territory.

The Haisla Nation’s lawyers filed the document today late today, June 29, in response to a series of questions posed to the First Nation by Enbridge through the Joint Review process.

The Haisla also say that there already projects that are better suited to their traditional territory, the liquified natural gas projects.

The Haisla position that Ottawa must reject the pipeline if First Nations oppose it is the opening round in the constitutional battle over not just the pipeline, but entire question of aboriginal rights and title. So far the government of Stephen Harper has said that First Nations do not have a “veto” on the pipeline and terminal project.

The Haisla also refuse to answer questions that Enbridge posed on the liquified natural gas projects because the filing argues, the questions are beyond the scope of the current Joint Review inquiry.


Detailed excerpts

Haisla outline where they believe Enbridge Gateway plans are inadequate

Haisla outline conditions, concerns for Northern Gateway project

 


 

Why the Haisla oppose Northern Gateway

In the filing with the Joint Review panel, the Haisla outline nine reasons for opposition to the Northern Gateway project:

1. Northern Gateway is proposing to site its project in a location that places at risk the ecological integrity of a large portion and significant aspects of Haisla Nation Territory and resources.

2. All three aspects of the proposed project – the pipelines, the marine terminal and tankers – have the potential to impact Haisla Nation lands, waters and resources.

3. Northern Gateway has neither conducted sufficient due diligence nor provided sufficient information with respect to the assessment of a number of critical aspects of the proposed project, including but not limited to project design, impacts, risks, accidents and malfunctions, spill response, potential spill consequences and the extent, degree and duration of any significant adverse environmental effects.

4. There are significant risks of spills of diluted bitumen, synthetic crude, and condensate from corrosion, landslide hazards, seismic events along the pipeline route and at the terminal site; as well asloss of cargo or service fuels from tanker accidents, with no realistic plan provided for spill containment, cleanup, habitat restoration or regeneration of species dependent on the affected habitat.

5. Diluted bitumen, synthetic crude and condensate are all highly toxic to the environment and living systems and the consequences and effects of a spill could be devastating on the resources that support the Haisla Nation way of life, and would therefore have significant adverse effects on Haisla Nation culture and cultural heritage and aboriginal rights.

6. Risk assessments and technology have not overcome the potential for human error, wherein it is well established that 80% of oil tanker accidents that cause oil spills at sea are a result of human errors: badly handled manoeuvres, neglected maintenance, insufficient checking of systems, lack of communication between crew members, fatigue, or an inadequate response to a minor incident
causing it to escalate into a major accident often resulting in groundings and collisions (http://www.black-tides.com/uk/source/oil-tanker-accidents/causes-accidents.php). It has also become increasingly obvious that maintenance of pipeline integrity and the remote detection of pipeline ruptures is inadequate as exemplified by major environmental damage from recent pipeline ruptures in Michigan and Alberta.

7. The proposed project requires the alienation of Haisla Nation aboriginal title land, and the federal government has refused to engage in consultation with the Haisla Nation about the potential impacts of the proposed project on Haisla Nation aboriginal rights, including aboriginal title.

8. The proposed project would require the use of Haisla Nation aboriginal title land for a purpose that is inconsistent with Haisla Nation stewardship principles and with the Haisla Nation’s own aspirations for this land.

9. For the reasons set out above, the proposed project would constitute an unjustified infringement of Haisla Nation aboriginal title and rights. It would therefore be illegal for the Crown to authorize the project.

Canada is obliged to decline approval of the project

Up until now, the federal government has refused to engage First Nations in the northwestern region over the issue of the Northern Gateway pipeline and terminal, saying that the constitutionally mandated consultation will take place after the Joint Review Panel has released its report. However, the government’s Bill C-38, which gives the federal cabinet (actually the prime minister) the power to decide the pipeline means that the JRP report will be less significant than it would have been before the Conservatives gained a majority government in May, 2010.

The Haisla say the nation has “repeatedly requested early engagement by federal government decision-makers to develop, together with the Haisla Nation, a meaningful process for consultation and accommodation in relation to the proposed project.”

The filing says JRP and “the federal government’s ‘Aboriginal Consultation Framework’ have been imposed on the Haisla Nation and other First Nations, with significant aspects of the concerns expressed by the Haisla Nation about this approach being ignored.”

The Haisla says it “continues to seek a commitment from the federal government to the joint development of a meaningful process to assess the proposed project and its potential impacts on Haisla Nation aboriginal rights, including aboriginal title.”

Later in the filing the Haisla say:

The Haisla Nation has…  repeatedly asked federal decision-makers to commit to the joint development of a meaningful consultation process with the Haisla Nation. The federal Crown decision-makers have made it very clear that they have no intention of meeting with the Haisla Nation until the Joint Review Panel’s review of the proposed project is complete…

The federal Crown has failed to provide any clarity, however, about what procedural aspects of consultation it has delegated to Northern Gateway. Northern Gateway has not consulted with the Haisla Nation and has not advised the Haisla Nation that Canada has delegated any aspects of the consultation process.

The Haisla then go on to say:

Canada is legally required to work with the Haisla Nation to develop and follow such a process. If the process establishes that the approval of the proposed project would constitute an unjustified infringement of Haisla Nation aboriginal rights or aboriginal title, then Canada would be legally obliged to decline approval.

Deficiencies and Conditions

Enbridge asked the Haisla that if there are conditions of approval that would nonetheless
address, in whole or in part, the Nation’s concerns; and then asked for details “on the nature of any conditions that the Haisla Nation would suggest be imposed on the Project, should it be approved.”

The Haisla reply that because there are “significant deficiencies in the evidence provided by Northern Gateway to date.” The nation goes on to say that “the acknowledged risks that have not been adequately addressed in the proposed project.” The Haisla Nation then says it “does not foresee any conditions that could be attached to the project as currently conceived and presented that would eliminate the Haisla Nation’s concerns.”

The Haisla then repeat that Enbridge has not provided sufficient information so that

it is difficult for the Haisla Nation to identify conditions to attach to the proposed project as it is still trying to fully understand the potential impacts of the project and the proposed mitigation. This is primarily because there is insufficient information provided by Northern Gateway in its application material.

Although we have attempted to elicit additional information through the JRP’s information request process, Northern Gateway has not provide adequate and complete answers to the questions posed.

The Haisla then anticipate that Stephen Harper will force the pipeline and terminal on British Columbia and say:

Nevertheless, if the project were to be approved AFTER the Crown meaningfully
consulted and accommodated the Haisla Nation with respect to the impacts of
the proposed project on its aboriginal title and rights, and if that consultation were
meaningful yet did not result in changes to the proposed project, the following
conditions would, at a minimum, have to be attached to the project.

The emphasis of the word “after” is in the original document.

The document that then goes on to present an extensive list of list of conditions the Haisla believe should be imposed on the Enbridge Northern Gateway if the project goes ahead.

The conditions include comprehensive monitoring of water quality, fisheries, wildlife and birds, vegetation throughout the Kitimat River watershed, Kitimat Arm and Douglas Channel; development of comprehensive spill response capability throughout the Kitimat River Valley, Kitmat Arm and Douglas Channel.

The Haisla also want soil and erosion control plans; water management plans; control and storage plans for fuels, lubricants and other potential contaminants; detailed plans for equipment deployment and habitat reclamation of disturbed or cleared areas.

The Haisla also want much more detailed studies before any construction, including analysis of terrain stability and slide potential throughout the pipeline corridor and at the storage tank and terminal site; engineering designs to mitigate seismic risk and local weather extremes; development of pipeline integrity specifications and procedures including best practices for leak detection; storage tank integrity specifications, maintenance and monitoring; assessment of spill containment, spill response and spill capacity requirements throughout the Kitimat River watershed, Kitimat Arm and Douglas Channel.

On tankers the Haisla want more details beyond the plans already filed by Enbridge including
detailed tanker specifications, detailed tanker and tug traffic management procedures; detailed port management specifications and procedures including operating limits for tanker operation, movement and docking.

The Haisla are also demanding “on going consultation” on all issues involved by the National Energy Board prior to any decision on any changes to or sign off on conditions and commitments to any certificate that is issued.

The Haisla want an independent third party be part of a committee to oversee the construction proecess to monitor certificate compliance during construction of the marine terminal and the pipeline.

Once the pipeline and terminal operational, the Haisla want conditions imposed on the project that include ongoing monitoring of the terrain along the pipeline, a system that would automatically shut down the pipeline shutdown whenever a leak detection alarm occurs.

The Hasila want conditions “on the disposal of any contamination that must be removed as
a result of an accident or malfunction resulting in a spill that will minimize additional habitat destruction and maximize the potential for regeneration of habitat and resources damaged by the spill.”

As well as more detailed parameters for the tankers, tugs, and pilotage procedures, the Haisla want approval of any future changes in those procedures.

The Haisla are also concerned about the “alienation” of a large area of their traditional territory by the construction of the Northern Gateway project as well as the “additional infrastructure” required by adequate spill response capability and spill response equipment cache sites.

The Haisla say “all of the land alienations required for the proposed project would profoundly
infringe Haisla Nation aboriginal title which is, in effect, a constitutionally protected ownership right” and goes on to say “proposed project would use Haisla Nation aboriginal title land in a way that is inconsistent with Haisla Nation stewardship of its lands, waters and resources and with the Haisla Nation’s own aspirations for the use of this land.”

The Haisla filing then goes on to say:

Since aboriginal title is a constitutionally protected right to use the aboriginal title land for the purposes the Haisla Nation sees fit, this adverse use would fundamentally infringe the aboriginal title of the Haisla Nation.

The report also expresses concerns about the ongoing socio-economic affects of such a large project.

It concludes by saying:

These issues are important. They go to the very heart of Haisla Nation culture.
They go to the Haisla Nation relationship with the lands, waters, and resources of
its Territory. A major spill from the pipeline at the marine terminal or from a
tanker threatens to sever us from or damage our lifestyle built on harvesting and
gathering seafood and resources throughout our Territory.

Northern Gateway proposes a pipeline across numerous tributaries to the Kitimat
River. A spill into these watercourses is likely to eventually occur. The evidence
before the Panel shows that pipeline leaks or spills occur with depressing
regularity.

One of Enbridge’s own experiences, when it dumped 3,785,400 liters of diluted
bitumen into the Kalamazoo River, shows that the concern of a spill is real and
not hypothetical. A thorough understanding of this incident is critical to the
current environmental assessment since diluted bitumen is what Northern
Gateway proposes to transport. However, nothing was provided in the application
materials to address the scope of impact, the level of effort required for cleanup
and the prolonged effort required to restore the river. An analysis of this incident
would provide a basis for determining what should be in place to maintain
pipeline integrity as well as what should be in place locally to respond to any spill.

The Kalamazoo spill was aggravated by an inability to detect the spill, by an
inability to respond quickly and effectively, and by an inability to predict the fate
of the diluted bitumen in the environment. As a result, the Kalamazoo River has
suffered significant environmental damage. The long-term cumulative
environmental damage from this spill is yet to be determined.

Looking to the future, the Haisla are also asking for a plan for the eventual decommissioning of the project, pointing out that “ Northern Gateway has not provided information on decommissioning that is
detailed enough to allow the Haisla Nation to set out all its concerns about the
potential impacts from decommissioning at this point in time.”

Haisla leaders have already expressed concern about the legacy of the Eurocan paper plant. Now it tells Enbridge

This is not good enough. The Haisla Nation needs to know how Northern Gateway proposes to undertake decommissioning, what the impacts will be, and that there will be financial security in place to ensure this is done properly.

Asserts aboriginal title

The section of the report concludes by saying:

The Haisla Nation asserts aboriginal title to its Territory. Since the essence of
aboriginal title is the right of the aboriginal title holder to use land according to its
own discretion, Haisla Nation aboriginal title entails a constitutionally protected
ability of the Haisla Nation to make decisions concerning land and resource use
within Haisla Nation Territory. Any government decision concerning lands,
waters, and resource use within Haisla Nation Territory that conflicts with a
Haisla lands, waters or resources use decision is only valid to the extent that the
government can justify this infringement of Haisla Nation aboriginal title.

The Supreme Court of Canada has established that infringements of aboriginal
title can only be justified if there has been, in the case of relatively minor
infringements, consultation with the First Nation. Most infringements will require
something much deeper than consultation if the infringement is to be justified.
The Supreme Court has noted that in certain circumstances the consent of the
aboriginal nation may be required. Further, compensation will ordinarily be
required if an infringement of aboriginal title is to be justified [Delgamuukw].

The Haisla then go on to say that the preferred use of the land in question is for the liquified natural gas projects:

The Haisla Nation has a chosen use for the proposed terminal site. This land
was selected in the Haisla Nation’s treaty land offer submitted to British Columbia
and Canada in 2005, as part of the BC Treaty Negotiation process, as lands
earmarked for Haisla Nation economic development.

The Haisla Nation has had discussions with the provincial Crown seeking to
acquire these lands for economic development purposes for a liquefied natural
gas project. The Haisla Nation has had discussions with potential partners about
locating a liquefied natural gas facility on the site that Northern Gateway
proposes to acquire for the marine terminal. The Haisla Nation sees these lands
as appropriate for a liquefied natural gas project as such a project is not nearly
as detrimental to the environment as a diluted bitumen export project.

Northwest Coast Energy News is attempting to contact Enbridge Northern Gateway for comment on the Haisla filing. Response may be delayed by the Canada Day holiday.

 

Haisla Nation Response to NGP Information Request  (pdf)

Fishing report site calls on anglers to boycott towns, including Kitimat, that don’t stand against Enbridge

The Pacific Northwest Fishing Reports website is calling on anglers to boycott all communities, including Kitimat that haven’t taken an official stand opposing the Enbridge Northern Gateway pipeline.

The site run by someone called “Old Jake” covers DFO Region 6 and Region 7a “in an effort to give sport fishing enthusiasts more options when it comes to our wonderful sport.”

Its about page says:

What makes this website unique is that it is not run by professional fishing guides or anyone who profits directly from fishing, we are local sports fishing enthusiasts here simply because we love the sport. Why is this important to you? Because we don’t have to make a sale on our fishing reports.

The boycott notice was first posted by “Old Jake” on March 31, but only came to wider attention in the past weekend when the link was widely circulated among the angling and guiding community  and by environmentalists on social media in northwest BC, some of it in reaction to the oil spill in Sundre, Alberta.

In the post, “Old Jake” says in the introduction:

[T]he deck is really stacked against our pristine lakes and rivers.

Support our boycott on all business in communities which are not willing to protect our environment in hopes of getting a financial handout from Enbridge. Let us send a clear message to communities who don’t respect our environment enough to protect it.

Please do not boycott small fishing businesses that reside outside of any community boundary, because they are as much a victim of those who support oil for greed.

The letter says, in part:

Greetings fellow sport fishing enthusiasts, I am writing this to all of you, all over the world because we desperately need your help on two major fronts, both could permanently extinguish fishing as we know it for our generation and that of our children’s and possibly much longer.

The first and foremost problem is the Enbridge Northern Gateway Project which the Prime Minister of Canada appears to be declaring a project that will go ahead regardless of the National Energy Board Hearings.

The second is Fish Farming, and its unregulated ability to hide scientific facts, its attacks on free speech and attempts to silence those who dare to speak out against them.

First Nations have done their part, they stood up and spoke, all against Enbridge and Alberta’s need to cash in on the horrific oil sands that are killing the Athabasca River, and sending this toxic mess into the Arctic Ocean….

Here is where we have a problem, the cities, towns and villages appear to want it both ways, they want your tourist dollar, and they also any dirty Oil Dollar they can get as well.

We need you; the people of the world to write to the majors of each community and ask them why tourists could come to a community that won’t protect its natural resources. Why should tourists come and spend their money if the leaders of these communities don’t take a stand in protecting our lakes and rivers from the worst threat ever in the history of British Columbia.

Ask these majors (sic probably means mayors) how many people will come to visit if we end up with a mess like they did on the Kalamazoo River.

 

Here is the list, where the author equates opposing Enbridge with supporting the environment

Prince Rupert – Supports our Environment (Visit this great community)
Terrace – Supports our Environment (Visit this great community)
Kitimat – Does not support our environment. (Boycott)
Kitwanga – Supports our Environment (Visit this great community)
Hazelton – Does not support our environment. (Boycott)
Kispiox – Supports our Environment (Visit this great community)
Moricetown – Supports our Environment (Visit this great community)
Smithers – Supports our Environment (Visit this great community)
Telkwa – Does not support our environment. (Boycott)
Houston – Does not support our environment. (Boycott)
Granisle – Does not support our environment. (Boycott)
Burns Lake – Does not support our environment. (Boycott)
Fraser Lake – Does not support our environment. (Boycott)
Vanderhoof – Does not support our environment. (Boycott)
Prince George – Does not support our environment. (Boycott)

Editorial: It’s time for the District of Kitimat to play hardball on Gateway

EDITORIAL

Who speaks for Kitimat?

Someone has to speak for Kitimat on the Northern Gateway project.

The District of Kitimat Council no longer has a choice. It’s time to play hardball with Ottawa and Enbridge on the Northern Gateway Pipeline.

You can’t negotiate from a position of weakness.

The game of pipelines changed forever in recent weeks, when the Conservative government introduced Bill C-38, the Budget Implementation Act.

Bill C-38, which passed Second Reading on May 14, 2012 is an affront to basic democratic principles, a 425 page omnibus monster that will not permit the kind of careful consideration of major changes in Canadian society that what was once normal in a free and democratic society. The omnibus bill not only concerns the federal budget but also repeals the environmental assessment process and guts fisheries protection for the smaller spawning streams where salmon are born. By giving the federal cabinet the power to overrule the National Energy Board, the decision on the pipeline rests with just one man, Prime Minister Stephen Harper, who has made no secret that he intends to push the project through no matter how fierce the opposition to the project.

This week has seen devastating cutbacks along the west coast, to environmental monitoring and pollution control, to Coast Guard protection.  It is now clear that protection of the environment  along the BC coast and the lives of the mariners who sail those waters are of little importance to Ottawa, and of no importance to the war room types counting votes in Alberta and suburban ridings outside Toronto and Vancouver.

The District of Kitimat Council has voted to wait to make a decision until after the report of the Joint Review Panel, when “all information” is available.

The news this week that the Joint Review Panel decided to bypass Kitimat, that the town that is to be the terminal of the proposed pipeline is irrelevant to the process, shows more than any other move what the JRP thinks of Kitimat. Not much.

The Joint Review Panel has lost all credibility. Even if the JRP does produce a fair and honest report with valid recommendations for conditions and restrictions, it is highly unlikely that those recommendations will be fully implemented, because the final decision will be made in the Prime Minster’s Office and that decision will be build, baby, build.

Media reports in recent months have shown that Enbridge has easy access to the senior levels of the Conservative government and Enbridge lobbying preceded the changes to the Fisheries Act in Bill C-38.  Enbridge  walks the halls of power in Ottawa. Kitimat, on the other hand, counts for little, as the JRP schedule clearly shows.

So, for example, even if the Joint Review Panel recommends strict conditions on the pipeline to insure the safety of Kitimat’s water supply, and if Enbridge doesn’t like those conditions, there is no guarantee that Harper and the cabinet will implement those recommendations. That would leave the District of Kitimat holding the water barrel for several years.

(One of the many reasons, it seems, that the JRP wants to have all the northwest hearings is in Prince Rupert is so the high-priced energy lawyers from Calgary can have comfortable accommodation. So, if any protests from the District and the Haisla Nation are successful and there actually are final hearings in Kitimat,  perhaps the District could arrange for the lawyers to camp in Radley Park, so they can actually grasp the realities of living in Kitimat by the Kitimat River.)

The District of Kitimat Council has a duty to make sure that this region is protected.

So what does this mean?

“Armed neutrality”

It is now too late for the District Council to take a position for or against the pipeline. It no longer matters whether Mayor and Councillors support the pipeline, are sitting on the fence or oppose the pipeline. Bill C-38 has made the decision for the Council.

Council must assume that Stephen Harper will impose the pipeline on Kitimat and will impose conditions that could be determinable to the District in favour of Alberta and Enbridge.

From now on Council must unify and work to protect the District from Stephen Harper. The Council must make sure that the District is an aggressive force at any negotiating table or court battle.

That means Council should retain its position of neutrality, leaving opposition to the pipeline to others like Douglas Channel Watch. Given the growing witch hunt against the environmental movement, an official position of neutrality is negotiating from a position of strength and protects the District from any accusation that “radicals” are distorting the District’s position.

In international affairs, countries like Switzerland and Sweden are neutral, robustly neutral. Both Switzerland and Sweden practice what is called “armed neutrality.”

“Armed neutrality” means that Kitimat Council can no longer continue its current wishy-washy neutrality, arguing over the nuances of words in letters to the Joint Review Panel and Enbridge. To protect Kitimat, Council must adopt its own policy of “armed neutrality,” an aggressive stance that represents the entire community, both opponents and supporters of the pipeline.

So what now?

Professional advice

The announcement this week that Shell is planning to build a liquified natural gas facility in Kitimat, in combination with the KMLNG and BC LNG projects plus Enbridge, means it is vital for the District to have independent, professional advice on energy issues.

The District must immediately start paying much closer attention to the all the relevant documents that are filed with the Joint Review Panel. The District Council and staff must have their own independent advisers rather than juggling the views of Douglas Channel Watch and Enbridge and hoping for the best. That means hiring more professionals to supplement current staff that will understand the technicalities of both the Enbridge pipeline and the LNG projects; staff who can advise the senior administration and Council about how to proceed where the issues of the pipeline construction, terminal construction and management of the terminal come under municipal jurisdiction or could adversely affect the municipality.

That takes money, even though money is tight, Council must budget for that staff. When it comes to negotiating factors within the responsibility of the municipality, Kitimat must be at the table at full strength.

All the way to the Supreme Court

It is now certain that after Stephen Harper orders the pipeline to go ahead, disputes over the Northern Gateway Pipeline will end up in the courts. Lawyers are already talking about the constitutional necessity to consult First Nations, that pushing the pipeline across aboriginal traditional territory will violate Rights and Title.

First Nations across British Columbia are already represented by some of the best lawyers in Canada.

Vancouver is already looking at what powers a municipality has to make sure that city is fully protected in case of a catastrophic tanker accident from the Kinder Morgan pipeline and project.

Yes, the District is wary because of the long and bitter fight over power allocation, but that is in the past. Again Bill C-38 gives the District no choice but to prepare for new legal battles, probably all the way to the Supreme Court of Canada.

The District of Kitimat must immediately budget for, seek out, retain and instruct a law firm that  can advise the District on its rights and responsibilities now and in the future once the Harper government imposes the pipeline on Kitimat. As we have seen from the Joint Review and other National Energy Board hearings, the energy industry hires the best lawyers money can buy.

If Kitimat has to face those lawyers, the District can’t act like a Junior B team facing the NHL All-Stars. That law firm should be able to advise Kitimat on the constitutional issues involved and what powers a municipality has to protect the community from unwanted and unwarranted aspects of pipeline and tanker development. That law firm must also be able to participate in hardball business negotiations.

Seeking Alliances

The District must build better bridges with the Haisla Nation and find where there is common ground in the Kitimat region as Stephen Harper imposes the pipeline on the northwest. They may be arguments before the courts or with Enbridge where both the Haisla and the District of Kitimat are allies in a fight.

Stephen Harper and his government are prepared to impose the pipeline, terminals and tanker traffic on northwestern British Columbia, again no matter what local municipalities and regions say. All the environmental and Coast Guard safeguards that might have brought acceptance of the Enbridge project are being cut to the bone. That means Kitimat must also forge alliances with those municipalities and regions, again to make sure that local rights and responsibilities are fully protected once the government decides to impose the pipeline on the northwest.

It is highly likely that the constitutional consultation and Rights and Title cases on the pipeline will end up at the Supreme Court of Canada. If there are other cases, perhaps raised by Vancouver or other Lower Mainland or northern communities or even the Province of British Columbia, it may be that the Supreme Court, as it has with some cases in the past, could consolidate all the pipeline cases into one. That means Kitimat will need to be a participant in any case on the pipeline before the Supreme Court.

Unless District of Kitimat Council starts playing hardball, Stephen Harper will drive a bulldozer down bank of the Kitimat River to Douglas Channel, ignoring the council standing and watching from the hill looking over the pipeline trench. 

Scientists identify major Japanese-style tsunami hazard for west coast

American scientists studying the aftermath of the March 11, 2011, Tohoku, Japan earthquake and the resulting devastating tsunami say that a similar tsunami could be generated by an earthquake in the Aleutian Islands of Alaska.

The 9.0 magnitude Tohoku earthquake created a tsunami that was a high as 10-metres. The events killed about 18,000 people. Debris from the tsunami is now appearing on the west coast of North America.

The study, published May 8, in EOS, the Transactions of the American Geophysical Society, says:

A tsunami triggered by an earthquake along the AASZ [Alaskan-Aleutian Subduction Zone] would cross the Pacific Ocean and cause extensive damage along highly populated U.S. coasts, with ports being particularly vulnerable.

A subduction zone is where one tectonic plate, in this case, the Pacific plate, is forced down under another plate, the Alaskan continental arc.

Data from the Tohoku earthquake suggests that portions of the Alaskan-Aleutian Subduction Zone could be just as hazardous.

The study, by Holly Ryan, of the Pacific Coastal and Marine Science Center of the US Geological Survey in Menlo Park, Ca. and colleagues says the Japanese earthquake surprised scientists because the magnitude of both the earthquake and the tsunami were much larger than expected for the Tohoku region off northeastern Japan. The scientists say the region was originally considered low risk because the deep water section of the tectonic plate boundary that ruptured had been aseismic [a fault where there are no records of earthquakes] prior to the March 2011 event and was thought to be too weak to accumulate the strain to trigger a major earthquake.

In Japan and the Aleutians, there are seldom records of earthquakes where the upper tectonic plate is made up of weak, water-laden trench sediment accreted [stuck or locked] to the margin along thrust faults. The accreted sediment is not strong enough to fail in an earthquake (stick-slip behaviour) but, rather usually deforms without causing an earthquake.

Now research from the Japan shows that deep water section of the Tohoku region was fully
locked (accumulating strain at the convergence rate). The continental basement rock lies within
20 kilometres of the trench in deep water above the boundary at Tohoku. That created major accumulation of strain on the fault.

So when the earthquake occurred, there were large amounts of slip on the Tohoku megathrust, as well as corresponding movement on a deep water branch fault. Both contributed to the displacement of large volumes of water, creating the giant Japanese tsunami that smashed into the coast.

The Alaskan-Aleutian Subduction Zone is similar to the Tohoku region. The AASZ begins at a deep trench where the Pacific plate under thrusts the Alaskan continental arc and the Aleutian Islands oceanic arc.

Part of that subduction zone triggered the March 27, 1964 Good Friday magnitude 9.2 Anchorage, Alaska, megathrust earthquake. It was the largest quake ever recorded in North America and the second largest worldwide since seismic events were recorded. The epicentre was about 20 kilometres north of Prince William Sound, where a fault ruptured 25 kilometres below the surface. That quake causing major damage in Anchorage, 125 kilometres to the west and in Valdez 64 kilometres to the east. The megathursts along the ocean floor shifts created large tsunamis as high as 67 metres that struck along the North American coast from Alaska to California.

In Anchorage, nine people were killed by the quake, much of the downtown was destroyed and one neighbourhood lost 75 homes in a massive landslide. Two villages near Anchorage were destroyed when the land sank.

According to Wikipedia, the damage to British Columbia alone was estimated at $10 million in 1964 dollars (about $75 million in 2012 dollars according to the Bank of Canada inflation calculator) The Anchorage quake actually shook Kitimat and caused minor damage in the town. Due to factors such as the location of the quake at Prince William Sound , the tides and other factors along Douglas Channel, the tsunami coming into Kitimat was just a few centimetres high. Across the northwest and down the coast, there was more damage, the tsunami that hit Prince Rupert was 1.4 metres. Again to the configuration of the coast, tides and other factors, Port Alberni on Vancouver Island was hit twice, washing away 55 homes and damaging 375 others.

In California, 12 people were killed at Crescent City. There was damage in Los Angeles and as far off as Hawaii.

The study says that an Anchorage type event occurs every 900 years, so that area appears to be out of immediate danger,

According to the study, there was a magnitude 8.6 earthquake near Uninmak Pass in the same region in 1946 that triggered a tsunami that caused damage along the west coast, killed 150 people in Hawaii and inundated shorelines on South Pacific Islands and as far away as Antarctica. Another earthquake near the Andreanof Islands in 1957 also triggered a dangerous tsunami.

The new danger zone could be at the Semidi Islands, southwest of the better known Kodiak Island, where a 400 kilometre-long section of the subduction zone ruptured in 1938, causing a 8.2 magnitude earthquake. In the 1938 earthquake, the study says, that quake was beneath relatively shallow water, so it generated only a modest tsunami.

The Semidi Islands area is now fully locked, the study says, and enough strain has built up to trigger a similar event.

In 1788, a major earthquake in the Semidi Islands was recorded by Russian settlers. It is that area that the study says could trigger a Tohoku type tsunami. The segment of the trench in deeper water has not had a rupture since 1788. Satellite observations show that strain along the fault is accumulating “at a high rate.” The trench is four to five kilometres deep, just like at Tohoku, so displacement of the ocean water could trigger a similar giant tsunami.

Potential rupture of the near-trench section of the plate boundary is worrisome in that similar to the plate boundary near Tohoku, it is composed of rigid basement rock that extends beneath the margin to water depths of four to five kilometres. The presence of rigid basement rock close to the trench allows for an earthquake source beneath deep water, which would significantly amplify the height of the resultant tsunami. In addition, the possible additional rupture of an as yet undiscovered splay or branch fault, similar to circumstances during the Tohoku earthquake, would further increase the tsunami height.

The authors of the study call for more studies to compare the Aleutian area with the Tohoku region of Japan. Scientists are now working on “Paleotsunami studies” so there is a a history of tsunamis generated in the Aleutians that can be correlated to specific earthquakes.

Most of the attention on the west coast of North America has been centred on the Cascadia fault from northern California to southern British Columbia, which could also trigger a major earthquake and tsunami. It is time that scientists, emergency planners and government paid more attention to Alaska.

Link to Study Tsunami Hazards to U.S.  Coasts form Giant Earthquakes in Alaska  (pdf)

 


View Larger Map

What about the Northern Gateway?

My family was just sitting down for dinner in Kitimat on that Good Friday evening in 1964 when the whole house began to shake. The quake in Anchorage lasted for four minutes, the shock that hit Kitimat was probably less than a minute.

After dinner, tuning to the local TV station, CFTK, the Friday night broadcasts was interrupted by a news special, an extraordinary even for a small station, which in those days had no microwave communications with the rest of the television universe, with the local anchor telling the story based on wire service and other reports that were already trickling in, giving the people of the Kitimat-Terrace-Prince Rupert region the news of the devastation in Alaska.

Fast forward 48 years and the big question on the northwest coast is the Enbridge Northern Gateway pipeline and whether or not the pipeline and the terminals in Kitimat harbour are vulnerable to earthquake and tsunami.

In public presentations in Kitimat, Enbridge officials have always minimized the potential danger to the Northern Gateway from earthquake and tsunami. In its latest presentation, to District of Kitimat Council on April 16, 2012, Enbridge engineer Drum Cavers told council that “all of the major earthquakes have occurred well off shore on the Queen Charlotte Fault,” and that “seismic activity is low relative to south coastal BC.” Cavers also said “the Kitsumcalum-Kitimat Valley is not the site of unusual seismic events or faults.” The presentation points to an 1973 quake in the Skeena River valley that Enbridge says was small and the planned pipeline is within “seismic design parameters.”

Cavers’ presentation said “No fault breaks to surface are known near the pipeline route, but if one should be found during further work, there are methods to mitigate fault motion if required.”

There has been no mention by Enbridge Northern Gateway of the potential problems that could be caused to the Kitimat pipeline and the terminal by a major earthquake or tsunami from the Alaska Aleutian region.

I was out of town during Cavers’ presentation but I have asked questions about the 1964 quake and potential problems from Alaska at three public meetings, including a direct question to Northern Gateway president John Carruthers at the September, 2011, public forum at Kitimat’s Mount Elizabeth Theatre. Despite promises, Enbridge has so far not responded to my questions.

Enbridge to spend $1.6 billion to upgrade Michigan pipeline, old line will be “abandoned in place”

Enbridge announced Thursday, May 10, 2012, it plans to spend $1.6 billion to upgrade and replace its pipeline through Michigan and Indiana, including the site of the leak in to the Kalamazoo River in July 2010. What Enbridge calls the “6B pipeline” broke open near Marshall, Michigan and spilled more than 840,000 gallons of bitumen sands oil into Talmadge Creek and the Kalamazoo River.

That doesn’t mean, however, that the broken and now disused pipeline will be demolished. Enbridge says that pipeline will be “abandoned in place,” meaning it will be deactivated, purged of any remaining oil and then filled with an “inert gas,” a move that is permitted under United States pipeline safety regulations.

In a fact sheet, Enbridge says it plans to replace approximately 75 miles of its 30-inch diameter “Line 6B pipeline.” The 75 miles to be replaced with new pipe consists of about 10 miles in Indiana and 65 in Michigan, with replacement pipe to be either 30 or 36-inch diameter pipe in Indiana and southwestern Michigan and 30-inch pipe in the eastern Michigan segment.

Enbridge map of pipeline 6B
A map, released by Enbridge, showing its plans for upgrading and replacing the 6B pipeline in Michigan and Indiana.

Enbridge says the new pipeline will closely follow the route of the old one.

Completion of this project, scheduled for late 2012, should result in fewer integrity digs and repairs along the replacement segments in the future, resulting in fewer disturbances to landowners and local communities.

For this project, we plan to remove the oil from the pipe segments being replaced and fill them with nitrogen before abandoning in place, as prescribed in regulations. In most cases, the new pipe segments will be installed adjacent to those segments being replaced.

Enbride says the “The Line 6B Maintenance and Rehabilitation Project” is part of the company’s “pipeline integrity maintenance program” that includes:

  • Using high-quality steel and anti-corrosion coatings when constructing our pipelines.
  • Installing cathodic protection (a low-level electrical charge) to inhibit corrosion of underground pipelines. Pressure testing of new and existing pipelines with
    water.
  • Periodically inspecting the inside of the pipeline with sophisticated tools called “smart pigs” to locate
  • pipe abnormalities so they can be corrected.
  • Conducting preventive maintenance programs.
  • Continually monitoring pipeline operations from Enbridge’s control center, which has remote shut-down capabilities and can monitor pressures and conditions when the pipeline is flowing.
  • Completing regular ground and aerial inspections of the right-of-way.
  • Providing public awareness safety information to emergency responders, local public officials, excavators and those who live and work along our pipelines.

Enbridge says the aim of the project is to restore the capacity of the pipeline to meet increasing
demand driven by current and planned refinery upgrades and expansions in Michigan, Ohio
and eastern Canada.

Enbridge plans to complete the Indiana segment of the replacement pipeline by 2012. As for the Michigan pipeline, the company says four segments will be completed in 2012 and the last 160 miles will be completed in late 2012 or early 2013.

All of Enbridge’s plans are subject to U.S. Federal and state approvals.

As for the spill in the Kalamazoo River, the Kalamazoo Gazette, in covering the Enbridge announcement reported today

Although one section of small section of the Kalamazoo River that had been closed following the Enbridge spill in 2010 reopened last month – just three of the 40 miles affected – environmental officials have said significant amounts of oil still remain submerged in the river bed, although they say it is not dangerous to human health. State and federal agencies are slated to open more parts of the river in coming months pending investigation.

 

Related Links:
WOOD-TV Enbridge plans new $1.6 bil pipeline Oil pipeline will not be demolished

NPR Michigan Radio Enbridge wants to replace 200 miles of aging pipeline in Michigan

Documents 

Enbridge Handout Line 6B Phase 2  (pdf)

Enbridge Handout Line 6B Replacement Project  (pdf)

A map released by Enbridge showing its central Canada and US pipelines