Fishing report site calls on anglers to boycott towns, including Kitimat, that don’t stand against Enbridge

The Pacific Northwest Fishing Reports website is calling on anglers to boycott all communities, including Kitimat that haven’t taken an official stand opposing the Enbridge Northern Gateway pipeline.

The site run by someone called “Old Jake” covers DFO Region 6 and Region 7a “in an effort to give sport fishing enthusiasts more options when it comes to our wonderful sport.”

Its about page says:

What makes this website unique is that it is not run by professional fishing guides or anyone who profits directly from fishing, we are local sports fishing enthusiasts here simply because we love the sport. Why is this important to you? Because we don’t have to make a sale on our fishing reports.

The boycott notice was first posted by “Old Jake” on March 31, but only came to wider attention in the past weekend when the link was widely circulated among the angling and guiding community  and by environmentalists on social media in northwest BC, some of it in reaction to the oil spill in Sundre, Alberta.

In the post, “Old Jake” says in the introduction:

[T]he deck is really stacked against our pristine lakes and rivers.

Support our boycott on all business in communities which are not willing to protect our environment in hopes of getting a financial handout from Enbridge. Let us send a clear message to communities who don’t respect our environment enough to protect it.

Please do not boycott small fishing businesses that reside outside of any community boundary, because they are as much a victim of those who support oil for greed.

The letter says, in part:

Greetings fellow sport fishing enthusiasts, I am writing this to all of you, all over the world because we desperately need your help on two major fronts, both could permanently extinguish fishing as we know it for our generation and that of our children’s and possibly much longer.

The first and foremost problem is the Enbridge Northern Gateway Project which the Prime Minister of Canada appears to be declaring a project that will go ahead regardless of the National Energy Board Hearings.

The second is Fish Farming, and its unregulated ability to hide scientific facts, its attacks on free speech and attempts to silence those who dare to speak out against them.

First Nations have done their part, they stood up and spoke, all against Enbridge and Alberta’s need to cash in on the horrific oil sands that are killing the Athabasca River, and sending this toxic mess into the Arctic Ocean….

Here is where we have a problem, the cities, towns and villages appear to want it both ways, they want your tourist dollar, and they also any dirty Oil Dollar they can get as well.

We need you; the people of the world to write to the majors of each community and ask them why tourists could come to a community that won’t protect its natural resources. Why should tourists come and spend their money if the leaders of these communities don’t take a stand in protecting our lakes and rivers from the worst threat ever in the history of British Columbia.

Ask these majors (sic probably means mayors) how many people will come to visit if we end up with a mess like they did on the Kalamazoo River.

 

Here is the list, where the author equates opposing Enbridge with supporting the environment

Prince Rupert – Supports our Environment (Visit this great community)
Terrace – Supports our Environment (Visit this great community)
Kitimat – Does not support our environment. (Boycott)
Kitwanga – Supports our Environment (Visit this great community)
Hazelton – Does not support our environment. (Boycott)
Kispiox – Supports our Environment (Visit this great community)
Moricetown – Supports our Environment (Visit this great community)
Smithers – Supports our Environment (Visit this great community)
Telkwa – Does not support our environment. (Boycott)
Houston – Does not support our environment. (Boycott)
Granisle – Does not support our environment. (Boycott)
Burns Lake – Does not support our environment. (Boycott)
Fraser Lake – Does not support our environment. (Boycott)
Vanderhoof – Does not support our environment. (Boycott)
Prince George – Does not support our environment. (Boycott)

Editorial: Harper wants to cut off funding for JRP intervenors. Conservatives allow hate speech, while curbing green speech.

The Conservative Party of Canada are sickening hypocrites on free speech.

Hate speech is OK. Green speech is not.

Hate speech is permitted, for it is “free speech.”  “Green speech,” on the other hand, is under constant attack from the Conservatives and their followers. While not subject to legal curbs (for now), we are seeing increasing pressure on those who advocate for the environment to shut up.

The Conservatives  today repealed sections of the human rights act concerning “hate speech” delivered by telephone and the Internet.  There was a free vote,  the Conservative MPs supported the repeal by 153 to 136.  It was a private members bill from Alberta Conservative MP Brian Storseth that repealed Section 13 of the human rights code, which covered with complaints regarding “the communication of hate messages by telephone or on the Internet.”

On the same day, in SunMedia, that Prime Minister Stephen Harper says his government will no longer fund any organization that comes before the Northern Gateway Joint Review opposing the pipeline.

According to Sunmedia story Taxpayer Funding Oil-Sands Activitists

The taxpayer tap pouring cash into the coffers of oilsands opponents could be turned off.

“If it’s the case that we’re spending on organizations that are doing things contrary to government policy, I think that is an inappropriate use of taxpayer money and we will look to eliminate it,” said Prime Minister Stephen Harper in Paris on Thursday.

Harper was responding to reports by Sun News Network that the Canadian Environmental Assessment Agency has showered more than $435,000 on groups participating in the review of the Northern Gateway pipeline proposal, that would connect Alberta’s oilsands to a tanker port in northern B.C.

So there we have it, a prime minister who heads a government elected by just 30 per cent of the Canadian electorate, who now decides who can afford to come before a public quasi-judicial body, the Northern Gateway Joint Review Panel. Support the government and the bitumen sands, fine, we’ll give you taxpayers’ dollars, even if you don’t need it. Oppose the government, and you do  it on your own dime.

Transnational energy companies have millions to spend to support their views on the oils sands, whether before the JRP or in a multi-million PR campaign. A poor community that could be devastated by an oil spill off the BC Coast doesn’t count.

In the age of the web, Facebook, Twitter and other social media, all speech is hard to control, as despotic governments around the world are finding.   Hate speech on the Internet is impossible to control.  All someone has to do is  have a server in a country like the United States, where the First Amendment permits it. Green speech will continue to be free on the Internet. The difference is that Conservatives are making every effort to make green speech ineffective in the political and public spheres in Canada.

The change in the Canadian hate law means little in a practical sense. So why did the Conservatives change the law?  Like their efforts to crush “green speech,”  repealing those hate speech clauses has absolutely nothing to do with free speech. The repeal is all about ideological control, the very opposite of free speech.

Behind this vote is the fact that conservatives have made it clear over the years that they despise human rights codes. Today’s act of repeal is nothing more than part the Conservatives  wide-ranging plan to incrementally, millimetre by millimetre, (probably through other private member’s bills) to dismantle all the progress that has been made in this country over the past 70 years.

The right wing media loves to promote the far out wacko cases of people who use the human rights law process, stories the right-wing repeats again and again. There have been wackos who use other legal procedures, including the civil courts and other judicial and quasi-judicial bodies. But the conservatives and their media allies only emphasize the wacko cases before a human rights tribunal.

Of course, the majority of comfortable (and most of whom are, as far as we know, white, male and straight) conservatives are never going to have to use a human rights tribunal to redress a grievance.  They were never beaten up on the school yard, never denied a job or housing.  Most of the people who go before human rights tribunals are on the margins of society.

At the same time, we see the ongoing campaign by conservatives to demonize “green speech,” speaking out for the environment. Conservatives, in politics and the media, are trying to curb the funding of foundations that support the environment, the government routinely calls environmentalists “radicals” and even “terrorists.” Now we have Harper saying, yet again, don’t you dare oppose government policy on the bitumen sands.

The right-wing media routinely heaps their scorn and yes, even hatred, for those who believe that life on this planet is threatened. Those right wing columnists will, of course, fight to death to protect their own free speech but most won’t even put in a single sentence of objection in their columns or reports about the conservative campaign against “green speech.”

Which brings us to the man, who while claiming to be a free speech advocate, is actually now the self-appointed head of Canada’s thought police, Ezra Levant of Ethical Oil. (Ethical Oil today triumphantly tweeted Harper’s statement  @EthicalOil Taxpayers funding anti-oilsands activists #EthicalOil #Cdnpoli… fb.me/V1AS7Tg2 )

Writing in the National Post, Jonathan Kay is full of praise for Levant:

a vigorous network of right-wing bloggers, led by Ezra Levant, began publicizing the worst abuses of human-rights mandarins…. In absolute numbers, the readership of their blogs was small at first. But their existence had the critical function of building up a sense of civil society among anti-speech-code activists, who gradually pulled the mainstream media along with them. In this sense, Mr. Levant deserves to be recognized as one of the most influential activists in modern Canadian history.

Influential activist, yes.  Free speech advocate? No. It is time the media stopped calling Levant a champion of free speech. He is not. Levant is a champion of causes he himself approves of,  especially the bitumen sands.  Free speech for anyone who opposes his agenda is subject at very least to attack and ridicule.

In his columns,  Levant advocated the curbing of the free speech of the thousands of  people of British Columbia who are defending their back yard from the energy industry. Levant is, of course, free to disagree with them, but don’t you dare oppose Ezra Levant or the bitumen sands,

Levant, rather than calling for more free speech in his columns, as his personal PR spin maintains,  advocated cutting off the people who live here in northwestern  British Columbia from the hearings of the Northern Gateway Joint Review panel, by saying too many people had signed up to testify.

Writing in SunMedia on December 10, 2011, Levant let off a broadside at the thousands of ordinary Canadians living and working along the route of the Northern Gateway pipeline who signed up to comment on the project, calling on Stephen Harper to fire chair Sheila Leggett for permitting too many people to speak at the hearings

[A]s of Friday, 4,453 people had typed in their names into Leggett’s website, signing up for the right to make a presentation.

[The JRP] allows anyone in the world — literally any person, any child, any foreign citizen — to simply type their name and address and get the right to testify before her panel.

It’s as trivial as clicking “like” on a Facebook page. That’s why Leggett needs another year. If another 40,000 people click on her website, will she delay things 10 years?

Skimming through the names is like reading petitions where wiseacres sign up as “I. P. Freely” or “John A. Macdonald.” Much of it is just junk, to jam up the system.

The website allows people to write a comment. Many of them are word-for-word replicas of each other. It’s a form letter campaign, arranged by professional environmental lobbyists. And it’s working. The only question is whether Leggett is naive, incompetent or biased against the pipeline.

Some of the forms have been faxed in. They helpfully have the fax signature stamp at the top of the page, showing which foreign-funded lobby group is working to gin up names. Like the Sierra Club, which received a $909,000 contract from the U.S. Tides Foundation and their Canadian affiliate to gin up opposition to the “tar sands.”

Those foreign billionaires are getting their money’s worth — they’ve managed to delay the hearings by a year before they’ve even started.

Levant was giving a completely inaccurate account of the Joint Review process. His column which echoes the ideological blindness of most his conservative columnist colleagues, speaks of foreign influence, repeating the big lie being propagated by the Conservative party,  started largely by blogger Vivian Krause, that there is an International California Conspiracy to undermine the Canadian energy industry.

Dealing with a pipeline coming through some of the most geologically unstable country on the planet is not “trivial.”  The threat of a major oil spill on the British Columbia coast is not “trivial.”

I’ve attended, listened to the remote webcast or read the transcripts of much of the hearings. None–none– of the testimony can remotely be considered: “Much of it is just junk, to jam up the system.”

A fair estimate would say that 95 per cent of people who registered to comment live along the pipeline route or the BC coast. At least a dozen or more letters of comment are posted on the JRP site every day, which means thousands since Levant wrote the diatribe,  and it is clear that they are written by individuals with valid concerns, and none in recent months are form letters. (I check them, I doubt if Levant does)

In that column, Levant goes on about JRP chair Sheila Leggett:

She’s Stephen Harper’s bureaucrat, but she’s taking direction from foreign meddlers. For “whatever time it takes.”

What a fool. No court would permit such a gong show. And Leggett has court-like powers.

Last month, when Barack Obama delayed the Keystone XL pipeline from the oilsands to the U.S., Harper was appalled.

But Leggett was appointed by Harper. And she just pulled an Obama on our own country.

Leggett must be fired. Her job is not to listen to everyone in the world with an Internet connection. It’s to make the best decision in Canada’s interest.

Her Oprah-style hearings are unacceptable, and Harper should make that clear by sacking her.

Leggett was not fired. In fact, over the past six months, she has had a difficult time confining testimony to the narrow rules of evidence that do not permit someone to actually say they oppose the pipeline.  An intervenor had to testify “from personal knowledge” or if First Nations “from traditional knowledge.” So no hearings came close to being “a gong show.”

There hasn’t been a single “foreign meddler” testify in the past six months (although some intervenors, including the energy companies themselves, use experts from outside Canada).

In a later column, on January 7, 2012, the weekend before the hearings began here in Kitimat, Levant again toed the conservative party line in Pipeline review hearings allowing foreign input is ridiculous — we don’t need another country’s permission. It’s all Canada, Levant again repeated his big lie.

Those who testified at the Kitamaat Village hearings in the following days were from the Haisla Nation as well as Douglas Channel Watch and the Kitimat Valley Naturalists (both groups consist of mainly retired Kitimat residents).  There wasn’t a foreign billionaire in sight. Same with the hearings in the days and weeks that followed, First Nations, fishers, hunters, guides, birders, and yes environmental groups. (How dare those BC NIMBYs get in the way of an Alberta pipeline and its manifest destiny?)

In today’s SunMedia article, Environment Canada cautioned:

A spokesman for Environment Minister Peter Kent tells QMI Agency while that funding is often legally required, Kent wants to make sure “common sense prevails” in how it’s awarded.

With its majority, it is likely the Conservatives will change the rules, just as they are by abolishing DFO fisheries protection for salmon spawning streams. Again bottom line, if you support the government and you are rich, you can testify.  If you are poor, even if you are “directly affected,” tough luck.

The sad fact is that Levant has won, for now, his fight against free speech in BC, probably without knowing it.

More and more people are dropping out of the Joint Review Panel process, hearings scheduled for days now last just a day or an afternoon. That’s because given the position of Stephen Harper, Joe Oliver and Peter Kent, that the pipeline is going ahead no matter what, many of these people  who signed up to comment now see no reason to testify for 10 minutes on a subject that is a foregone conclusion. Here in the northwest, where long distance travel is concerned, it takes time and money to make the effort of participate. Why testify, if the government is going to ignore the concerns of the people who live here?

No wonder Ethical Oil sent out the celebratory tweet this afternoon.

The Conservatives have won a major in battle in their war on free speech in this country by making it not worth their while for many ordinary citizens, those who don’t have deep pockets for research and lawyers, to speak on the Northern Gateway Pipeline, at least before the Joint Review Panel. Now Harper government wants to cut off funds for the poorer intervenors.  If that happens, more opponents will drop out of the proceedings.

Kay, in his attack on the hate law calls it a  “system of administrative law that potentially made de facto criminals out of anyone with politically incorrect views about women, gays, or racial and religious minority groups.”

The National Post’s conservative friends (in its own newsroom and both in and out of Parliament)  are now looking for ways to make “defacto criminals out of anyone with the politically incorrect” view that the Northern Gateway Pipeline is not a new version of the “national dream.” After all,  Stephen Harper’s statement today means “that doing things contrary to government policy” is now politically incorrect.

Of course, if the pipeline breaches along the Kitimat River and the town is without a drinking water system for up to four years (in the worst case scenario), it will be Kitimat’s nightmare, not Canada’s. (In Don Mills, columnists will still be able to drink Toronto’s water or, perhaps, run to the corner store for a Perrier.)  If a bitumen tanker hits the rocky coast and sinks in the deep  cold-water fjords, it will largely be BC’s nightmare, and the BC taxpayers’ nightmare, not Edmonton’s or Toronto’s. If a pipeline buried under nine metres of west coast snow in a remote valley has a small–undetectable by computer– breach  in the darkest days of January and  the ongoing oil leak isn’t discovered for weeks or months, by that time it might also be “politically incorrect” for anyone Canada to object. (Of course, people in the region will object and strongly).

The fact is that these small c and large C conservative campaigns  against hate laws in terms of “free speech” are nothing more than the rankest hypocrisy. What most (not all) conservatives want is free speech for their ideas and only those ideas, especially if they want to shout their own hatred of certain groups from the rooftops or on the world wide web, while at the same time, many conservatives have been trying to shut down anyone with opposing views.

To a conservative, the freedom of speech and the freedom of religion that still drives too many numbers of gay teenagers to suicide, is always protected free speech, no matter the body count.

On the hand, to the same conservatives, free speech in Canada doesn’t include protecting the environment of the only planet we live on, especially if a small portion of the funding that speech comes from California. In conservative Canada, free speech belongs to American (that is foreign) oil billionaires like the Koch brothers. To conservatives, free speech does not apply to local BC groups, coalitions of often left-wing environmentalists and  often conservative anglers and hunters, trying to protect wild salmon.

Where’s George Orwell when we need him? In the Canada of Stephen Harper, the National Post and Sunmedia,  homophobic hatred is protected, preserving the planet is not protected.  In Canada in 2012 (or I should I say 1984+), the only acceptable political speech is support for the bitumen sands and the pipeline projects.

And you wonder why the public has such contempt for majority of politicians and most of the media?

Related links:

Editorial: Just asking: why didn’t anyone object to the Americans at the NEB LNG hearings in Kitimat?

Joint Review media analysis Part one: Calgary Herald columnist advocates curbing free speech on the Northern Gateway Pipeline hearings

(Deborah Yedlin of the Calgary Herald was another columnist who advocated limiting the number of people appearing before the Joint Review Panel. Perhaps this is another case of free speech for Albertans, but not people in BC?)

 

Strong support for Joint Review questioning and final hearings in Kitimat, draft report says

The Northern Gateway Joint Review secretariat has issued a draft final report on the May 30 procedural conference concerning the final two phases of the hearings, questioning and final arguments. There was strong support from some participants, including Northern Gateway, for holding  portions of the questioning round and final arguments in Kitimat.

The JRP released the draft report on June 6, 2012. The JRP’s original plan for final hearings for questioning will take place in three locations Prince Rupert, BC, Prince George, BC and either Edmonton or Calgary, AB.

The JRP had argued that the three locations were centrally located, have adequate facilities and reasonable transportation access. The most contentious issue was that the plans bypassed Kitimat, which is to be the terminal for the Northern Gateway pipeline and the shipping point to send the diluted bitumen to Asia.

The Joint Review secretariat reports that eight participants wanted a hearing at Kitimat. According to the report, Northern Gateway suggested that the discreet issue of “shipping and navigation” could be moved to Kitimat, due to the local interest.  Northern Gateway told the JRP that they would have upwards of 10 to 20 witnesses on the issue of marine environment, as well as related support personnel and asked for a early scheduling decision because their “experts on this issue would be arriving from distant locations and need some timing certainty for their appearance.”

The JRP says the District of Kitimat agreed with Gateway and also suggested issues relating to the marine terminal component of the Project, potential impacts on aboriginal interests, environmental effects of the marine terminal and construction through the coastal mountains.

Cheryl Brown, of Douglas Channel Watch, suggested that issues relating to the “marine terminal site” could be added to this location.

According to the JRP report, the Haisla Nation recommended that hearings be held in the town and not Kitimaat village. Both the Haisla and District of Kitimat emphasized that there would be no logistical issues in terms of accommodation or transportation. “Both groups noted that many hearings have been held in the community in the past, without any problems,” the JRP report notes.

The Haisla noted that if there were no hearings in Kitimat, the nation would prefer that hearings on its issues be held in Vancouver.

The JRP said the majority of parties either took no issue with Prince Rupert or suggested an additional venue be added (such as Kitimat), but five participants questioned why Prince Rupert was considered as it is not directly along the proposed pipeline route.

Those interested in the Alberta hearings appeared to be evenly split over whether the hearings should be in Edmonton or Calgary.

In the conference, as it had in an written submission, Coastal First Nations suggested that Vancouver be added as a final hearing location with videoconferencing of the hearings to both Prince Rupert and Kitimat because of the number of counsel, witnesses and experts coming from, or flying through Vancouver.

The Wet’suwet’en Nation repeated that they would like to have hearings either in Burns Lake or Smithers if more hearing locations were added.

The Gitxaala suggested potentially having Gateway’s cross-examination in one location and cross-examination of intervenors in other locations more convenient to them (i.e. Gitxaala in Prince Rupert). Gateway opposed this idea, stating that if an issues based hearing is going to be adopted, it should be used in its entirety.

All of the participants in the conference agreed that a location be centrally located, have adequate facilities and reasonable transportation access. The JRP notes: “The Haisla in particular noted the centrality of Kitimat and the fact that all three Project components are contained in their territory. The Wet’suwet’en noted that it is important that its hereditary chiefs be able to witness the hearings.”

Most of the participants in the conference supported the use of technology and remote access during the final hearings. The report notes:

The Haisla raised some general concerns about the integrity of the evidence obtained and, for that reason, is of the view that parties who seek to have their witnesses participate remotely should first have to obtain the consent of those that would cross-examine the witness. The Haisla also agreed that procedures need to be implemented to ensure that the information is being provided by witnesses and not prompted by others.

According to the JRP report: “The use of video conferencing facilities was generally seen to be preferable to teleconference capability only. The Wet’suwet’en noted the importance of seeing those providing evidence.”

The Haisla and other parties argued that Aboriginal groups need a clear understanding of the Project before answering questions on potential impacts; questioning Gateway witnesses will assist with that. As such, issues of Aboriginal and treaty rights, the potential impacts of the Project on Aboriginal interests and consultation should be addressed last.

The Government of Canada agreed that it made sense to have issues relating to Aboriginal interests and consultation addressed after other technical issues. Gateway did not believe that these issues needed to be addressed all together at the end of the entire hearing. Rather, issues relating to Aboriginal and treaty rights and interests could be heard at the end of the coastal hearings (either in Prince Rupert or Kitimat). Issues relating to Aboriginal and treaty rights and interests could similarly be dealt with at the end of the Prince George hearings to address these issues for the pipeline component of the Project.

There was also discussion over the location of final arguments.

The JRP suggested that final arguments take place in Prince Rupert and either Edmonton or Calgary with mechanisms to allow parties to participate remotely.

Northern Gateway and ten other participant recommended that final arguments take place in Kitimat instead of Prince Rupert. One party suggested that final argument should take place entirely in one single location (Calgary or Edmonton) while again there was pretty well an even split between the two Alberta cities. Again, the Coastal First Nations suggested that Vancouver be added as a final hearing location with videoconferencing of the hearings to both Prince Rupert and Kitimat.

 

Participants

Northern Gateway Pipelines Inc. (Gateway or applicant)

Alberta Federation of Labour (AFL)

Alexander First Nation (AFN)

Cheryl Brown

Canadian Association of Petroleum Producers (CAPP)

Cenovus Energy Inc (Cenovus);

Nexen Inc (Nexen);

Suncor Energy Marketing Inc (Suncor) and Total E&P Canada Ltd (Total)

Coastal First Nations (CFN)

Communication Energy and Paperworkers Union (CEP Union)

Council of the Haida Nation (Haida)

District of Kitimat

East Prairie Metis Settlement (East Prairie)

Horse Lake First Nation (Horse Lake)

Enoch Cree Nation,

Ermineskin Cree Nation,

Samson Cree Nation

 Kelly Lake Cree Nation (Cree Nations)

Fort St. James Sustainability Group (FSJ)

Gitxaala Nation (Gitxaala)

Government of Alberta

Government of Canada

Haisla Nation (Haisla)

Living Oceans Society,

Raincoast Conservation Foundation and ForestEthics Advocacy (Coalition)

MEG Energy Corp. (MEG)

Northwest Institute for Bioregional Research (NWI)

Office of the Wet’suwet’en (Wet’suwet’en)

Province of British Columbia (BC)

Sherwood Park Fish & Game Association (Sherwood Park F&G Assn)

Swan River First Nation (Swan River)

Terry Vulcano

Josette Wier

   Panel Commission Draft Final Report Procedural Conference 30 May 2012  (pdf)

DFO report to JRP says Northern Gateway pipeline will cross “high-risk” streams but releases only two examples on Kitimat watershed

A Department of Fisheries and Oceans report filed Wednesday, June 6, 2012, with Joint Review Panel says the department has identified streams on the Northern Gateway Pipeline route that Enbridge identified as “low risk” but which DFO considers “high risk.” However, in the filing, DFO says it can’t release a comprehensive list of the high risk streams, preferring instead to give two examples on the Kitimat River watershed.

The DFO report comes at a time when the Conservative government is about to pass Bill C-38, which will severely cut back DFO’s monitoring of the majority of streams. It appears that the anonymous DFO officials who wrote the report acknowledge that they may soon have much less monitoring power because the report says:

Under the current regulatory regime, DFO will ensure that prior to any regulatory approvals, the appropriate mitigation measures to protect fish and fish habitat will be based on the final risk assessment rating that will be determined by DFO.

Note the phrase “under the current regulatory regime.”

The report also identifies possible threats to humpback whales from tanker traffic.

In the report, DFO notes that Northern Gateway’s “risk management framework” is based on DFO’s own Habitat Risk Management Framework, and DFO, notes “the approach appears to be suitable for most pipeline crossings.”

However, DFO further remarks that it has identified

some examples where crossings of important anadromous fish habitat have received a lower risk rating using Northern Gateway’s framework than DFO would have assigned. In addition, DFO has identified some instances where the proposed crossing method could be reconsidered to better reflect the risk rating.

In bureaucratic language, the Department says “DFO reviews impacts to fish and fish habitat and proposed mitigation measures through the lens of its legislative and policy framework” again a strong hint that the legislative and policy framework is about to change.

It goes on to say:

The appropriate approach to managing risks to fish and fish habitat is based on the risk categorization. For example, where high risks are anticipated DFO may prefer that the Proponent use a method that avoids or reduces the risk such as directional drilling beneath a watercourse to install the pipeline. If low risks are anticipated other methods such as open-cut trenching across the watercourse may be appropriate.

While DFO is “generally satisfied” with Northern Gateway’s proposed approach, it says “DFO has identified some crossings where we may categorize the risk higher than Northern Gateway’s assessment.”

DFO then gives Enbridge the benefit of the doubt because:

Northern Gateway continues to refine the pipeline route and we anticipate that assessment of risk will be an iterative process and, if the project is approved and moves to the regulatory permitting phase, DFO will continue to work with Northern Gateway to determine the appropriate method and mitigation for each watercourse crossing. In DFO’s view, Northern Gateway’s approach is flexible enough to be updated if new information becomes available.

DFO then says it

has not conducted a complete review of all proposed crossings, we are unable to submit a comprehensive list as requested; however, this work will continue and, should the project be approved, our review will continue into the regulatory permitting phase. While there may be differences in opinion regarding the risk categorization for some proposed watercourse crossings, DFO will continue to work with Northern Gateway to determine the appropriate risk rating and level of mitigation required.

Here is where DFO points to current, not future policy, when it says:

DFO is of the view that the risk posed by the project to fish and fish habitat can be managed through appropriate mitigation and compensation measures. Under the current regulatory regime, DFO will ensure that prior to any regulatory approvals, the appropriate mitigation measures to protect fish and fish habitat will be based on the final risk assessment rating that will be determined by DFO.

The report then gives two examples of high risk streams both in the Kitimat River watershed

 

Example 1) Tributary to the Kitimat River, KP 1158.4 (Rev R), Site 1269

Northern Gateway Rating: RMF: Low Risk

DFO Rating: RMF: Medium to High Risk

Rationale: This is a coastal coho salmon spawning stream that is quite short in length. It has several historic culverts in poor repair which are already impacting the reported run of approximately 100 spawning salmon. Works can be completed in the dry as this stream dries up during the summer. DFO is of the opinion that the risk rating is higher than that proposed by Northern Gateway due to the sensitivity of incubating eggs and juveniles of coho salmon to sediment and the importance of riparian vegetation for this type of habitat.

 

Example 2) Tributary to the Kitimat River, KP 1111.795 (Rev R), Site 1207

Northern Gateway Rating: RMF: Medium Low Risk

DFO Rating: RMF: Medium to High Risk

Rationale: In DFO’s view the risk rating for this watercourse is higher than that proposed by Northern Gateway because this stream is high value off-river rearing habitat for juvenile salmon such as coho salmon. This type of fish habitat is vulnerable to effects of sedimentation and loss of riparian vegetation.

 

Humpback Whales

The Joint Review Panel also asked DFO for a comment on the status of the humpback whale, especially in the shipping area in the Confined Channel Assessment Area Between Wright Sound and Caamaño Sound.

DFO responds

Four areas of critical habitat were proposed for humpback whales in coastal British Columbia in the Draft Recovery Strategy released in 2010, including the Confined Channel Assessment Area from Wright Sound to Caamaño Sound. However, humpback whales have recently been re-assessed by the Committee on the Status of Endangered Wildlife in Canada (COSEWIC) and were redesignated ‘Special Concern’ but remain ‘Threatened’ under the Species at Risk Act (SARA). A draft recovery strategy for the humpback whale has been prepared.
It is unclear if humpback whales are still protected as a Schedule 1 status species under the SARA and whether a recovery strategy has been finalized.

Fisheries and Oceans Canada Response to the JRPs IR Request  (pdf)

Enbridge claims support from 60 % of First Nations on pipeline route; company also sticks to repudiated Gitxsan deal.

Enbridge Northern Gateway says that 60 per cent of the aboriginal communities on the route of the $5.5 billion Northern Gateway oil pipeline have agreed to accept an equity stake in the project.

In releases to the media today, June 5, 2012, Enbridge says that half of the communities that signed up for a piece of the 10 per cent equity stake on offer are in British Columbia and the other half in Alberta.

There was immediate controversy because Enbridge is refusing to release the names of the communities that have signed up for the deal for “privacy reasons.”

The controversy was heightened late Tuesday when Enbridge spokesman Paul Stanway told The Terrace Standard  the company’s deal with the Gitxsan First Nation still stands, despite the fact both a majority of the heriditary leadership of the Gitxsan and the elected council have rejected the agreement signed by one chief Elmer Derrick.

A blockade of the Gitxsan treaty office is continuing despite a court injunction ordering an end to the blockade.

“We feel we certainly have an agreement,” said Enbridge official Paul Stanway told the Standard in describing discussions it has subsequently had with Gitxsan officials. Stanway said the deal followed a protocol arrangement signed with Gitxsan chiefs several years ago.

“We are confident we were negotiating with the right people,” he said of discussions with treaty society chief land claims negotiator Elmer Derrick and other society officials.

In addition, Art Sterritt, executive director of the Coastal First Nations issued a news release   that called Enbridge’s claims about aboriginal equity partners a “complete sham”.

“We’ve checked with all First Nations on the pipeline route west of Prince George and only two First Nations have signed equity agreements,” Sterritt says in the release.  “Enbridge expanded its pipeline corridor by 80 kilometres  to increase its numbers. Many of those communities that have signed on are located outside of the areas that will be impacted by a spill.”

Sterritt also challenged Enbridge’s contentions on the Gitxsan deal, saying that the Gitxsan people have made it clear they don’t support the project. “They have strongly rejected the agreement.”

Sterritt concluded. “We intend to stop this project.”

Sterrit says his coastal alliance is “absolutely mystified” about the inclusion of the Metis — who don’t have aboriginal rights and title within the corridor — in Enbridge’s 60 per cent. (Representatives of the Metis have taken part in the Joint Review hearings from the opening days of hearings in Kitimat last January).

Enbridge has announced before that First Nations support the pipeline project but, with the exception of Derrick, has never publicly discussed which nations support the project.

The near simultaneous announcement by Enbridge of First Nation’s support for the pipeline and the statement that the company is sticking with its agreement with Elmer Derrick could raise more controversy by causing more splits within First Nations if a few individuals sign and then the agreement is repudiated by other leaders, as happened with the Gitxsan Nation.

The pipeline which would run more than 1770 kilometres from the Alberta bitumen sands to Kitimat, carrying 525,000 barrels of diluted bitumen in the first train and as much as 825,000 barrels in the second train. If everything is approved, Enbridge hopes to ship the bitumen by 2017.

“It’s a good place for us to start in demonstrating that there is aboriginal support for Northern Gateway,” Stanway said. “It’s not 100 per cent, but neither is it the wall of opposition that our opponents sometimes claim.”

The 10 per cent equity ownership for the First Nations who signed the deal will give them about $280 million over 30 years. They would see cash flow starting in the first year of the pipeline’s operation.

There are 45 First Nations along the pipeline, but Stanway wouldn’t give a final figure on how many signed on.

“Some of those are willing to partner with us. That’s not to say they still don’t have some concerns. They want to make sure that we build and operate the pipeline as safety as possible.”

Wilf Adam of the Lake Babine First Nation in Burns Lake, B.C., the Canadian Press (as reported on the  Global BC  site)  he refused to sign the equity agreement because Enbridge was unwilling to release more details in the contract.

“I’d been asking for the financial figures and I’d been asking about the employment. They said there would be a lot of employment.”

Adam told CP it appeared to him that there would be few jobs available for his people. Hesaid there was a flurry of emails and phone calls from Enbridge officials after the company moved the deadline for signing the equity agreement up to May 31.
Related links

Reuters: Enbridge Northern Gateway wins some native support

Globe and Mail: Some first nations want equity in Northern Gateway, but opposition remains

Common Sense Canadian Tough Questions for Enbridge on its Alleged Support from First Nations

CBC Majority of aboriginal communities sign on to Northern Gateway

TransCanada to build Shell’s “Coastal Gaslink” natural gas pipeline to Kitimat

Trans Canada logoShell Canada and its Asian partners have chosen TransCanada Corporation to design, build, own and operate the proposed natural gas pipline to Kitimat, now called the Coastal GasLink project.

The estimated $4-billion pipeline will transport natural gas from the Montney gas-producing region near Dawson Creek, in northeastern British Columbia to the proposed natural gas export facility at Kitimat, BC.

The LNG Canada project is a joint venture led by Shell, with partners Korea Gas Corporation, Mitsubishi Corporation and PetroChina Company Limited.

A news release from TransCanada says “Shell and TransCanada are working toward the execution of definitive agreements on the Coastal GasLink project.”

In the release, Russ Girling, TransCanada president and CEO says:

Our team has the expertise to design, build and safely operate pipeline systems. We look forward to having open and meaningful discussions with Aboriginal communities and key stakeholder groups, including local residents, elected officials and the Government of British Columbia, where we will listen to feedback, build on the positive and seek to address any potential concerns. Coastal GasLink will add value to British Columbians, particularly Aboriginals and communities along the conceptual route, by creating real jobs, making direct investments in communities during construction and providing economic value for years to come.

TransCanada says the company has approximately 24,000 kilometres of pipelines in operation in western Canada including 240 kilometres of pipelines in service in northeast BC. Another 125 kilometres of proposed additions either already having received regulatory approval or currently undergoing regulatory review. These pipelines form an integral and growing part of TransCanada’s NOVA Gas Transmission Ltd. (NGTL) System, which brings natural gas from Alberta to British Columbia to a hub near Vanderhoof.

Girling said in the release:

TransCanada is a leading energy infrastructure company in North America, with a 60-year history of safe, efficient and reliable operation of our assets and a respect for the communities and environments where we operate. We appreciate the confidence that Shell and its partners have placed in us to build, own and operate this natural gas pipeline in British Columbia. We will work collaboratively with them, Aboriginals and other stakeholders as we launch into the initial phases of consultation and regulatory review.

LNG Canada logo

Project parameters

 

In it’s release TransCanada describes the potential Coastal GasLink pipeline project this way:

  • Receipt point: Near Dawson Creek, BC
  • Delivery point: Proposed LNG Canada facility near Kitimat, BC
  • Product: Natural gas from BC’s abundant Montney, Horn River and Cordova basins and elsewhere from the Western Canada Sedimentary Basin
  • Length of route: Approximately 700 kilometres of large diameter pipe
  • Initial pipeline capacity: In excess of 1.7 billion cubic feet of gas per day
  • Anticipated jobs: Estimated 2000-2500 direct construction jobs over a 2- during construction 3 year construction period
    Estimated cost: Detailed cost information will be developed following completion of project scoping and planning. The current estimate is approximately $4 billion
  • Regulatory process: Applications for required regulatory approvals are expected to be made through applicable BC provincial and Canadian federal processes
  • Estimated in-service date: Toward the end of the decade, subject to regulatory and corporate approvals

Pipeline route

TransCanada says: “The final pipeline route will take into consideration Aboriginal and stakeholder input, the environment, archaeological and cultural values, land use compatibility, safety, constructability and economics.:

Pacific Trails Pipeline
The Pacific Trails Pipeline would go cross country to Kitimat. (PTP)

At this point there are two possible routes for the pipeline west of Vanderhoof. One route would be to follow the existing Pacific Northern Gas route that roughly parallels Highway 16. The second possibility is a cross-country route, which may lead to controversy. The Pacific Trails Pipeline, which would feed the KM LNG partners (Apache, Encana and EOG) goes across the mountains from Smithers. While the PTP project has the approval of most First Nations in the regions, Apache and PTP are still in negotiations with some Wet’suwet’en houses over portions where the pipeline would cross the traditional territory of the houses. The much more controversial Enbridge Northern Gateway pipeline follows a similar cross-country route and faces much stiffer opposition than the Pacific Trails Pipeline, due to the content of that pipeline, mainly diluted bitumen and because, critics say, Pacific Trails managed to secure the most geologically stable cross country route earlier in this decade when the pipeline was originally planned to import, not export, natural gas.

TransCanada says the Coast Gaslink pipeline will also have an interconnection with the existing Nova Gas (NGTL System and the liquid NIT) trading hub operated by TransCanada.  The company says:

A proposed contractual extension of TransCanada’s NGTL System using capacity on the Coastal GasLink pipeline, to a point near the community of Vanderhoof, BC, will allow NGTL to offer delivery service to its shippers interested in gas transmission service to interconnecting natural gas pipelines serving the West Coast. NGTL expects to elicit interest in and commitments for such service through an open season process in late 2012.

That means that the Asian customers will not be just dependent on natural gas from northeast British Columbia.  Instead the “molecules” of natural gas from Alberta will join the stream heading to Kitimat. “Open season” in the energy industry is an auction where potential customers or transporters bid for use the pipeline.

In the release Girling says:

The potential Coastal GasLink pipeline project will allow British Columbians, and all Canadians, to benefit from the responsible development of valuable natural gas resources and will provide access to new markets for that gas. The project will also create substantial employment opportunities for local, skilled labourers and businesses as part of our construction team,” concluded Girling. “We know the value and benefits that strong relationships in British Columbia can bring to this project and we look forward to deepening those ties as our extensive pipeline network grows to meet market and customer needs.

TransCanada Corp. is no stranger to controversy, the company is the main proponent of the Keystone XL pipeline from Alberta to the US Gulf Coast. Portions of that pipeline were put on hold by President Barack Obama pending further review and Keystone has become a hot issue in the current American presidential election.

Haisla aim to take on feds, Alberta over Gateway

Haisla Nation

The Haisla Nation have filed papers with the Northern Gateway Joint Review Panel asking permission to question both the federal and Alberta governments during the questioning phase of the hearings.

 

A letter from the Haisla’s lawyer, Jennifer Griffith of the law firm Donavan & Company explains:

The Haisla Nation intends to question federal government participants on the following aspects of the proposed project:

1. The federal government’s evidence;

2. The adequacy and completeness of the information provided by the proponent;

3. The potential impacts of the proposed project;

4. The proponent’s proposed approaches to mitigation;

5. The regulatory role of the federal government with respect to the proposed project.

Griffith says the Haisla Nation want information “about potential environmental effects of the proposed project and the suitability of the proposed mitigation” and to find out if the controversial pipeline project “will result in significant adverse effects that cannot be mitigated, and on potential impacts to the Haisla Nation’s aboriginal rights, including aboriginal title.”

Griffith adds that the federal government plays a significant role in the proposed project approval, permitting and in regulatory oversight.

In addition, various federal government departments are charged with administering legislation applicable to the project that is designed to protect the environment or species at risk. The federal government’s assessment of the proposed project is therefore required in order to have a full understanding of the potential project effects.

The federal government has participated in the information requests to the proponent phase, and has filed evidence. Fairness requires that the Haisla Nation have the opportunity to test the evidence submitted by the federal government, and to explore the role of the federal government in the regulations of the proposed project.

On Alberta, Griffth says The Haisla Nation intends to question the Government of Alberta on the Wood Mackenzie Netback Analysis (a study commissioned by the Calgary Chamber of Commerce on ways of exporting oil from Alberta and the transportation corridors needed to get the oil to markets in Asia), adding

Information about potential economic benefits anticipated to result from the proposed project is relevant to the Canadian public interest assessment required for the proposed project.

Haisla Nation questioning Federal Government   (pdf)

Haisla Nation questioning Government of Alberta  (pdf)

Joint Review Panel Submission Calgary Chamber of Commerce  (pdf)

BC, Haisla, file objections to JRP bypassing of Kitimat; Enbridge likes venues, avoids the tanker problem

Both the province of British Columbia and the Haisla Nation have filed strong objections with the Northern Gateway Joint Review Panel about the panel’s plans to bypass Kitimat for the questioning and final argument phases of its examination of the controversial pipeline project.

At present, the Joint Review Panel plans to hold questioning hearings in Prince Rupert, Prince George and either Calgary or Edmonton and final arguments in Prince Rupert and Calgary/Edmonton.

And if Prime Minister Stephen Harper and Natural Resources Minister Joe Oliver wanted to speed up the hearings and therefore approval of the Northern Gateway project, filings from all sides indicate more time is needed than the two months allocated by the JRP.

The JRP secreteriat plan a meeting in Calgary on May 30 to consider the procedures.  The three panel members will not attend.  A large number of intervenors or government participants will be represented in person or take part in a conference call.

The lawyer for the Haisla Nation, Jennifer Griffiths, points out in her filing with the JPR, “Prince Rupert is not a logical location for any of the hearings.”

Updated: The District of Kitimat, which is registered as a “government intervenor” will participate in the conference call.

The law firm representing the Enbridge Northern Gateway, agrees with the JRP preliminary decision to hold the hearings in Prince Rupert, Prince George and Calgary or Edmonton. However, Enbridge’s lawyer Richard Neufeld, of Fraser, Milner, Casgrain, makes it clear that for those hearings they are not involved in the operation of tankers carrying the bitumen they sell to customers.

This includes a marine terminal at Kitimat. Northern Gateway recognizes the interest of the public, government, and First Nations in respect of the potential effects of ships calling on the proposed marine terminal, but it is important to bear in mind that Northern Gateway will not own or operate any marine vessels. No approvals are sought, or required, for such operations, as they are subject only to laws of general application which apply to all shipping into or out of Canadian ports.

The Ecojustice group, also known as the Sustainability Coalition,  an alliance of the Living Oceans Society, Raincoast Conservation and ForestEthicsAdvocacy wants hearings in Vancouver. The Coastal First Nations also want the hearings in Vancouver.

The Wet’suwet’en  want more hearing locations especially in the areas of the proposed route to address those most affected, telling the JRP:

The Office of the Wet’suwet’en (OW) is localized in Smithers, BC, our territory is 22,000 square kilometres and 170 kilometres is proposed to be crossed by NGP prior to crossing the coastal mountain range. The OW requests that hearings be held in Smithers or Burns Lake for full days rather than half days to reduce travel and accommodation costs for intervenors.

In the provincial filing, Christopher Jones, counsel for British Columbia says:

the Province submits that it is essential for a portion of the final hearings to take place in Kitimat. Kitimat is the proposed location of one terminus of the proposed pipeline, and of the proposed marine terminal. As a result, that locality has a particular interest in these proceedings. There are sufficient facilities and transport access to Kitimat to allow the hearings to take place there…..

The letter from Jones goes on to stay that BC believes “the Province would again submit that certain issues should be dealt with at Kitimat” rather than Prince Rupert.

Griffith, of the Vancouver law firm, Donavan and Company, filing on behalf of the Haisla Nation says:

The Haisla Nation questions why no final hearings are proposed for Kitimat. Given the significant new infrastructure associated with the project that is proposed to be located in the Kitimat area, Kitimat is a logical location for hearings. Kitimat is serviced by the Terrace airport, which is only 56 km away. Kitimat also has dock facilities for parties who may be travelling to the hearings by boat. Finally, there is ample accommodation in the Kitimat I Terrace area. Prince Rupert is not a logical location for any of the hearings. The proposed pipeline does not go near Prince Rupert, the terminal is far from Prince Rupert, the tankers would go through Douglas Channel, not past Prince Rupert. Prince Rupert is not accessible to the Haisla Nation by way of a direct flight.

Griffith also says the final arguments should be held either in Kitimat or Vancouver.

The Haisla Nation will have to participate in every aspect of the hearings. Yet the Panel is currently not proposing to hold any of the questioning phase or final hearings in Kitimat. As set out in the comments below, the Haisla Nation is of the view that the questioning and final hearing locations slated for the western terminus of the project should be held in Kitimat, not in Prince Rupert.

Enbridge, on the other hand, through its lawyer, Richard Neufeld, says:

Northern Gateway agrees with the Panel’s observations regarding the need to select hearing venues that are centrally located, have adequate facilities and reasonable transportation access for the large numbers of witnesses and back-up support personal required. Northern Gateway also agrees that Prince Rupert, Prince George and Calgary/Edmonton meet these criteria. Northern Gateway also agrees that if economic issues are to be dealt with in a single venue, it would be appropriate to do so in Calgary or Edmonton. Of the two, Calgary would be a more logical location given its convenience for those participating in that aspect of the proceeding.

Enbridge also has reservations about the process, while it wants the hearings “streamlined,” the company is concerned about the plan to split the hearings into various issues could be “prejudicial” to the project.

Northern Gateway expects that the Panel is considering an issues-based hearing in an effort to streamline the hearing process, and to make the process more accessible to those who want to participate only when specific issues or topics are under discussion. Both objectives are laudable.

However, an issues-based hearing format has the effect of forcing the Applicant to split its case into multiple parts. This is potentially prejudicial to the Applicant – especially if the issues identified for litigation do not correspond to the manner in which the Application has been structured.

The EcoJustice group wants hearings in Vancouver, largely because many of its members are there, with staff lawyer Barry Robinson, saying to the JRP:

The Coalition recommends that the Panel consider adding a fourth hearing location in Vancouver. The Coalition notes that, logistically, many of the witnesses and counsel that would appear in Prince Rupert would travel through Vancouver. If the vast majority of the witnesses and counsel to appear on any given issue will be required to travel from or through Vancouver, the Coalition recommends that the issue be heard in Vancouver to reduce travel costs and related greenhouse gas emissions.

However, the Coalition is sensitive to the needs of local intervenors in the Prince Rupert area and would ask that the Panel use its discretion in allocating topics to be heard in Prince Rupert and Vancouver.

And later:

The Coalition recommends that the Panel consider hearing final argument in Vancouver as a third location. The Coalition is supportive of the Panel providing an option for remote participation.

Coastal First Nations have a similar proposal. Art Sterritt, Executive Director says:

the JRP should consider holding hearings on marine issues in Vancouver with video links to Prince Rupert and Kitimat as a way of reducing the costs to Intervenors (many experts and legal and technical representatives live in the lower mainland) and in recognition that Kitimat is the proposed site of the Marine Terminal and that there are many people in the lower mainland who use the area for recreational, commercial fishing and other uses.

It appears that there will soon be controversy over the time allotted both for questioning and final arguments. The Haisla, other First Nations and Ecojustice and even Northern Gateway appear to want more time for questioning and cross-examination, while, for example, the Canadian Association of Petroluem Producers, the industry representative says it:

is still considering the scope and extent of its participation in questioning during the final hearings. CAPP will work with other intervenors in order to minimize the overall time required for cross­ examination.

It is clear that Enbridge Northern Gateway is planning tough cross-examination of the intervenors and their evidence:

Northern Gateway intends to cross-examine each of the authors of reports prepared for Interveners opposing the Project, and filed as written evidence. In some cases, the evidence filed with the Panel does not identify authorship, which makes it impossible to specify who will be cross-examined. Materials filed by certain interveners also include information collected through means such as access to information requests, which also makes it impossible to identify who might speak to such evidence if it is allowed to remain on the record.

Northern Gateway’s review of the written evidence filed by interveners has identified approximately forty five detailed reports that have been prepared for this proceeding. Reports of a more basic variety, those that provide general information on traditional use matters and reports of marginal relevance need not be subject to extensive cross-examination by Northern Gateway (if at all). Although no final decision has been made, for planning purposes the Panel should allot approximately twenty hearing days for cross-examination by Northern Gateway. Once a decision has been made on hearing venues and format, we will provide a more definitive estimate to Panel counsel and to counsel for the interveners involved. Where Northern Gateway does not consider it necessary to cross-examine a particular author, we will advise others of that so as to avoid unnecessary expense and inconvenience.

The Coastal First Nations are also planning tough cross-examination:

Coastal First Nations intends to cross-examine NGP, Transport Canada, Canadian Coast Guard, DFO, CEAA (as crown consultation coordinator and expert on environmental assessment methodology) and possibly the Government of B.C. These cross­ examinations will focus on risk assessment, spill response, measures to prevent incidents, and reduce risk of spills, consequences of spills, and Aboriginal consultation. Naturally, until the JRP approves the government participants we wish to cross-examine, and NGP identifies the witnesses they will present, it is difficult to determine the amount of time needed for cross-examination. It would likely take several hours of cross-examination for each party.

The Hasila say:

The Haisla Nation does not have any input into the proposed general schedule as set out above, but does question the two-month period provisionally allotted for the questioning phase in accordance with the revised Hearing Order. The Haisla Nation anticipates that the questioning phase will require substantially more than two months.

The Wet’suwet’en also object to the short notice given for the May 30 procedural meeting:

The estab!ishment of this regulatory process is insufficient to afford meaningful consultation to the Wet’suwet’en. We are hard pressed to try and prepare our hereditary leaders and clan speakers in such short notice, especially with a long weekend within the timeframe, some of our leaders and speakers are out on the territories preparing themselves for their summer traditional food gathering, and cultural activities. There is insufficient time given to the Wet’suwet’en for this process.

The Wet’suwet’en say (and this likely applies to other BC First Nations) that hearings as proposed could make it difficult to consult with elders saying “discussions with hereditary leaders and elders must take place, as per our custom…”

All of this comes as Prime Minister Stephen Harper and Natural Resoures minister Joe Oliver and many in the right-wing media want the hearings sped up, which means the May 30 meeting may be heated and any decision politically charged.

JRP filings from

Province of British Columbia  (pdf)

Haisla Nation  (pdf)

Enbridge Northern Gateway Pipelines  (pdf)

EcoJustice (Living Oceans Society, Raincoast Conservation Foundation, ForestEthics Advocacy Sustainability Coalition)  (pdf)

CAPP (pdf)

Coastal First Nations Great Bear Initiative (pdf)

Office of the Wet’suwet’en  (pdf)

Government of Canada (pdf)


Editorial: It’s time for the District of Kitimat to play hardball on Gateway

EDITORIAL

Who speaks for Kitimat?

Someone has to speak for Kitimat on the Northern Gateway project.

The District of Kitimat Council no longer has a choice. It’s time to play hardball with Ottawa and Enbridge on the Northern Gateway Pipeline.

You can’t negotiate from a position of weakness.

The game of pipelines changed forever in recent weeks, when the Conservative government introduced Bill C-38, the Budget Implementation Act.

Bill C-38, which passed Second Reading on May 14, 2012 is an affront to basic democratic principles, a 425 page omnibus monster that will not permit the kind of careful consideration of major changes in Canadian society that what was once normal in a free and democratic society. The omnibus bill not only concerns the federal budget but also repeals the environmental assessment process and guts fisheries protection for the smaller spawning streams where salmon are born. By giving the federal cabinet the power to overrule the National Energy Board, the decision on the pipeline rests with just one man, Prime Minister Stephen Harper, who has made no secret that he intends to push the project through no matter how fierce the opposition to the project.

This week has seen devastating cutbacks along the west coast, to environmental monitoring and pollution control, to Coast Guard protection.  It is now clear that protection of the environment  along the BC coast and the lives of the mariners who sail those waters are of little importance to Ottawa, and of no importance to the war room types counting votes in Alberta and suburban ridings outside Toronto and Vancouver.

The District of Kitimat Council has voted to wait to make a decision until after the report of the Joint Review Panel, when “all information” is available.

The news this week that the Joint Review Panel decided to bypass Kitimat, that the town that is to be the terminal of the proposed pipeline is irrelevant to the process, shows more than any other move what the JRP thinks of Kitimat. Not much.

The Joint Review Panel has lost all credibility. Even if the JRP does produce a fair and honest report with valid recommendations for conditions and restrictions, it is highly unlikely that those recommendations will be fully implemented, because the final decision will be made in the Prime Minster’s Office and that decision will be build, baby, build.

Media reports in recent months have shown that Enbridge has easy access to the senior levels of the Conservative government and Enbridge lobbying preceded the changes to the Fisheries Act in Bill C-38.  Enbridge  walks the halls of power in Ottawa. Kitimat, on the other hand, counts for little, as the JRP schedule clearly shows.

So, for example, even if the Joint Review Panel recommends strict conditions on the pipeline to insure the safety of Kitimat’s water supply, and if Enbridge doesn’t like those conditions, there is no guarantee that Harper and the cabinet will implement those recommendations. That would leave the District of Kitimat holding the water barrel for several years.

(One of the many reasons, it seems, that the JRP wants to have all the northwest hearings is in Prince Rupert is so the high-priced energy lawyers from Calgary can have comfortable accommodation. So, if any protests from the District and the Haisla Nation are successful and there actually are final hearings in Kitimat,  perhaps the District could arrange for the lawyers to camp in Radley Park, so they can actually grasp the realities of living in Kitimat by the Kitimat River.)

The District of Kitimat Council has a duty to make sure that this region is protected.

So what does this mean?

“Armed neutrality”

It is now too late for the District Council to take a position for or against the pipeline. It no longer matters whether Mayor and Councillors support the pipeline, are sitting on the fence or oppose the pipeline. Bill C-38 has made the decision for the Council.

Council must assume that Stephen Harper will impose the pipeline on Kitimat and will impose conditions that could be determinable to the District in favour of Alberta and Enbridge.

From now on Council must unify and work to protect the District from Stephen Harper. The Council must make sure that the District is an aggressive force at any negotiating table or court battle.

That means Council should retain its position of neutrality, leaving opposition to the pipeline to others like Douglas Channel Watch. Given the growing witch hunt against the environmental movement, an official position of neutrality is negotiating from a position of strength and protects the District from any accusation that “radicals” are distorting the District’s position.

In international affairs, countries like Switzerland and Sweden are neutral, robustly neutral. Both Switzerland and Sweden practice what is called “armed neutrality.”

“Armed neutrality” means that Kitimat Council can no longer continue its current wishy-washy neutrality, arguing over the nuances of words in letters to the Joint Review Panel and Enbridge. To protect Kitimat, Council must adopt its own policy of “armed neutrality,” an aggressive stance that represents the entire community, both opponents and supporters of the pipeline.

So what now?

Professional advice

The announcement this week that Shell is planning to build a liquified natural gas facility in Kitimat, in combination with the KMLNG and BC LNG projects plus Enbridge, means it is vital for the District to have independent, professional advice on energy issues.

The District must immediately start paying much closer attention to the all the relevant documents that are filed with the Joint Review Panel. The District Council and staff must have their own independent advisers rather than juggling the views of Douglas Channel Watch and Enbridge and hoping for the best. That means hiring more professionals to supplement current staff that will understand the technicalities of both the Enbridge pipeline and the LNG projects; staff who can advise the senior administration and Council about how to proceed where the issues of the pipeline construction, terminal construction and management of the terminal come under municipal jurisdiction or could adversely affect the municipality.

That takes money, even though money is tight, Council must budget for that staff. When it comes to negotiating factors within the responsibility of the municipality, Kitimat must be at the table at full strength.

All the way to the Supreme Court

It is now certain that after Stephen Harper orders the pipeline to go ahead, disputes over the Northern Gateway Pipeline will end up in the courts. Lawyers are already talking about the constitutional necessity to consult First Nations, that pushing the pipeline across aboriginal traditional territory will violate Rights and Title.

First Nations across British Columbia are already represented by some of the best lawyers in Canada.

Vancouver is already looking at what powers a municipality has to make sure that city is fully protected in case of a catastrophic tanker accident from the Kinder Morgan pipeline and project.

Yes, the District is wary because of the long and bitter fight over power allocation, but that is in the past. Again Bill C-38 gives the District no choice but to prepare for new legal battles, probably all the way to the Supreme Court of Canada.

The District of Kitimat must immediately budget for, seek out, retain and instruct a law firm that  can advise the District on its rights and responsibilities now and in the future once the Harper government imposes the pipeline on Kitimat. As we have seen from the Joint Review and other National Energy Board hearings, the energy industry hires the best lawyers money can buy.

If Kitimat has to face those lawyers, the District can’t act like a Junior B team facing the NHL All-Stars. That law firm should be able to advise Kitimat on the constitutional issues involved and what powers a municipality has to protect the community from unwanted and unwarranted aspects of pipeline and tanker development. That law firm must also be able to participate in hardball business negotiations.

Seeking Alliances

The District must build better bridges with the Haisla Nation and find where there is common ground in the Kitimat region as Stephen Harper imposes the pipeline on the northwest. They may be arguments before the courts or with Enbridge where both the Haisla and the District of Kitimat are allies in a fight.

Stephen Harper and his government are prepared to impose the pipeline, terminals and tanker traffic on northwestern British Columbia, again no matter what local municipalities and regions say. All the environmental and Coast Guard safeguards that might have brought acceptance of the Enbridge project are being cut to the bone. That means Kitimat must also forge alliances with those municipalities and regions, again to make sure that local rights and responsibilities are fully protected once the government decides to impose the pipeline on the northwest.

It is highly likely that the constitutional consultation and Rights and Title cases on the pipeline will end up at the Supreme Court of Canada. If there are other cases, perhaps raised by Vancouver or other Lower Mainland or northern communities or even the Province of British Columbia, it may be that the Supreme Court, as it has with some cases in the past, could consolidate all the pipeline cases into one. That means Kitimat will need to be a participant in any case on the pipeline before the Supreme Court.

Unless District of Kitimat Council starts playing hardball, Stephen Harper will drive a bulldozer down bank of the Kitimat River to Douglas Channel, ignoring the council standing and watching from the hill looking over the pipeline trench. 

Alterra acquires coastal island wind farms to supply LNG plants, but how will it get to Kitimat?

Updated with Alterra comments.
Alterra Corp logoA Vancouver-based energy company, Alterra Power Corp, today, May 18, 2012, announced the acquisition of three wind farm sites off the northernwestern British Columbia coast.

A news release from Alterra notes that the three “early-stage wind farm” sites, on Banks Island, Porcher Island and McCauley Island are “all within 150 kilometres of several proposed power-intensive LNG plant sites at Kitimat.”

The three sites plus one on Vancouver island will have an estimated generation capacity of over 1,000 megawatts for the four sites.

Alterra acquired the sites from English Bay Energy Limited. Alterra says “the sellers will receive royalty payments during the operations phase of the projects, and under certain circumstances the sellers may receive additional compensation of up to 1.34 million Alterra shares.”

The release quotes John Carson, Alterra’s Chief Executive Officer, as saying, “This transaction further positions us to play a major role in B.C.’s clean energy future. We look forward to advancing and ultimately building these wind projects as a part of the continued growth of Alterra and British Columbia.”

 

Satellite map of BC showing Kitimat and wind farm locations
A satellite image of northwestern BC showing the location of Kitimat and the three islands that are the location of the proposed windfarms to supply to Kitimat’s LNG projects. (Satellite image NASA/MODIS)

When informed of the announcement, Kitimat mayor Joanne Monaghan asked, “How are they going to get it here?”

While the three islands are within 150 kilometres of Kitmat, any transmission lines would have to somehow cross the Inside Passage and its heavy ship traffic, including cruise ships, ferries, fishing vessels and bulk carriers (not to mention potentially tankers),  and then also get over some of the most rugged mountain territory in Canada to reach any of the three liquified natural gas sites in Kitimat.

“I know that all of the LNG plants considering coming in here, including Shell, are talking about co-gen [co-generation of electricity using natural gas], because if they don’t do co-generation they’re going to have to bring all of this in from the Site C Dam and that is going to make it totally out of the range of their price,” Monaghan said. She also remarked that the cost of building transmission lines from the three off shore islands could also be prohibitive.

Alterra spokesman Anders Kruus said that supplying power from the islands to Kitimat a major consideration but added it  “would not be an insurmountable problem.”

He said the company’s predecessor before a merger, Plutonic Power, had built “the province’s largest run-of-river hydro facility at Toba Inlet not far from Powell River  (80 kilometres) and in the process of building that, beause the run-of-river facilty was quite far back, not accessible by roadway, you have to barge in, we built a 120 kilmetre long tranmission line out to Saltery Bay. So we’ve done it over the mountains.”  Kruus said.

“It’s early days,” Kruus said and the company now plans to compile more wind data before proceeding.  He acknowledged that the “intermittency of the wind” could be a problem with an LNG plant that requires a consistent, balanced power load and so the best “off-taker” (customer) for the wind energy electricity might likely be BC Hydro who could balance the power from the project within  its own system before supplying it to customers.

On its website, Alterra Power Corp describes itself as

a leading global renewable energy company, formed in 2011 through the merger of Magma Energy Corp and Plutonic Power Corp.  We operate six power plants totaling 570 MW of capacity, including two geothermal facilities in Iceland, a geothermal plant in Nevada, British Columbia’s largest run of river hydro facilities and the province’s largest wind farm. Our 300 MW share of production generates over 1,400 GWh of clean power annually. We have an extensive portfolio of exploration and development projects, a skilled international team of explorers, builders and operators as well as the strong financial capacity to support our aggressive growth plans.