Water, not oil, is the hot issue this summer in Kitimat

Kitimat's "Hospital Beach" on March 17, 2012, with the construction at the Rio Tinto Alcan plant in the background, before the area was closed to the public. (Robin Rowland) (Robin Rowland)
Kitimat’s “Hospital Beach” on March 17, 2012, with the construction at the Rio Tinto Alcan plant in the background, before the area was closed to the public. (Robin Rowland)

 

The hottest issue in Kitimat this summer is water, not oil. For us, this summer can be summed up by saying: “Water, water everywhere, but you can’t get there from here.”

Even with David Black’s proposal for an oil refinery on a hill 25 kilometres north of Kitimat, residents here know that the Enbridge Northern Gateway debate has gone on for years and will go on for many years to come.

As environmentalists worldwide celebrate the beauty of Douglas Channel, and decry the dangers that tanker traffic could pose to the channel, many people in Kitimat are cut off from the waterfront.

At the District of Kitimat Council meeting on August 7, Coun. Mario Feldhoff introduced a motion calling for a study in an effort to find ways to launch kayaks into the ocean. Yes that’s right, according to members of council, you can’t even drop a kayak into the waters of Douglas Channel unless you pay the kind marina a launch fee usually charged for larger fishing boats. Kitimat is down to only one expensive boat launch.

In 2010, there were three marinas in Kitimat: one privately operated at a place called Moon Bay, a large marina owned by the Kitimat Stikine Regional District at MK Bay and a small marina at Minette Bay, also the site of a log export operation. There was also a boat launch on land known as “Alcan beach” or “Hospital Beach” on property owned by Rio Tinto Alcan (RTA) near the aluminum smelter. Hospital Beach is the only beach in Kitimat (named because it is on the site of the town’s original hospital in the 1950s). Moon Bay was located on land owned by RTA, and in April 2010, it ordered the marina shut down.

According to RTA spokesperson Colleen Nyce, that was largely due to concerns about how the marina was being operated.

Some people who moored their boats at Moon Bay moved to MK Bay (if there was room). Others hauled their boats out of the water and parked them in their driveways. In the ensuing two years, there have been increasing stories about mismanagement at MK Bay and complaints about moorageand launching fees that are much higher than elsewhere in the province.

This spring, citing construction at the smelter, RTA closed public access to Hospital Beach for picnics, kids’ play and just looking at the water. That meant the boat launch was also off-limits. RTA spokesperson Nyce said:

The Rio Tinto Alcan site is now a full fledged construction zone with constant vehicular and heavy duty construction traffic. To that end, and as Rio Tinto Alcan representatives have always said, during construction we will take necessary steps to eliminate potential hazards to the general public on our road including access to Hospital Beach. Therefore, Hospital Beach will be closed to the public until construction is complete or until we believe it is more safe for public access.

Before access was closed, if a Kitimat resident was driving to Hospital Beach, they pass what was once a rough logging road that snaked its way along the shores of Douglas Channel toward Bish Cove. Now Bish Cove is the site of the Kitimat LNG project terminal. As part of the construction process, KM LNG upgraded the road. However, as the pace of construction increases KM LNG is now limiting access to the road and its views of the channel.

Why is there no access to the waterfront, or for that matter to the magnificent Kitimat River estuary?

It goes back to 1950 when the province of B.C., in a loosely worded agreement with what was then Alcan and in an equally non-specific Industrial Development Act, handed over the land where Kitimat is now to the company.

That included almost all the waterfront and the estuary. On the estuary, there is one small area of land that is a reserve for the Haisla Nation and one small area not in RTA domain owned by the District of Kitimat — but there is no right of way through a potential private development. Over the years, and especially since Rio Tinto took over Alcan, there have been more and more restrictions placed on access to Kitimat’s waterfront.

Restricted access has become such an important issue that it came up during the National Energy Board hearings on the Kitimat LNG project and was part of the NEB ruling granting KM LNG its export licence. Access to Kitimat’s waterfront is also a factor in the Enbridge Northern Gateway project, although that part is lost in all the bigger issues.

The fact that you can’t get to the waterfront and the estuary are a problem not only for community recreation; the inability for a resident or visitor to launch a kayak or small boat into the channel, much less larger fishing or recreational vessels, has put the brake on expansion of Kitimat’s already lucrative fishing, guiding and boating services.

There is already a lot of skepticism in Kitimat — due to the boom and bust of the industrial cycle — about all those promises of jobs and prosperity from industrial development. Restricted access to the ocean means that despite the growing number of jobs in Kitimat, corporate policy makes it hard to enjoy the benefits of living on the Douglas Channel.

It is the kind of externality that is always ignored by economists and is totally irrelevant to those business writers who claim to be experts in Kitimat but who have never been within 1,000 kilometres of the town.

You look out your window at the mountains and ocean of Douglas Channel and ask why can’t the residents and tourists go to the beach? That could be a key issue in the Enbridge Northern Gateway debate.

Douglas Channel in Black and White

[photoshelter-gallery g_id=”G000034M5Z2_lI4Q” g_name=”Douglas-Channel-in-black-and-white” f_show_caption=”t” img_title=”iptch” pho_credit=”iptc” f_link=”f” f_send_to_friend_btn=”t” f_fullscreen=”t” f_topbar=”t” f_bbar=”t” f_htmllinks=”t” f_mtrx=”t” fsvis=”f” width=”615″ height=”461″ f_constrain=”t” bgcolor=”#AAAAAA” btype=”new” bcolor=”#CCCCCC” crop=”f” trans=”xfade” tbs=”10000″ f_ap=”t” bgtrans=”f” linkdest=”c” twoup=”f” f_bbarbig=”” f_enable_embed_btn=”f” f_show_watermark=”f” f_show_slidenum=”f” f_smooth=”f” f_up=”f” target=”_self” wmds=”llQ6QNgpeC.p1Ucz7U.Y5p9TTphsaUCWglrsuG3u3BJwmfV6PzC2SqyK_HnEz4rFhVjU4A–” ]

Photogallery. For full screen mode with captions, click on the box to the right of the bottom menu bar.

The long, magnificent fjord known as Douglas Channel was carved by a glacier thousands of years ago, some of the islands are rock uplifted by tectonic forces, others piled up by retreating glaciers.

So far, since I returned to Kitimat, I have had few chances to “go down the Channel,”  as the people of Kitimat say.

Of course, when I do go,  I always have a camera with me, even in the roughest weather–and the Channel can be rough most of the year.

It is in these waters that the energy industry, both the Enbridge Northern Gateway and the Liquefied Natural Gas projects want to use supertankers to send their products to markets in Asia. Many of the photographers who come to Douglas Channel in high summer choose to capture the brilliant colours of ocean, forest and mountain, as I have on several assignments.

For this gallery, I have chosen to use black and white to show the stark beauty of the mountains, the often menacing seas and the clouds, ever changing, as the westerly winds from the Pacific drive those clouds against the mountains.

Images from this gallery are available for purchase for personal, editorial and commercial  use on Photoshelter. Simply click on the image above.

US calls for study that could relax double-hulled oil tanker regulations, citing costs to build, energy consumption

The United States Department of Transportation Maritime Administration has issued a call for a study that is calling into question the future of double-hulled oil tankers.

On August 6, 2012 the Maritime Administration, also known as MARAD, issued a “solicitation” for a study on the Safety, Economic and, Environmental Issues of Double Hulls.

In the call for the study, MARAD says:

Following the Exxon Valdez disaster, the passing of the Oil Pollution Act of 1990 (OPA 90) led to the requirement to replace single hull petroleum tankers with double hull tank vessels sailing in U.S. waters. This requirement was soon adopted by the International Maritime Organization (IMO) and became a worldwide regulation. This means that, today, tank vessels worldwide are carrying thousands of extra tons of steel in order to meet the double hull requirements.

Though these double hulls reduce the threat of oil pollution as a result of grounding, they significantly increase the amount of energy needed to propel a vessel and increase the amount of air pollution into the atmosphere. As a result, the maritime industry’s carbon footprint and criteria pollutant emissions are increased.
In addition to the need to burn more fuel, it is acknowledged that double hulls can cause several other problems which will be detailed in this study.

Here in Canada, Enbridge Northern Gateway and its supporters, in briefings on maritime and tanker safety on the west coast of British Columbia, have always said that the changes following the Exxon Valdez disaster in Prince William Sound and the subsequent US Oil Pollution Act as almost guaranteeing that such a disaster could not happen again.

Now it appears that some people in the U.S. Department of Transportation may be worried that increased use of double-hulled tankers will cost too much. There’s also the apparent question of balancing the carbon footprint of increased emissions from tankers with the danger from a hydrocarbon spill.

The request for the study was covered by tanker industry sites such as Marine Link but only surfaced in major media on Sunday, when The National, an English-language newspaper in Abu Dhabi broke the story, “US maritime agency considers overhaul of oil-spill regulation”

Reporter David Black notes:

In July last year, the IMO adopted binding regulations to limit the expected gas emissions increase by reducing fuel consumption of ships by as much as 15 million tonnes in 2020, a 14 per cent reduction, and by 2050, by as much as 1,013 million tonnes. This will lead to savings in fuel costs for the shipping industry of up to US$200 billion a year, says the IMO.

Black says that the US agency seems “to suggest by abandoning the additional weight of double hulls the savings would increase and pollution be cut further, adding “On the other hand, since the introduction of double hulls, pollution from major oil spills has been reduced to practically zero.”

The National story says even the tanker industry itself is worried about the move, quoting the the international tanker owners’ organization.

“We have noted reports about Marad’s intended study on tanker double hulls but, except for what we gather from press articles, we have little knowledge on the reasoning behind this,” said Bill Box, Intertanko’s senior manager for external relations.
“From our members’ experience, double-hull designs have evolved into safe and reliable ships with an excellent safety and pollution prevention record. We might provide comments when such a study would be released by Marad.”

 

The requirements for the double-hull study, as posted by the US government are:

1. The Contractor shall conduct an assessment of the history in the evolvement of “The Double Hull Rules”.

2. The Contractor shall conduct the assessment of any rules that are being proposed in bodies such as the IMO, U.S. Congress and other such bodies’ worldwide as they relate to additional hulls for environmental reasons.

3. The Contractor shall assess all the relevant safety issues related to double hulls for each class of vessel. E.g. Double bottoms are difficult and expensive to maintain and can result in corrosion problems. Unchecked corrosion in older double hull vessels can lead to cargo leakage into a double bottom and the buildup of dangerous vapor which could cause an explosion under certain conditions. The Contractor will obtain data from appropriate organizations which details the issues in double bottoms on older vessels including cracking, leakage, and the potential for vapor buildup.

4. The contractor shall conduct a complete economic study of the consequences of Double Hulls. E.g. they significantly add to the construction cost of vessels. They result in the loss of cargo space which also adds to the carbon footprint since an additional vessel(s) is needed to carry the same cargo tonnage.

5. The contractor shall assess the complete consequences of the carbon footprint of designing, constructing, maintaining and operating vessels with double hulls. E.g. Apart from the extra propulsive forces and fuel needed, the carbon footprint of double hull maintenance is substantially increased.

6. The Contractor shall prepare a report on the results of the project. The report shall be grammatically correct and must be professionally written to a high level of competence in the English language. The report must clearly specify the safety, economic and environmental issues details above.

 

Romney endorses Harper’s environmental fast track policy–if oil goes to the United States

Mitt Romney, the Republican candidate for president of the United States today issued his “white paper” on energy policy. It calls for an integrated energy market with Canada, the United States and Mexico. Romney also endorses Prime Minister Stephen Harper’s environmental fast track “one project one review” policy.

The PDF version of The Romney Plan for a Stronger Middle Class Energy Independence is posted on his campaign site.

In the Executive Summary Romney says:

A crucial component of Mitt Romney’s Plan for a Stronger Middle Class is to dramatically increase domestic energy production and partner closely with Canada and Mexico to achieve North American energy independence by 2020. While resident Obama has described his own energy policy as a “hodgepodge,” sent billions of taxpayer dollars to green energy projects run by political cronies, rejected the Keystone XL Pipeline as not in “the national interest,” and sought repeatedly to stall development of America’s domestic resources, Romney’s path forward would establish America as an energy superpower in the 21st century.

It’s key recommendations are:

• Approve the Keystone XL pipeline;

• Establish a regional agreement to facilitate cross-border energy investment,
infrastructure, and sales;

• Promote and expand regulatory cooperation between governments to encourage
responsible energy production, including the creation of a forum for sharing best
practices and technologies; and

• Institute fast-track regulatory approval processes for cross-border pipelines and other infrastructure.

While the white paper is supposed to be the foundation of Republican energy policy, it is itself a “hodgepdge,” mostly a cut and paste job of various reports in the US and Canadian media. While the paper does cite those many sources, it is the kind of compiliation that would get a university freshman a fail, for lack of original content. It also get the name of Canada’s finance minister wrong in one reference, calling him correctly Jim Flaherty in the headline but “Jay Flaherty” in the story credit.

Romney’s paper also seems to be worried that the fact from the prime minister, many economists and policy analysts are saying that it is imperative that Canada diversify its market away from the United States.

Some key highlights of Romney’s white paper of quotes includes:

Obama’s Rejection Of Keystone Will Force Canada To Ship Its Vast Supplies Of Oil To China. “Ronald Liepert, the energy minister in Alberta, said that while Canada would prefer to sell its oil to the United States, ‘this commodity will go someplace.’ In particular, he said, China is already a major consumer of other Canadian natural resources and a small investor in the oil sands. ‘I can predict confidently that at some point China will take every drop of oil Canada can produce.’” (Ian Austen, “Oil Sands Project in Canada Will Go On If Pipeline Is Blocked,” The New York Times, 6/6/11)

Romney then quotes SunMedia:

Canadian PM Harper: “Look, the very fact that a ‘no’ could even be said underscores to our country that we must diversify our energy export markets…We cannot be, as a country, in a situation where our one and, in many cases, only energy partner could say no to our energy products. We just cannot be in that position.” (Bryn Weese, “Harper Determined To Get Canadian Oil To Asia,” Sun News, 4/3/12)

So while Romney wants to approve the Keystone XL pipeline, there is no mention of the Northern Gateway project, but it is clear they don’t want bitumen oil going outside of the continent.

However, the Republicans seem to like quoting Harper’s fast track approach which has caused an uproar here in Canada, quoting the Wall Street Journal:

Compare The Canadian Approach: “One Project, One Review.” “The budget also treats Canada’s energy resources as national assets to be exploited—with as few delays as possible. Thus the budget proposes to eliminate overlapping federal and provincial environmental reviews for major projects. It proposes firm review timelines, including for projects that are already underway, such as the Northern Gateway pipeline from northern Alberta to the Pacific coast. Mr. Flaherty’s catch phrase is ‘one project, one review.’” (Editorial, “Canada Beats America,” The Wall Street Journal, 4/3/12)

and also appearing to endorse downloading to the provinces (or in the case of the US, the states), while warning Americans about Finance Minister Jim Flaherty’s statement in the Commons about diversifying Canada’s markets.

Compare The Canadian Approach: “Respect Provincial Jurisdiction … Streamline The
Review Process.” CANADIAN FINANCE MINISTER JIM FLAHERTY: “Canada’s resource industries offer huge potential to create even more jobs and growth, now and over the next generation. This potential exists in every region of the country–natural gas in British Columbia, oil and minerals on the Prairies, the Ring of Fire in Ontario, Plan Nord in Quebec, hydro power in Atlantic Canada, and mining in Canada’s North. Recently it has become clear that we must develop new export markets for
Canada’s energy and natural resources, to reduce our dependence on markets in the United States.
The booming economies of the Asia- Pacific region are a huge and increasing source of demand, but Canada is not the only country to which they can turn. If we fail to act now, this historic window of opportunity will close. We will implement responsible resource development and smart regulation for major economic projects, respecting provincial jurisdiction and maintaining the highest standards of environmental protection. We will streamline the review process for such projects, according to the following principle: one project, one review, completed in a clearly defined time period. We will ensure that Canada has the infrastructure we need to move our exports to new markets.” (Canadian Finance Minister Jay Flaherty, The House Of Commons, Remarks, 3/29/12)

One has to wonder if Mitt Romney’s other policies are also cut and paste jobs and, if elected, how often he will be calling Stephen Harper for advice.

Harper government reserves Gateway environmental decision for the cabinet, sets Dec. 31, 2013 deadline for JRP

The future of the Northern Gateway project is now completely in the hands of Prime Minister Stephen Harper’s cabinet.

Today, Friday, August 3, 2012, Environment Minister Peter Kent used the provisions of what the Harper government calls the Jobs, Growth and Long Term Prosperity Act (former Bill C-38) to set a final deadline for a report from the Northern Gateway Joint Review Panel  on December 31, 2013 and reserve the final environmental decision for the Governor-in-Council.

Today’s move, in effect, is the final gutting of the Joint Review Process, making it irrelevant, since, as long suspected, the government will now make the decision on its own.

The Joint Review Panel no longer has the power to reject the Northern Gateway on environmental grounds, that is now solely up to the Harper cabinet. Once the Gateway project is approved, as expected, the NEB has been ordered to issue the approval certificate within seven days.

By releasing the news on a Friday afternoon before a holiday weekend, the Harper government spin doctors through Environment Minister Peter Kent have also pulled the classic government move of releasing bad news when it will least be noticed.

There is also the new agreement between the Ministry of Environment and the National Energy Board. The revised memorandum of agreement says:

The Governor in Council will make the decision on the environmental assessment (whether the project is likely to cause significant adverse environmental effects and if, so whether such effects are justified in the circumstances). The Governor in Council will decide, by order, whether the board should issue a certificate and will give reasons for the order.

Under the act, the NEB now has to file its environmental assessments within 543 days of the act coming into force, hence the imposed deadline.

If there are no excluded periods this would mean that the environmental assessment and report must be submitted no later than Dec. 31, 2013.

The final paragraph of Kent’s letter also says

If the Project is approved by the Governor in Council, the NEB will issue the certificate of public convenience and necessity within seven days of the Governor in Council’s order.

That’s a clear indication that the Harper government still intends at this point to fast track the Northern Gateway project.

Apart from giving the most environment unfriendly cabinet in Canadian history the decision power, most of the memorandum of agreement are legalistic changes necessary to bring the former agreement into compliance with the new law.

The environmental sections of the agreement, based on the amendments to the Environmental Assessment act have a couple of interesting points

any change that the project may cause in the environment, including any change it may cause in listed wildlife species as critical habitat or residences of that species….

Although the memo goes on to say

any change to the project that may be caused by the environment whether such change or effect occurs within or outside Canada

While this may be simply legalistic language, given the overall tone of the Harper government’s policy, especially the changes in the Fisheries Act that only protects fish habitat when it affects  commercial species, one has to wonder if the emphasis on listed (that is threatened or endangered) species is again a narrowing of the criterion for approving the pipeline.

The second phrase is also ambiguous, seemingly to imply that the environment could be to blame  for any problems the project may face. Opponents have long pointed out that the environmental conditions and risks such as geologic instability along the pipeline route and the heavy weather in the waters off British Columbia are factors that increase the danger of an oil spill event whether on land or sea. However, the new agreement  presents an almost Orwellian scenario that would blame the environment, an “Act of God” in insurance terms, rather than the company or the government for any future disaster.

The main phrase in the agreement “whether such effects are justified in the circumstances” clearly indicates that the Harper government is fully prepared to ignore the environmental fallout of the Northern Gateway project and so the stage is set for a much wider political battle.

Peter Kent letter to JRP concerning the Northern Gateway Pipeline Project  (pdf)

Amendment to the Agreement concerning the Joint Review of the Northern Gateway Pipeline Project  (pdf)

 

 

 

Rolling Stone discovers Northern Gateway controversy, but gets lost on the way to Kitimat

Rolling Stone article on Canadian pipelines
A screen grab of the Rolling Stone article on the Canadian Northern Gateway and Keystone pipelines.

It’s every muscian’s dream to make it On the Cover of the Rolling Stone. (And when Rolling Stone does investigative journalism, every politician’s nightmare).

Now the venerable, storied music mag has discovered the Northern Gateway pipeline, running a story on August 2 on its website and slated to appear in the next dead tree issue on August 16.

The article by Jeff Goodell is a sort of a primer for hip but not yet clued in Americans on the controversies over Canadian pipelines. It features the usual nasty depiction of the bitumen sands with a file photo from the Washington Post via Getty.

But does Kitimat rate a mention in the magazine that has celebrated the Beatles, the Beach Boys, the (original and real) Rolling Stones, Bob Dylan, the Police, Nirvana, Justin Bieber and The Sheepdogs?

Nope.  Imagine that, an entire article on the Northern Gateway Pipeline and not one mention of Kitimat. Instead Goddell says:

Canada is pushing for a new route called the Northern Gateway, which would cut through three major watersheds in western Canada and turn the fragile coast of British Columbia into a bustling tanker port.

 

In one way Kitimat is in good company, for when the band that originated the “Cover” song, Dr. Hook & the Medicine Show, did make Rolling Stone, the magazine cover had “What’s-Their-Names Make the Cover.”

It’s one thing not to get any respect for Kitimat from the Alberta media, but at least Albertans spell Kitimat right (most of the time–although sometimes they get Kitamaat Village wrong). Here in the northwest we’re used to being dissed by Albertans.

Of course, while the entire coast is endangered by increased traffic in supertankers, it’s Kitimat that is the perhaps maybe, perhaps sometime, perhaps inevitable, perhaps never “bustling tanker port.”

So what could Kitimat do  to make it up from being ignored on the back pages of Rolling Stone to make it to the famous and proverbial cover?

My first idea was a vision of the District of Kitimat Council forming themselves into a rock band.

Joanne and the……  you can come up with an idea for a name, but I am not sure that would work.

Or maybe if we had a Justin Bieber concert at Riverlodge? That might keep young people from leaving Kitimat at least for a while.

Seriously. We’ve been ignored by Rolling Stone up until now. Now we’re that close to being   equal to What’s-Their-Names.

Maybe Kitimat can change that.

So now the people of Kitimat have a new challenge, beyond dealing with Enbridge, the JRP, the province and the feds,  beyond spending those long months clearing snow and those brief summer days of fishing, and that challenge is: get Kitimat on the cover of the Rolling Stone.

 

Gateway JRP denies request from Nathan Cullen to hold hearings in Kitimat

The Northern Gateway Joint Review Panel today denied a request from Skeena Bulkley Valley MP to reconsider its decision not to hold the questioning round of final hearings in Kitimat. The JRP is still reserving its decision on locations for final arguments.

The panel had previously decided to hold those hearings in Prince Rupert, Prince George and Edmonton.

In its ruling on Cullen’s request, the JRP said:

Your request for the Panel to reconsider its decision on the locations for the questioning phase of the final hearings did not contain any new information that was not considered by the Panel in its original determination. As such, your request is denied. The Panel further notes that no decision has been made with respect to the location for the final hearings for final argument. As indicated in Procedural Direction #8, these locations will be announced at a later date.

 

Cullen had also asked to be allowed to question government participants in the hearing.  That request was also denied because filed the request after the deadline. Cullen also plans to question Northern Gateway witnesses and so the JRP reminded him that:

In accordance with the Panel’s letter of 25 July 2012, you are reminded that the names of the witnesses or witness panels you intend to question and an estimate of how much time you will need to question each party or witness panel is to be submitted by 3 August 2012.

NEB conducting safety audit of Enbridge

The National Energy Board is following up a highly critical report by the US National Transportation Safety Board on the Marshall, Michigan spill by conducting an overall safety audit of Enbridge pipeline management and practices.  The NEB says the review began even before the NTSB report was released:

even prior to the release of the final report, we have been reviewing Enbridge’s management practices. In the next weeks and months, we will be conducting safety audits to review and confirm that improvements, particularly to their control room practices in Edmonton, are satisfactory.

In a letter to the public from NEB chair, Gaétan Caron, posted on the NEB website, the agency says: “Pipeline safety is and always has been of paramount concern to the National Energy Board and we recognize it is of growing concern to Canadians.”

The letter goes on to say:

Given recent events, it is important that Canadians understand how we hold companies accountable for public safety and protection of the environment and take swift and appropriate action when they do not.

The Board takes a proactive approach to preventing spills and releases, with the ultimate goal of seeing none at all. We require pipeline companies to anticipate, prevent, manage and mitigate potentially dangerous conditions associated with their pipelines.

To do this, we conduct compliance verification activities which include things such as inspections, compliance meetings, emergency exercises, audits and investigations on a regular basis with all companies we regulate. In the specific case of Enbridge, in recent years the NEB has conducted approximately 25 compliance verification activities per year, focusing on every aspect of their management system. In addition, the NEB imposed two precautionary pressure restrictions on Enbridge pipelines, one in 2010 and another in 2011, which remain in effect.

When the NEB identifies deficiencies in a company’s systems, projects or programs, we require the company to immediately implement changes to correct those deficiencies or to develop a corrective action plan for NEB approval. It is important to note that we aim to prevent incidents from occurring in the first place and we will take all available actions at our disposal to protect the environment and the public. The NEB may revoke authorizations, impose safety orders that restrict operations, issue stop-work orders and monetary penalties as well as pursue criminal prosecution.

The NEB has also reviewed the synopsis of the National Transportation Safety Board’s report on Enbridge’s Line 6B rupture in Michigan in 2010 to see what we can learn in the interests of public safety and environmental protection. A thorough review of the final report will be conducted in order to identify all lessons that may be applied to pipelines and companies under the Board’s jurisdiction, however even prior to the release of the final report, we have been reviewing Enbridge’s management practices. In the next weeks and months, we will be conducting safety audits to review and confirm that improvements, particularly to their control room practices in Edmonton, are satisfactory.

The NEB goes on to stay that Jobs, Growth and Long-term Prosperity Act (formerly Bill C-38) is giving the agency more bight:

 the Government of Canada will be adding another tool to our compliance and enforcement toolkit: administrative monetary penalties (AMPs). The new AMP sections in the NEB Act set out the maximum daily penalties for both individuals and companies. For individuals the maximum daily penalty is $25,000 for each violation and for companies the maximum daily penalty is $100,000 per violation.

The Act stipulates that each day a violation continues is considered to be a separate violation. This means that separate penalties could be issued per infraction, per day with no maximum total financial penalty.

Some of the details of the AMPs design are described in the government amendments to the NEB Act, but other details, such as what activities will be considered violations, will be written in a new regulation. We have committed to have these new regulations ready to use by July 6, 2013.

The NEB says it will continue to make public any enforcement measures it takes.

As a part of our Action Plan on Safety and Environmental Protection, we began posting all documents related to Board-initiated safety and environmental compliance actions to our website in fall of 2011.

The Board is committed to continually improving the way we do business and we welcome any opportunity that allows us to do so in the interests of pipeline safety and environmental protection.

Enbridge has not yet responded to the NEB release.

Haisla ask Gateway JRP to force Enbridge to release more Kalamazoo spill information

The Haisla Nation have asked the Northern Gateway Joint Review panel to force Enbridge to reveal more information about the pipeline rupture and oil spill near Kalamazoo, Michigan, in July 2010. The Haisla are also asking for more and better information about the $500 million project upgrades that Enbridge announced last month.

In a notice of motion filed July 30, with the JRP, lawyers representing the Haisla Nation note that they had previously asked Enbridge “a number of questions relating to Enbridge’s spill of 3,785,000 litres of diluted bitumen into the Kalamazoo River at Marshall, Michigan (the ‘Kalamazoo Spill’).”

The notice then notes that “Northern Gateway refused to reply as the matter was under investigation by the United States National Transportation Safety Board… The NTSB’s Accident Report was adopted on July 10, 2012 and has now been released to the public. The basis for Northern Gateway’s refusal to answer the Haisla Nation’s information requests is, therefore, no longer present.”

The Haisla are asking the JRP

that Northern Gateway is required to file evidence relating to the Kalamazoo Spill
which identifies the cause of the pipeline rupture and the extent to which
Enbridge’s pipeline maintenance, monitoring and response approach caused and
contributed to the volume of the spill by a date to be fixed by the Panel;

As for the upgrades, the Haisla notice of motion notes

Northern Gateway has identified additional design features, which it states will “enhance the safety and reliability of the pipelines over and above standard industry practice”. The design features identified in the Reply Evidence include increased wall thickness of the pipeline, additional increases in pipe thickness for crossings at major tributaries to the Fraser, Skeena and Kitimat River, the placement of remotely operated isolation valves on each side of major tributaries of the Fraser,Skeena and Kitimat Rivers, and dual remote monitoring systems ….
Northern Gateway has not provided any details relating to these proposed design
features. Their relevance and suitability to enhancing safety and reliability of the
pipelines cannot, therefore, be assessed.

The motion asks

that Northern Gateway is required to provide details of its proposed additional
design features for thicker pipes for the pipeline generally and at identified
watercourse crossings, for additional valve placements, and for additional remote
monitoring, as well as all studies and reports that support how these additional
design features enhance pipeline safety, by a date to be fixed by the Panel.

The Haisla motion also asks for more details on various environmental and other questions.

The Joint Review Panel has not yet ruled on the Haisla motion.

Haisla Nation Notice of Motion  (pdf)