Kitimat votes: Ross calls Gateway plebsicite “late in the day” and “slap in the face”

Haisla Nation chief counsellor Ellis Ross has written a letter to Kitimat media sharply critizing the upcoming plebiscite on the Enbridge Northern Gateway project

Enbridge trying to buy Social Licence

This late in the day, a poll of its residents has no binding effect on the project. Next week, the District of Kitimat will seek the views of its residents on Enbridge’s Northern Gateway Pipeline Project. But to what end? If anything, it will lead to further uncertainty.

Deciding to hold a referendum at this late date is a slap in the face to all the work done by the Haisla Nation on this project. The Haisla Nation dedicated time and money toward testing Northern Gateway’s evidence and claims about safety and environmental protection, while the District stood by and did nothing.

The review process for this project has already left town, with the District taking no position on the project. Still undecided on what its views are on the project, the District now proposes to conduct a poll, instead of examining the facts in the JRP process. A poll to vote on a JRP report that we view as wrong to begin with including the flawed process itself!

Ellis Ross
Haisla Chief Counsellor Ellis Ross (Robin Rowland/Northwest Coast Energy News)
Based on our participation, the Haisla Nation has determined the risks associated with Northern Gateway’s transport of diluted bitumen and condensate clearly outweighs any potential benefits. This is an informed conclusion, made after reviewing Northern Gateway’s application and evidence, and participating extensively in the Joint Review Panel process.

The Haisla Nation is doing what it can to protect what is left of its Territory. The Joint Review Panel Report has failed to properly address the concerns associated with the project, which is why the Haisla Nation has asked the Federal Court of Appeal to review the JRP’s Report. And the Haisla Nation is not alone in its challenge of the Report. Two other First Nations – Gitga’at and Git’xaala – and two environmental organizations have also challenged the Report.

Enbridge Northern Gateway is desperate for public support. That is why it is conducting a media and canvassing blitz in the District to sway voters. Will the District of Kitimat be able to form a position based on the outcome of such a plebiscite, which would have been bought by oil money, instead of based on participating in a fact finding process like the JRP? What is a yes vote that has been bought by Enbridge’s vast advertising machine worth? Does a purchased social licence hold any value at all? If it does have a price tag, it doesn’t come close to the value that the Haisla people place on what is left of Haisla Territory; especially if you look at what has happened in the Gulf of Mexico, at Kalamazoo and the effects lasting even to today in Prince William Sound (Exxon Valdez).

The Haisla Nation will not be swayed by a yes vote in the District of Kitimat plebiscite. If anything, our membership is angry that it is even happening at all. This project is wrong for the Haisla Nation and it is wrong for the Territory that Haisla’s and non Haisla’s call home. We have a choice. We have more than enough projects to sustain the region and we are already seeing the results.

There is also some controversy in Kitimat whether or not members of the Haisla Nation should be able to vote in the April 12 plebiscite. District officials noted that its has jurisdiction only within District boundaries. That means that members of the Haisla Nation who live within the boundaries of the District can vote, while Haisla who live in Kitamaat Village, which is a federally designated Indian Reserve cannot.

Earlier in the week, Ross was equally blunt in a Facebook posting aimed at the Haisla Nation where he said:

The Kitimat Council’s ‘vote’ is an insult to Haisla given the amount of time, effort and money we’ve spent since 09 and they come in at the last minute to cheer lead for Enbridge but he vote wont mean anything regardless of the outcome.

District of Kitimat can’t make this project happen even if its a yes vote. We will make our position known to both this vote and our reaffirmation of this project and its impacts to our rights and title.
Haisla members: remember what we’ve been saying about this in our membership meetings since 09.

On Monday, in an Op Ed in the Vancouver Sun, Clarence Innis, acting chief of the Gitxaala Nation, wrote, in part:

We, the Gitxaala Nation, are vehemently opposed to Enbridge’s proposed Northern Gateway pipeline project because of the disastrous effects the shipment of heavy oil through our territory would have on our traditional way of life, economy, spirituality, and governance system….
What’s especially concerning is that our people have not been properly consulted about the impacts of the Northern Gateway Project, despite openly participating and co‑operating with the federal joint review panel process. We went out of our way to participate in Canada’s regulatory system, yet our rights have been completely ignored.

Kitimat Votes: 25th anniversary of Exxon Valdez disaster looms over Northern Gateway plebiscite

On March 24, 1989, the tanker Exxon Valdez plowed into Bligh Reef in Alaska’s Prince William Sound,  spilling 260,000 to 750,000 barrels or 41,000 to 119,000 cubic metres of crude oil.

That was 25 years ago. The media loves anniversary stories and the Exxon Valdez look-backs and updates are already ramping up—right in the middle of the Kitimat plebiscite on the Northern Gateway pipeline and terminal project.

The hashtag #ExxonValdez25 is beginning to trend, based on a Twitter chat for Monday sponsored by the US National Oceanic and Atmospheric Administration.

The voters of Kitimat who will have to cast their ballots on the Joint Review Panel’s interpretation of the Northern Gateway proposal will find once again that the JRP tilted toward the industry and downplayed the lingering risks from a major tanker disaster—and that means neither the pro nor the anti side can be happy with the events that will be marked on March 24, 2014.

The Exxon Valdez accident is part of the Joint Review Panel findings that the economic benefits of Northern Gateway outweigh the risks. The JRP generally accepted the industry position, taken by both Northern Gateway and by ExxonMobil that Prince William Sound has recovered from the Exxon Valdez incident, something that is fiercely debated and disputed.

One area that is not in dispute is that the Exxon Valez disaster brought laws that forced energy companies to use double-hulled tankers.  However, commercials that indicate that Northern Gateway will be using double-hulled tankers because the company respects the BC coast is pushing things a bit far, since those tankers are required by law.

Northern Gateway told the Joint Reivew Panel that

on a worldwide basis, all data sets show a steady reduction in the number
and size of oil spills since the 1970s. This decline has been even more apparent since regulatory changes in 1990 following the Exxon Valdez oil spill, which required a phase-in of double-hulled tankers in the international fleet. No double-hulled tanker has sunk since 1990. There have been five incidents of double-hulled tankers that have had a collision or grounding that penetrated the cargo tanks. Resulting spills ranged from 700 to 2500 tonnes

The Haisla countered by saying:

The Haisla Nation said that, although there have been no major spills since the Exxon Valdez spill in Prince William Sound, there were 111 reported incidents involving tanker traffic in Prince William Sound between 1997 and 2007. The three most common types of incidents were equipment malfunctions, problems with propulsion, steering, or engine function, and very small spills from tankers at berth at the marine terminal. The Haisla Nation said that, in the absence of state-of-the-art prevention systems in Prince William Sound, any one of those incidents could have resulted in major vessel casualties or oil spills.

 

Related: What the Joint Review Panel said about the Exxon Valdez disaster

A local daily newspaper, The Anchorage Daily News sums it all up:

The herring of Prince William Sound still have not recovered. Neither have killer whales, and legal issues remain unresolved a quarter of a century later. Monday is the 25th anniversary of the disaster, in which the tanker Exxon Valdez ran aground on Bligh Reef and spilled at least 11 million gallons of oil into the pristine waters of the sound.

Prince William Sound today looks spectacular, a stunning landscape of mountainous fjords, blue-green waters and thickly forested islands. Pick up a stone on a rocky beach, maybe dig a little, though, and it is possible to still find pockets of oil.

“I think the big surprise for all of us who have worked on this thing for the last 25 years has been the continued presence of relatively fresh oil,” said Gary Shigenaka, a marine biologist for the National Oceanic and Atmospheric Administration.

Britain’s Sunday Telegraph headlined: Exxon Valdez – 25 years after the Alaska oil spill, the court battle continues

The legal dispute over the spill is still ongoing, with the Telegraph’s Joanna Walters noting:

[S]tate senator Berta Gardner is pushing for Alaskan politicians to demand that the US government forces ExxonMobil Corporation to pay up a final $92 million (£57 million), in what has become the longest-running environmental court case in history. The money would primarily be spent on addressing the crippled herring numbers and the oiled beaches.
“There’s still damage from the spill. The oil on the beaches is toxic and hurting wildlife. We can’t just say we’ve done what we can and it’s all over – especially with drilling anticipated offshore in the Arctic Ocean – this is significant for Alaska and people around the world,” she told The Telegraph.

An ExxonMobil spokesman then told The Telegraph, the energy sector’s standard response:

Richard Keil, a senior media relations adviser at ExxonMobil, said: “The overwhelming consensus of peer-reviewed scientific papers is that Prince William Sound has recovered and the ecosystem is healthy and thriving.”
But federal scientists estimate that between 16,000 and 21,000 gallons of oil from the spill lingers on beaches in Prince William Sound and up to 450 miles away, some of it no more biodegraded than it was at the time of the disaster.

The Sunday Telegraph chronicles which species have recovered in Exxon Valdez: Animal populations in Prince William Sound, Alaska

Overall, the Exxon Valdez disaster was, as US National Public Radio reported, a spur to science. But NPR’s conclusion is the exact opposite of that from the Northern Gateway Joint Review Panel—at least when it comes to fish embryos.

Why The Exxon Valdez Spill Was A Eureka Moment For Science

Twenty-five years of research following the Exxon Valdez disaster has led to some startling conclusions about the persistent effects of spilled oil.
When the tanker leaked millions of gallons of the Alaskan coast, scientists predicted major environmental damage, but they expected those effects to be short lived. Instead, they’ve stretched out for many years.
What researchers learned as they puzzled through the reasons for the delayed recovery fundamentally changed the way scientists view oil spills. One of their most surprising discoveries was that long-lasting components of oil thought to be benign turned out to cause chronic damage to fish hearts when fish were exposed to tiny concentrations of the compounds as embryos.

(NPR also reports on the The Lingering Legacy Of The Exxon Valdez Oil Spill)

It seems that some species recovered better than others from the oilspill.

For example, the recovery of the sea otter population has received widespread media coverage, but with widely divergent points of view. The more conservative and pro-industry writers point to the recovery of the otter population, while environmental coverage stresses the quarter century it took for the otter population to rebound.

Scientific American online and other media outlets reported 25 Years after Exxon Valdez Spill, Sea Otters Recovered in Alaska’s Prince William Sound quoting a report from the U.S. Geological Survey that said that spill killed 40 percent of the 6,500 sea otters living in the sound and more in 1990 and 1991.USGS reported that the main sea otter population in the sound was 4,277 in 2013.

Although recovery timelines varied widely among species, our work shows that recovery of species vulnerable to long-term effects of oil spills can take decades,” said lead author of the study, Brenda Ballachey, research biologist with the U.S. Geological Survey. “For sea otters, we began to see signs of recovery in the years leading up to 2009, two decades after the spill, and the most recent results from 2011 to 2013 are consistent with recovery

The Joint Review Panel generally accepted Northern Gateway’s and the energy industry’s evidence on the Exxon Valdez incident and concluded

The Panel’s finding regarding ecosystem recovery following a large spill is based on extensive scientific evidence filed by many parties, including information on recovery of the environment from large past spill events such as the Exxon Valdez oil spill. The Panel notes that different parties sometimes referred to the same studies on environmental recovery after oil spills, and drew different conclusions.

In its consideration of natural recovery of the environment, the Panel focused on effects that are more readily measurable such as population level impacts, harvest levels, or established environmental quality criteria such as water and sediment quality criteria.

The Panel finds that the evidence indicates that ecosystems will recover over time after a spill and that the post-spill ecosystem will share functional attributes of the pre-spill one. Postspill ecosystems may not be identical to pre-spill ecosystems. Certain ecosystem components may continue to show effects, and residual oil may remain in some locations. In certain unlikely circumstances, the Panel finds that a localized population or species could potentially be permanently affected by an oil spill.

Scientific studies after the Exxon Valdez spill indicated that the vast majority of species recovered following the spill and that functioning ecosystems, similar to those existing pre-spill, were established.
Species for which recovery is not fully apparent, such as Pacific herring, killer whales, and pigeon guillemots, appear to have been affected by other environmental factors or human influences not associated with the oil spill. Insufficient pre-spill baseline data on these species contributed to difficulties in determining the extent of spill effects.

Based on the evidence, the Panel finds that natural recovery of the aquatic environment after an oil spill is likely to be the primary recovery mechanism, particularly for marine spills. Both freshwater and marine ecosystem recovery is further mitigated where cleanup is possible, effective, and beneficial to the environment.

Natural processes that degrade oil would begin immediately following a spill. Although residual oil could remain buried in sediments for years, the Panel finds that toxicity associated with that oil would decline over time and would not cause widespread, long-term impacts.

The Panel finds that Northern Gateway’s commitment to use human interventions, including available spill response technologies, would mitigate spill impacts to ecosystems and assist in species recovery..

It is clear, however, from the local coverage in Alaska and from the attention of the world’s media that Prince William Sound has not fully recovered from the Exxon Valdez incident (it may yet in who knows how many years). Anger and bitterness still remains among the residents of Alaska, especially since the court cases are dragging on after a quarter century.

Those are the kinds of issues that Kitimat residents will face when they vote in the plebiscite on April 12. Just who do the people of Kitimat believe, those who say the chances for a spill are remote and the environment and the economy will quickly recover? It probably depends on whether or not you consider 25 years quick. Twenty-five years is quick in geological time but it is a third or a half of a human life time.

As for the residents of Kitamaat Village, and probably many people in Kitimat, Haisla Chief Counsellor Ellis Ross summed it up in a Facebook posting on Sunday

If this happens in Kitamaat, all those campaigning for Enbridge will pack up and leave for another coastline to foul. Haisla don’t have much of a choice. We would have to stay and watch the court battles on who should pay what.

Ross is right. Whether it’s Prince William Sound or Douglas Channel, the people who live the region are stuck with the mess while the big companies walk away and the lawyers get rich.

 

Anniversary stories (as of March 23, 2000 PT)

Alaska Media

Valdez Star
First Associated Press story on Exxon Valdez Oil Spill reprinted

KTUU

Exxon Valdez Oil Spill 25th Anniversary: Alaskans Remember

Alaska Dispatch

Exxon Valdez oil lingers on Prince William Sound beaches; experts debate whether to clean it up

While Alaska’s Prince William Sound is safer, questions linger about preventing oil spills

Recalling the shock and sadness of Exxon Valdez spill 25 years ago

How the Exxon Valdez spill gave birth to modern oil spill prevention plans

Seward City News
25 years later Exxon Valdez memories still stink

Bristol Bay Times
Exxon lesson: Prevention, RCACs the key to avoiding future disaster

Anchorage Daily News
Red Light to Starboard: Recalling the Exxon Valdez Disaster

Exxon Valdez photogallery

25 years later, oil spilled from Exxon Valdez still clings to lives, Alaska habitat

 

World Media
Al Jazeera
The legacy of Exxon Valdez spill
The tanker ran aground 25 years, but the accident continues to harm the environment and human health

Vancouver Sun
Opinion: Oil spills — the 10 lessons we must learn Reality check: Next incident would ruin coastal economy

Seattle Times

Promises broken by the Exxon Valdez oil spill, 25 years later

SFGate

25 years since the Exxon Valdez spill

CNN
After 25 years, Exxon Valdez oil spill hasn’t ended

Kitmat Votes: What the Joint Review Panel said about the Exxon Valdez disaster

Excerpts from the Northern Gateway Joint Review Panel report relating to the Exxon Valdez disaster.

Northern Gateway told the Joint Reivew Panel that

on a worldwide basis, all data sets show a steady reduction in the number
and size of oil spills since the 1970s. This decline has been even more apparent since regulatory changes in 1990 following the Exxon Valdez oil spill, which required a phase-in of double-hulled tankers in the international fleet. No double-hulled tanker has sunk since 1990. There have been five incidents of double-hulled tankers that have had a collision or grounding that penetrated the cargo tanks. Resulting spills ranged from 700 to 2500 tonnes

The Haisla countered by saying:

The Haisla Nation said that, although there have been no major spills since the Exxon Valdez spill in Prince William Sound, there were 111 reported incidents involving tanker traffic in Prince William Sound between 1997 and 2007. The three most common types of incidents were equipment malfunctions, problems with propulsion, steering, or engine function, and very small spills from tankers at berth at the marine terminal. The Haisla Nation said that, in the absence of state-of-the-art
prevention systems in Prince William Sound, any one of those incidents could have resulted in major vessel casualties or oil spills.

There were disputes about how the Exxon Valdez affected species in the Prince William  Sound area:

Northern Gateway said that, although crabs are known to be sensitive to toxic effects, they have been shown to recover within 1 to 2 years following
a spill such as the Exxon Valdez incident. Northern Gateway said that Dungeness crab was a key indicator species in its assessment of spill effects.

Northern Gateway said that potential effects to razor clams are not as well studied. It said that sediment toxicity studies after the Exxon Valdez spill did not suggest significant effects on benthic invertebrates. Following the Exxon Valdez and
Selendang Ayu oil spills in Alaska, food safety closures for species such as mussels, urchins, and crabs were lifted within 1 to 2 years following the
spill.

In response to questioning from the Council of the Haida Nation regarding potential spill effects on herring, Northern Gateway said that herring were a key indicator species in its spill assessment.
Northern Gateway said that the Exxon Valdez spill did not appear to cause population-level effects on Prince William Sound herring.

As did throughout its report, the Joint Review Panel gave great weight to Northern Gateway’s evidence:

 

Northern Gateway said that potential effects of oil stranded on the shorelines and in the intertidal environment were assessed qualitatively with particular reference to the Exxon Valdez oil spill. It said that the entire intertidal zone along affected
shorelines would likely be oiled, coating rocks, rockweed, and sessile invertebrates. Some of the diluted bitumen could penetrate coarse-grained intertidal substrates, and could subsequently be remobilized by tides and waves. There were
relatively few shoreline areas with potential for long oil residency. Northern Gateway said that the stranded bitumen would not be uniformly distributed, and that heavy oiling would likely be limited to a small proportion of affected shoreline. Northern
Gateway said that, compared to the Exxon Valdez oil spill, the simulation suggested that more dilbit would be distributed along a shorter length of shoreline.

Northern Gateway said that, due to the relatively sheltered conditions in Wright Sound, and in the absence of cleanup, most of the stranded oil would be weathered or dispersed into the marine environment within 3 to 5 years. It said that,
while weathering and dispersal could represent an important secondary source of hydrocarbon contamination of offshore or subtidal sediments, the weathered hydrocarbons themselves would have lower toxicity than fresh dilbit.

Northern Gateway assessed potential effects on key marine receptors including marine water quality, subtidal sediment quality, intertidal sediment
quality, plankton, fish, and a number of bird and mammal species. The company said that acute effects from monocyclic aromatic hydrocarbons such as benzene, toluene, ethylbenzene, and xylene may briefly occur in some areas. Acute effects from polycyclic aromatic hydrocarbons were not likely due to their low water solubility.
Northern Gateway said that chronic adverse effects on the subtidal benthic community were not predicted. After a large spill, consumption advisories for pelagic, bottom-dwelling and anadromous fish, and invertebrates from open
water areas and subtidal sediments would probably be less than 1 year in duration. Northern Gateway said that consumption advisories for intertidal communities and associated invertebrates, such as mussels, could persist for 3 to 5 years or longer in
some sheltered areas.

But dilbit is different from heavy crude

In response to questions from the Haisla Nation and the United Fishermen and Allied
Workers Union, Fisheries and Oceans Canada said that, although it had a great deal of information on conventional oils, the results of research conducted on the biological effects of conventional oil products may not be true for dilbit or unconventional products. Fisheries and Oceans Canada said that it was not in a
position to quantify the magnitude and duration of impacts to marine resources

The United Fishermen and Allied Workers Union said that, because there are so many variables, each spill is a unique event, and some results will be unknowable. It said that a spill the size of the Exxon Valdez incident would affect the entire ecosystem
in the project area, and that recovery to pre-spill conditions would be unlikely to ever occur. It said that a spill the size of the Exxon Valdez oil spill would likely have similar effects in the project area because marine resources in the project area are
similar to those in Prince William Sound. It argued that the cold, sheltered, waters of the Confined Channel Assessment Area would likely experience reduced natural dispersion and biodegradation of oil, leading to heavier oiling and longer recovery
times than seen in Prince William Sound and elsewhere.

The United Fishermen and Allied Workers Union said that patches of buried oil from the Exxon Valdez oil have been found on sand and gravel beaches overlain by boulders and cobbles. It said that effects from a tanker spill associated with the
Enbridge Northern Gateway Project would likely be more severe than the Exxon Valdez oil spill due to the more persistent nature of dilbit and the lack of
natural cleaning action in the sheltered waters of the Confined Channel Assessment Area.

The Gitxaala Nation’s experts said that large historical spill events are not necessarily good indicators of what will happen in the future. They
argued that each spill has unique circumstances and there is still significant uncertainty about the effects of major spills.
The Gitxaala Nation concluded Northern Gateway had failed to adequately consider the potential consequences on ecological values of interest to the Gitxaala.

Gitga’at First Nation said that a spill of dilbit greater than 5,000 cubic metres would result in significant, adverse, long-term, lethal, and sublethal effects
to marine organisms, and that effects would be particularly long-lasting on intertidal species and habitats. It also said that effects from a tanker spill associated with the project would probably be more severe than the Exxon Valdez oil spill, due to
the more persistent nature of dilbit and the lack of natural cleaning action in the sheltered waters

The JRP told how Nothern Gateway looked at the scientific evidence:

The company used a case study approach and reviewed the scientific literature for environments similar to the project area. The review examined 48 spills, including the Exxon Valdez oil spill in 1989, and 155 valued ecosystem components from  cold temperate and sub-arctic regions. Northern Gateway said that the scientific evidence is clear that, although oil spills have adverse effects on biophysical and human environments, ecosystems and their components recover with time.

Pacific herring, killer whales, and pink salmon were species that were extensively studied following the Exxon Valdez spill and were discussed by numerous participants in the Panel’s process.

As referred to by the Haisla Nation, Pacific herring are listed as “not recovering” by the Exxon Valdez Oil Spill Trustee Council. The Trustee Council said that, despite numerous studies to understand the effects of oil on herring, the causes constraining population recovery are not well understood.

Northern Gateway said that scientific evidence indicates that a combination of factors, including disease, nutrition, predation, and poor recruitment
appear to have contributed to the continued suppression of herring populations in Prince William Sound.

Northern Gateway said that 20 years of research on herring suggests that the Exxon Valdez oil spill is likely to have initially had localized effects on herring eggs and larvae, without causing effects at the population level. Northern Gateway said
that, even after 20 years, the effects of the spill on herring remain uncertain. It said that there has also been convergence amongst researchers that herring declines in the spill area cannot be connected to the spill.

Northern Gateway said that herring stocks along the entire coast of British
Columbia have been in overall decline for  years and that herring were shown to recover within 1 to 2 years following the Nestucca barge spill.

A Gitxaala Nation expert noted the uncertainty in interpreting the decline of herring following the Exxon Valdez oil spill and said that the debate is not likely to ever be settled.

The Living Oceans Society said that the Exxon Valdez Oil Spill Trustee Council reported that some killer whale groups suffered long-term damage from initial exposure to the spill. Northern Gateway’s expert said the research leads him to
conclude that the actual effects on killer whales of the Exxon Valdez spill are unknowable due to numerous confounding factors. He said that the
Exxon Valdez Oil Spill Trustee Council has not definitively said that killer whale mortalities can be attributed to the spill. A Government of Canada
expert said that the weight of evidence suggests that the mortality of killer whales was most likely related to the spill.

Northern Gateway said that mass mortality of marine fish following a spill is rare. In response to questions from the Haisla Nation, Northern Gateway said that fish have the ability to metabolize potentially toxic substances such as polycyclic aromatic hydrocarbons. It said that international experience with oil spills has demonstrated that fin fishery closures tend to be very short in duration.
Northern Gateway said that food safety programs for fin fish conducted following the Exxon Valdez spill and the Selendang Ayu spill in Alaska indicated
that the finfish were not affected by the spill and that the fish were found, through food safety testing programs, to be safe to eat.

The Haisla Nation referred to the Exxon Valdez Oil Spill Trustee Council report that discussed the complexities and uncertainties in the recovery status of pink salmon. It said that, by 1999, pink salmon were listed as recovered and that the
report noted that continuing exposure of embryos to lingering oil is negligible and unlikely to limit populations.

Northern Gateway said that the longterm effect of the spill on pink salmon survival is
best demonstrated by the success of adult returns following the spill. Northern Gateway said that, in the month following the spill, when there was still
free oil throughout Prince William Sound, hundreds of millions of natural and hatchery pink salmon fry migrated through the area. It argued that these fish would arguably be at greatest risk from spill-related effects but that the adult returns 2 years later were one of the highest populations ever. Northern Gateway said that sockeye and pink salmon appear to have been unaffected by the Exxon Valdez spill
over the long term.

In response to questions from the Council of the Haida Nation and the United Fishermen and Allied Workers Union, Northern Gateway said that effects
on species such as seaweed, crabs, and clams have been shown to be relatively short-term, with these species typically recovering within 2 years or less
following a spill, depending on circumstances.

Northern Gateway said that, based on the Exxon Valdez spill, the level of hydrocarbons dissolved or suspended in the water column would be expected
to be substantially lower than those for which potential toxic effects on crabs or fish may occur.

In response to questions from BC Nature and Nature Canada, Northern Gateway said that the Exxon Valdez oil spill indicates which species of birds are most susceptible to oiling. Seabirds are generally vulnerable to oil spills because many species spend large amounts of time at sea. Diving seabirds such as murres are particularly vulnerable to oiling because they spend most of their time on the surface, where oil is found, and tend to raft  together. Thus, these species often account for most of the bird mortality associated with oil spills.

More than 30,000 seabird carcasses, of which 74 per cent were murres, were recovered following the Exxon Valdez spill and it was initially estimated
that between 100,000 and 300,000 seabirds were killed. However, detailed surveys of breeding murres in 1991 indicated no overall difference from pre-spill levels confirming rapid recovery of this species.

Northern Gateway said that, although potential toxicological effects from oil spills on
birds have been well documented in laboratory studies, the ultimate measure of recovery potential is how quickly birds return to their natural abundance and reproductive performance. It said that recovery is often difficult to measure due to
significant natural variation in populations and the fact that the baseline is often disputed. It said that this can lead to misinterpretation of results depicting recovery.

At the request of Environment Canada, Northern Gateway filed two reports on the susceptibility of marine birds to oil and the acute and chronic effects of the Exxon Valdez oil spill on marine birds. Northern Gateway said that marine birds are
vulnerable to oil in several ways such as contact, direct or indirect ingestion, and loss of habitat.
It said that many marine bird populations appear to have recovered from the effects of the Exxon Valdez spill, but some species such as harlequin ducks and pigeon guillemots have not recovered, according to the Exxon Valdez Oil Spill Trustee
Council. It said these reports demonstrate that marine birds are susceptible to marine oil spills to varying degrees depending on the species, its life
history and habitat, and circumstances associated with the spill.
Northern Gateway concluded that:
• Marine, freshwater, and terrestrial environments recover from oil spills, with recovery time influenced by the environment, the valued ecosystem components of interest, and other factors such as spill volume and characteristics
of the oil. Depending on the species and circumstances, recovery can be quite rapid or it can range from 2 to 20 years. Other scientific reviews have indicated that recovery of marine environments from oil spills takes 2 to 10 years.
• Different marine ecosystem components recover at different rates. Recovery time can range from days or weeks in the case of water quality, to years or decades for sheltered, soft sediment marshes. Headlands and exposed rocky shores can take 1 to 4 years to recover.
• Little to no oil remained on the shoreline after 3 years for the vast majority of shoreline oiled following the Exxon Valdez spill,
• The Exxon Valdez Oil Spill Trustee Council concluded that, after 20 years, any remaining Exxon Valdez oil in subtidal sediment is no longer a concern, and that subtidal communities are very likely to have recovered.
• Because sheltered habitats have long recovery times, modern spill response gives high priority to preventing oil from entering marshes and other protected shoreline areas.
• Valued ecosystem components with short life spans can recover relatively rapidly, within days to a few years. Recovery is faster when there is an abundant supply of propagules close to the affected area. For example, drifting larvae from
un-oiled marine and freshwater habitats will rapidly repopulate nearby areas affected by a spill.
• Plankton recovery is typically very rapid.
• Seabed organisms such as filter feeders may be subject to acute effects for several years, depending on location, environmental conditions, and degree of oiling.
• Marine fisheries and other human harvesting activities appear to recover within about 2 to 5 years if the resource has recovered and has not been affected by factors other than the oil spill.
• Protracted litigation may delay resumption of fisheries and other harvesting.
• Local community involvement in spill response priorities and mitigation plans can reduce community impacts and speed recovery of
fisheries and harvesting activities.
• A long life span typically means a long recovery time, in the case of bird and mammal populations that can only recover by local reproduction rather
than by immigration from other areas.
• Fast moving rivers and streams tend to recover more quickly than slow flowing watercourses, due to dispersal of oil into the water column by turbulence, which can enhance dissolution, evaporation, and microbial degradation.
• Drinking water and other water uses can be affected by an oil spill for weeks to months. Drinking water advisories are usually issued. Groundwater use may be restricted for periods ranging from a few weeks to 2 years, depending on
the type of use.

• Groundwater can take years to decades to recover if oil reaches it. Groundwater does not appear to have been affected in the case of Enbridge’s Kalamazoo River spill, near Marshall, Michigan.

• Freshwater invertebrates appear to have recovered within 2 years in several cases.
• Freshwater fisheries may recover fully in as little as four years, with signs of partial recovery evident after only a few months. The ban on consumption of fish in the Kalamazoo River was to be lifted approximately two years following
the spill.
• Human activities are affected by factors such as cleanup activities, safety closures and harvesting bans. These typically persist for months to a few years.
• Appropriate cleanup can promote recovery, while inappropriate cleanup techniques can actually increase biophysical recovery time.
Modern spill response procedures carefully consider the most appropriate treatment for the oil type, level of contamination, and habitat type.
The Living Oceans Society noted the following in relation to potential recovery of the marine environment following a spill:
• Physical contamination and smothering are primary mechanisms that adversely affect marine life, particularly intertidal organisms.
• Birds and mammals suffer the greatest acute impact when exposed to oil at or near the water surface.
• Marine communities have variable resiliency to oil spills, from highly tolerant (plankton, kelp beds), to very intolerant (estuaries and sea otters). Impacts to communities and populations are very difficult to measure due
to lack of scientific methods to measure long term,sublethal, and chronic ecological impacts.
• As the return of the marine environment to the precise conditions that preceded the oil spill is unlikely, a measurement of spill recovery can be
based on a comparison of un-oiled sites with oiled sites of similar ecological characteristics.
• The Exxon Valdez oil spill killed many birds and sea otters. Population-level impacts to salmon, sea otters, harbour seals, and sea birds appear to have been low. Wildlife populations had recovered within their natural range of variability after 12 years.
• Intertidal habitats of Prince William Sound have shown surprisingly good recovery. Many shorelines that were heavily oiled and then cleaned appear much as they did before the spill. There is still residual buried oil on some beaches. Some mussel and clam beds have not fully recovered.
• The marine environment recovered with little intervention beyond initial cleaning. Natural flushing by waves and storms can be more effective than human intervention.
• Wildlife rescue and rehabilitation efforts had a marginal beneficial effect on the recovery of bird and mammal populations
• The impacted area of Prince William Sound had shown surprising resiliency and an ability to return to its natural state within the range of natural variability.
• The Exxon Valdez oil spill had significant and long-lasting effects on people and communities.

Questioning experts

The Panel posed a series of questions to experts representing Northern Gateway, federal government participants, and the Gitxaala First Nation regarding the potential recovery of marine ecosystems following a large oil spill.
Northern Gateway said that past marine spills have demonstrated that, over time, the environment will recover to a pre-spill state, and that most species fully recover. It said that species associated with the surface of the water tend to be most susceptible to oil spills, and that cleanup efforts can help direct and
accelerate natural restoration processes.
Federal government experts generally agreed with Northern Gateway’s responses, although they stressed that effects could be felt in areas other than the water surface, such as intertidal and subtidal zones. They said that it is difficult to define
and assess effects and recovery, depending on the species and availability of baseline information.
They said that most species may fully recover over time, and that the time frame for this recovery can be extremely variable depending on species and circumstances.
The Gitxaala Nation’s experts noted the potential for effects on species at the water surface and in intertidal areas, and noted exceptions to the notion that
the marine environment will naturally restore itself.
They said that full recovery can occur, depending on the circumstances, but is not guaranteed. They said that it is difficult to assess spill effects in the absence
of adequate baseline information.

 

Despite the quarter century of studies on the Exxon Valdez inicident, the paucity of studies prior to the spill mean that arguments will continue over “baseline information.”

Participants told the Panel that a lack of baseline information has often made it difficult to separate spill-related effects from those that were caused by natural variation or other causes not related to a spill.

Northern Gateway acknowledged the need for adequate baseline information. Parties such as Coastal First Nations, Raincoast Conservation Foundation, and the Gitxaala Nation said that Northern Gateway had provided insufficient baseline information to assess future spill-related effects. The Kitsumkalum First Nation asked how
spill-related effects on traditionally harvested foods could be assessed in the absence of baseline information.

The Haisla Nation noted the importance of collecting baseline data in the Kitimat River valley to compare with construction and spill-related impacts. The Haisla Nation submitted a report outlining important considerations for a baseline
monitoring program. One recommendation was that the program should engage stakeholders and be proponent-funded. In response to questions
from Northern Gateway, the Haisla Nation noted that a design along the lines of a before/after control/impact model would be appropriate.

In response to these comments, Northern Gateway noted its commitment to implement a Pipeline Environmental Effects Monitoring Program. Northern Gateway’s
proposed framework for the monitoring program indicates that a number of water column, sediment, and biological indicators would be monitored.
The Raincoast Conservation Foundation said that one of the principal lessons learned from the Exxon Valdez oil spill was the importance of collecting abundance and distribution data for non-commercial species. Because baseline information was
lacking, spill effects on coastal wildlife were difficult to determine. Environment Canada also noted the importance of adequate baseline information to
assess, for example, spill-related effects on marine birds.

Northern Gateway outlined the baseline measurements that it had already conducted as part of its environmental assessment. It also said that is
would implement a Marine Environmental Effects Monitoring Program. Northern Gateway said that the initial baseline data, plus ongoing monitoring,
would create a good baseline for environmental quality and the abundance, distribution, and diversity of marine biota. In the event of an oil spill
it would also help inform decisions about restoration endpoints.

Northern Gateway said that it would provide Aboriginal groups with the opportunity to undertake baseline harvesting studies. In response to questions from the United Fishermen and Allied Workers Union, Northern Gateway said that baseline information gathered through the environmental effects monitoring program would also be relevant to commercial harvest management and for assessing compensation claims in the event of a spill.
The Kitimat Valley Naturalists noted the ecological importance of the Kitimat River estuary.

The Joint Review Panel, in its conclusions and ruling, generally agreed with the energy industry that affects of a major oil spill would be temporary.

The Panel heard evidence and opinion regarding the value that the public and Aboriginal groups place on a healthy natural environment.

The Panel finds that it is not able to quantify how a spill could affect people’s values and perceptions.
The Panel finds that any large spill would have short-term negative effects on people’s values, perceptions and sense of wellbeing.

The Panel is of the view that implementation of appropriate mitigation and compensation following a spill would lessen these effects over time. The
Panel heard that protracted litigation can delay recovery of the human environment.

The Panel heard that appropriate engagement of communities in determining spill response priorities and developing community mitigation plans can also lessen effects on communities. Northern Gateway has committed to the development
of Community Response Plans
The Panel’s finding regarding ecosystem recovery following a large spill is based on extensive scientific evidence filed by many parties, including information on recovery of the environment from large past spill events such as the Exxon Valdez
oil spill. The Panel notes that different parties sometimes referred to the same studies on environmental recovery after oil spills, and drew different conclusions. In its consideration of natural recovery of the environment, the Panel focused
on effects that are more readily measurable such as population level impacts, harvest levels, or established environmental quality criteria such as
water and sediment quality criteria.
The Panel finds that the evidence indicates that ecosystems will recover over time after a spill and that the post-spill ecosystem will share functional attributes of the pre-spill one. Postspill ecosystems may not be identical to pre-spill ecosystems. Certain ecosystem components may continue to show effects, and residual oil
may remain in some locations. In certain unlikely circumstances, the Panel finds that a localized population or species could potentially be permanently affected by an oil spill. Scientific studies after the Exxon Valdez spill indicated that the vast majority of species recovered following the spill and that functioning ecosystems, similar
to those existing pre-spill, were established.
Species for which recovery is not fully apparent, such as Pacific herring, killer whales, and pigeon guillemots, appear to have been affected by other
environmental factors or human influences not associated with the oil spill. Insufficient pre-spill baseline data on these species contributed to
difficulties in determining the extent of spill effects.
Based on the evidence, the Panel finds that natural recovery of the aquatic environment after an oil spill is likely to be the primary recovery
mechanism, particularly for marine spills. Both freshwater and marine ecosystem recovery is further mitigated where cleanup is possible, effective, and beneficial to the environment.
Natural processes that degrade oil would begin immediately following a spill. Although residual oil could remain buried in sediments for years, the Panel finds that toxicity associated with that oil would decline over time and would not cause
widespread, long-term impacts.

The Panel finds that Northern Gateway’s commitment to use human interventions,
including available spill response technologies, would mitigate spill impacts to ecosystems and assist in species recovery. Many parties expressed concerns about potential short-term and long-term spill effects on resources that they use or depend on, such as drinking water, clams, herring, seaweed, and fish. The weight of
evidence indicates that these resources recover relatively rapidly following a large oil spill.

For example, following the Selendang Ayu and Exxon Valdez spills in Alaska, fin fish were found, through food safety testing programs, to be safe to eat. Food safety closures for species such as mussels, urchins, and crabs were lifted within 1 to
2 years following the spills.
The actual time frame for recovery would depend on the circumstances of the spill. Until harvestable resources recover, various measures are typically put in place, such as compensation,harvest restrictions or closures, and provision of
alternative supply.
It is difficult to define recovery of the human environment because people’s perceptions and values are involved. This was made clear to the
Panel through oral statements and oral evidence.
The Panel finds that oil spills would cause disruptions in people’s lives, especially those people who depend on the marine environment for sustenance, commercial activities and other uses. The extent and magnitude of this disruption
would depend on the specific circumstances associated with the spill. The Panel views recovery of the socio-economic environment as the time when immediate impacts and interruption to people’s lives are no longer evident, and the
natural resources upon which people depend are available for use and consumption.
The Panel heard that assessing the potential recovery time of the environment is often complicated by challenges in separating background or unrelated events from spill-related effects. There can be natural variation in species populations,
and other natural and human-induced effects can also make it difficult to determine which impacts are spill-related and which are not.
The Panel notes that Northern Gateway has committed to collect baseline data and gather baseline information on harvest levels and values through initiatives such as its Environmental Effects Monitoring Program, Fisheries Liaison
Committee, and traditional harvest studies. The Panel finds that these commitments go beyond regulatory requirements and are necessary. This information would contribute to assessments of spill effects on resource harvesting values,
post-spill environmental recovery, and loss and liability determinations.
The Panel is of the view that it is not possible to predict a specific time in which overall recovery of the environment may occur. The time for recovery would depend on the type and volume of product spilled, environmental conditions,
the success of oil spill response and cleanup measures, and the extent of exposure of living and non-living components of the environment to the product spilled. Recovery of living and non-living components of the environment would
occur over different time frames ranging from weeks, to years, and in the extreme, decades.
Even within the same environmental component, recovery may occur over different time frames depending on local factors such as geographic location, the amount of oiling, success of cleanup, and amount of natural degradation.
Based on the physical and chemical characteristics described for the diluted bitumen to be shipped and the fate and transport modelling conducted, the Panel finds that stranded oil on shorelines would not be uniformly distributed on
shorelines and that heavy oiling would be limited to specific shoreline areas. The Panel accepts Northern Gateway’s prediction that spilled dilbit could persist longer in sheltered areas, resulting in longer consumption advisories for intertidal
communities and associated invertebrates than in more open areas.

Based on the scientific evidence, the Panel accepts the results of the
chronic risk assessment that predicted no significant risks to marine life due to oil deposition in the subtidal sediments.
For potential terrestrial and marine spills, the Panel does not view reversibility as a reasonable measure against which to predict ecosystem recovery. No ecosystem is static and it is unlikely that an ecosystem will return to exactly the same
state following any natural or human induced disruption. Based on the evidence and the Panel’s technical expertise, it has evaluated whether or not functioning ecosystems are likely to return after a spill. Requiring Northern Gateway to
collect baseline data would provide important information to compare ecosystem functions before and after any potential spill.

The Panel finds that Northern Gateway’s ecological and human health risk assessment models and techniques were conducted using conservative assumptions and state of the art models. Combined with information from past spill events, these assessments provided sufficient information to inform the Panel’s deliberation on
the extent and severity of potential environmental effects. The Panel finds that this knowledge was incorporated in Northern Gateway’s spill prevention strategies and spill preparedness and response planning. Although the ecological risk assessment
models used by Northern Gateway may not replicate all possible environmental conditions or effects, the spill simulations conducted by Northern Gateway provided a useful indication of the potential range of consequences of large oil spills in
complex natural environments.

Kitimat Votes: Northern Gateway plebiscite campaigns ramping up with three weeks to go

 

Enbridge web page
Landing page for the Enbridge Northern Gateway “yes for Kitimat” web campaign.

With about three and half weeks to go, the campaigning on the for and against sides for the April 12 Kitimat plebiscite on the Joint Review Panel report on the Northern Gateway has been relatively low key up until now.

That changes with the news that Northern Gateway will hold two campaign Open Houses. Sources have told Northwest Coast Energy News that the first Open House, hosted by Northern Gateway President John Carruthers, will take place at the Rod and Gun on Tuesday, April 1. The second Open House will be hosted by Janet Holder, Enbridge’s Executive Vice President of Western Access, on Tuesday, April 8, also at the Rod and Gun.

Campaign brochure
Campaign brochure from the Northwest Institute for Bioregional Research based in Smithers,

Until now, Enbridge Northern Gateway has been using its deep pockets with a newspaper ad campaign emphasizing Kitimat residents and the promise of jobs, as well as a new website Yes To/For Kitimat.  Northern Gateway has also started a telephone campaign, asking residents if they plan to vote “yes” in the plebiscite.

The main opposition, Douglas Channel Watch, is concentrating on what political analysts call the “ground game,” by knocking on doors. Douglas Channel Watch, although they claim to be amateurs facing a giant corporation, are following a classic political strategy. DCW is certainly confident of the “no” vote and their campaign so far, is aimed at fence sitters and those who are in favour of the pipeline but are uncertain about the 209 conditions.

 

The third player, so far, is Smithers based Northwest Institute for Bioregional Research, which distributed a glossy brochure, comparing the BC provincial government’s final arguments on the project with the Joint Review Panel’s conclusions.

The opposition campaign is concentrating on the perceived lack of balance in the Joint Review Panel, while, again, so far, Enbridge Northern Gateway is avoiding the JRP, perhaps because the company itself is not all that certain about what all 209 conditions actually mean.

That means the District of Kitimat Council, with some members tilting toward favouring the Northern Gateway (although the council members generally deny public opposition), could have blundered with the ambiguous question centered around the JRP

Do you support the final report recommendations of the Joint Review Panel (JRP) of the Canadian Environmental Assessment Agency and National Energy Board, that the Enbridge Northern Gateway project be approved, subject to 209 conditions set out in Volume 2 of the JRP’s final report?”

Overall, whether one opposes or supports the Northern Gateway project, in the end, the Joint Review hearings did not go over well in northwestern British Columbia. By and large the JRP accepted most of the Northern Gateway evidence at face value while largely playing down the concerns of many northwestern BC residents—even supporters. Most important was the JRP’s conclusion that effects of any oil spill, either from a pipeline breach or a tanker accident would be

In the unlikely event of a large oil spill, we found that there would be significant adverse effects on lands, waters, or resources used by residents, communities, and Aboriginal groups. We found that the adverse effects would not be permanent and widespread.

 

Murray Minchin
Murray Minchin, of Douglas Channel Watch, outline the environmental groups campaign at District of Kitimat Council, March 17, 2014. (Robin Rowland/Northwest Coast Energy News)

Douglas Channel Watch is trying to capitalize on these doubts. At District Council on Monday March 17, Murray Minchin said:

“What we found out that there are five key reasons why even supporters of Northern Gateway were going to vote no on the plebiscite and people who were sitting on the fence were considering voting no on the plebiscite.

“The plebiscite is on the Joint Review final report and conditions which allow temporary foreign workers to work on the pipeline in Canada, describes Northern Gateway as a raw diluted bitumen export pipeline; does not mandate upgrading or any other value adding job program and will allow 1,100 foot long super tankers to operate on BC’s pristine north coast…The final reason was that the Joint Review panel found that the Exxon Valdez and Kalmazoo spills were localized events with temporary affects which would be justified in the circumstances if they happened in BC.”

“So by voting no we will be sending a message to Ottawa telling them we don’t want temporary foreign workers taking jobs from Canadians. We don’t want thousands of jobs being exported overseas. We don’t want up to 364 dilbit super tankers a year, and the 364 supertankers is based on the actual amount of product that will be put through the pipeline since they’re only applying for 525,000 barrels a day but its actually designed for 850,000 barrels a day, so that’s how we come up with the figure of one super tanker a day, coming to Kitimat and one leaving.

“If you don’t think major diluted bitumen spills in Kitimat’s salmon rivers or on BC’s pristine coast can be justified in any circumstances. So if you vote no on the plebiscite, while you may support the idea, this is an opportunity to send a message back to Ottawa that they really need to rethink their priories.”

Donny van Dyk
Donny van Dyk outlines Northern Gateway’s contributions to the Kitimat community to District Council, March 10, 2014 (Robin Rowland/Northwest Coast Energy News)

Enbridge’s only public appearance early in the campaign was when Donny van Dyke, Northern Gateway’s Manager of Coastal Aboriginal and Community Relations, outlined to council on March 10, the contributions that Northern Gateway has given to the community and to local training programs.

Van Dyk said the Northern Gateway supported training programs that will also be used by other new industrial and commercial projects. He said training with the company’s partners create life skills, noting that one focus of the training is to help people who may have barriers to education, life skills and gainful employment.

Van Dyke says the company plans Northern Gateway Youth Achievement Awards for outstanding students going beyond academics. As part of the awards, 50 winners received iPads.

Van Dyk said that Northern Gateway has contributed $20,000 to community groups within Kitimat, including $7,500 this year . They contributions include: $100,000 for marine skills training, $145,000  for Environmental Field Assessment training, $110,000 went to the Pipe Trades Foundation for training and financial support and $5000 for trades training for local high school students. The company has contributed $225,000 to Project Shop Class, a construction trades program, with $100,000 earmarked for the high schools in Kitimat.

Northern Gateway’s ads both in local newspapers and on a new website yesto kitimat.ca are emphasizing long term jobs.

Northern Gateway adThe latest ad says:

“The pipeline will bring jobs. But the pipeline is just the start. We’ll start to see growth in the economy and the population. We’ll see more opportunities for our kid, job training, extracurricular activities, music programs, all kinds of good stuff.”

Another of the ads, featuring Trish Parsons, Chamber of Commerce manager says:
“For me, the best thing about living in Kitimat is that you can go hiking or fishing on your way home form work. It’s a special place to live. But without jobs and stability. I worry about my kids and grandkids won’t be able to live here with me, And that’s why I want more than anything.”

The Northern Gateway ads have created vigorous debates on social media, with many of the comments opposed to the project, including resentment at the money Enbridge is spending on the ads and the idea that Northern Gateway has “infiltrated” a community event.

At the council meeting, Murray Minchin of Douglas Channel Watch pointed out that the according to the BC elections act third party advertising is capped at $3167.93 per electoral district, which given the fact that Black Press charges $8,250 for a full page colour ad in its newspapers, that if the plebiscite was a provincial election, Northern Gateway would have already far exceeded those limits.

In a free society, Enbridge Northern Gateway, as the proponent of the project, has the right to campaign on behalf of the project. It is not the same as a third party intervention in a general election.

The overall problem is the short-sighted, half-hearted approach that the District of Kitimat Council has taken with the plebiscite, which now goes beyond the confusing plebiscite question. The rules as released by District only mention signage. There was apparently no anticipation that campaign spending could be an issue, even though one side was a well-financed large corporation and therefore no research if campaign spending limits are permitted in a municipal non-binding plebiscite.

District of Kitimat plebiscite rules   (pdf)

The confusing plebiscite question and now the issue of campaign spending can only raise doubts about whether or not the community accepts the results of the vote, especially if the outcome is close.

(With more controversial energy projects coming up, and the possibility of more referenda or plebiscites, the province should set clear and transparent rules for future votes.)

 

Plebiscite Reality Check

Northern Gateway

Enbridge adThe Northern Gateway ads promise jobs, stability and say “we need to know everything’s going to be good for a long time, not just a year or two.”

Apart from the fact that Northern Gateway confidently believes it can foretell the future, that the pipeline will bring sustained growth in the Kitimat economy, here is what that Joint Review Panel said in its official report on the number of permanent jobs.

 

Northern Gateway said that the number of permanent jobs during operations would total 268.
This includes permanent workforce requirements in Edmonton, Fox Creek, Whitecourt, Grande Prairie, Tumbler Ridge, Prince George, Burns Lake, and Kitimat. It said that this also includes people expected to be employed in Kitimat to supply services associated with operations of the Kitimat Terminal, including tug operators, pilots, emergency response staff, and various other service providers.
The company said that annual spending on project operations is expected to total about $192 million. The company said that this includes $94.8 million in British Columbia, $77.6 million in Alberta, and $19.5 million in federal corporate income taxes. The company said that jobs related to operations are expected to provide opportunities for residents and offer long-term sustainable employment
benefit to the provinces.

This means that Northern Gateway will provide less than 300 permanent jobs spread across the entire pipeline route, and many of them will probably be at Enbridge headquarters in Edmonton. The number of permanent jobs at Kitimat have been estimated from as low as 25 to as high as 60. That is hardly a big boost to the Kitimat economy.

Douglas Channel Watch

Douglas Channel Watch has kept its message clear and simple.

Douglas Channel Watch Plebiscite Press Release (pdf)

Both in its press release and in Murray Minchin’s statement to council, he is calling on Kitimat to “send a message to Ottawa.” Given the record of the Harper government on issues such as the BC wide objections to the closing of the Kitsilano Coast Guard base, it is likely that even if there is an overwhelming “no” vote in Kitimat, Harper, his cabinet and officials will ignore the plebiscite result. It would take more pressure than from the residents of Kitimat  for Harper to pay attention. Of course, the Northern Gateway may yet garner worldwide attention like the Keystone XL has. But the big problem, as the Ottawa pundits have pointed out, if you get Harper’s attention, the result is often vindictive rather than seeing someone else’s point of view. Up to now, except for an occasional obligatory visit to the Haisla Nation, for the Conservatives, Kitimat is out of sight and out of mind.

The other small mistake by Douglas Channel Watch came a couple of weeks ago when Murray Minchin, when calling for a public forum prior to the vote, said that Kitimat didn’t need a speaker like former Dawson Creek mayor Mike Bernier (now a Liberal MLA) who Minchin said took the focus off the issue of the pipeline. However, it was Bernier, who, two years ago, warned Kitimat about the problems of work camps and a potential housing crisis. It appears that Bernier’s warning fell on deaf ears, given the current housing crisis in Kitimat.

 

Correction:

Earlier this story said “Douglas Channel Watch is also hosting an event with author Arno Kopecky at Riverlodge on Saturday March 29th at 7 pm for a talk on his book Oil Man and the Sea, Navigating the Northern Gateway.” Douglas Channel Watch says it is not hosting the event, but members of the group were spreading the word about Kopecky’s appearance.

Clio Bay reclamation postponed as new contractor takes over at KM LNG

Marine clay sign Robin Rowland photo
Sign explaining marine clay at the Chevron/ KMLNG Open House, in Kitimat, March 13, 2014. (Robin Rowland/Northwest Coast Energy News)

Studies on the Clio Bay reclamation project have been postponed until the fall while the new prime contractor takes over the Kitimat LNG project.

A spokesperson for Chevron said at the Kitimat LNG open house on Wednesday now that Irving , Texas-based Fluor Corp, in partnership with a joint-venture partner, Japan’s JGC Corp. has won the engineering, procurement and construction contract for the KM LNG project, it will take some time for the new company to be briefed on the Clio Bay project and then begin working with Stantec the environmental contractor on the project. That means that the reclamation project itself will now not likely proceed until spring of 2015.

In community meetings last fall, Chevron had said it expected the preliminary studies to be completed in January or February.

KM LNG, a partnership between Chevron and Apache Corp, took over the Riverlodge Recreation Centre for three days from February 2 to 4, to brief employees and contractors on the transition from KBR Inc., the original prime contractor which lost the bidding for the second stage of the contract to Flour.

KM LNG organized the open house mainly to show what is happening at the old Eurocan site, which is being converted to a work camp for the project.

The Clio Bay project, however, had a prominent place among the panels on display at Riverlodge. In the panels, Chevron says that up to 40 per cent of the Clio Bay bottom is covered with wood debris, at some points, as much as 10 metres deep, meaning a degraded habitat for dungeness crab and eel grass.

As was announced in the fall, Chevron, in partnership with the Haisla Nation, plan to take marine clay from Bish Cove and use it to cover the wood debris to create a new sea bottom. One panel said: “The new layer of marine clay is expected to be colonized by eel grass and by species such as worms, crustaceans, small fish and other sea life that will encourage a more plentiful, healthy ecosystem replacing the degraded ecosystem created by the decomposing wood debris that now covers the ocean floor.”

Chevron sees the project as an example that others could follow. Another panel notes: “Project proponents around the world are moving away from the old practice of dredging and disposing of marine clay. The Clio Bay restoration project would see marine clay used wisely to deliver benefits to the environment, community and culture.”

Work continues on the remediation of the old Eurocan mill site. Chevron and Apache are, in effect, spending millions of dollars to clean up the mess left behind when West Fraser abandoned the mill.

The company has to demolish the old mill and remediate contaminated areas. One of the big challenges is dealing with the old landfill site, which Chevron says has to be brought up to 21st century environmental standards. That includes adding an impermeable lining to the landfill and upgrading the leachate treatment systems.

Cleaning up the mess left by Eurocan will take about five years, according to one of the panels at the Open House. Chevron says that job will improve the environment, where they plan to build a work camp both in the short term and in the long term as work continues.

 

First Nations historical herring harvest offers “deep time perspective” to modern managers, SFU study says

SFU archaeologists
Iain McKechnie and Dana Lepofsky examine ancient herring fish bones that tell the story about how gigantic herring fisheries were for thousands of years in the Pacific Northwest. (SFU)

The herring, now dwindling on on the Pacific Coast, was once “superabundant” from Washington State through British Columbia to Alaska and that is a warning for the future, a new study says.

A team of scientists lead by Simon Fraser University argue that the archaeological record on the Pacific Coast offers a “deep time perspective” going back ten thousand years that can be a guide for future management of the herring and other fish species.

An archaeological study looked at 171 First Nations’ sites from Washington to Alaska and recovered and analyzed 435,777 fish bones from various species.

Herring bones were the most abundant and dating shows that herring abundance can be traced from about 10,700 years ago to about the mid-nineteenth century with the arrival of Europeans and the adoption of industrial harvesting methods by both settlers and some First Nations.

That means herring were perhaps the greatest food source for First Nations for ten thousand years surpassing the “iconic salmon.” Herring bones were the most frequent at 56 per cent of the sites surveyed and made up for 49 per cent of the bones at sites overall.

The study was published online Monday, February 17, 2014, in Proceedings of the National Academy of Sciences (PNAS). Simon Fraser University researchers Iain McKechnie, Dana Lepofsky and Ken Lertzman, and scientists in Ontario, Alberta and the United States are its co-authors.

The study is one of many initiatives of the SFU-based Herring School, a group of researchers that investigates the cultural and ecological importance of herring.

“By compiling the largest data set of archaeological fish bones in the Pacific Northwest Coast, we demonstrate the value of using such data to establish an ecological baseline for modern fisheries,” says Iain McKechnie. The SFU archaeology postdoctoral fellow is the study’s lead author and a recent University of British Columbia graduate.

Co-author and SFU archaeology professor Dana Lepofsky states: “Our archaeological findings fit well with what First Nations have been telling us. Herring have always played a central role in the social and economic lives of coastal communities. Archaeology, combined with oral traditions, is a powerful tool for understanding coastal ecology prior to industrial development.”

The researchers drew from their ancient data-catch concrete evidence that long-ago herring populations were consistently abundant and widespread for thousands of years. This contrasts dramatically with today’s dwindling and erratic herring numbers.

“This kind of ecological baseline extends into the past well beyond the era of industrial fisheries. It is critical for understanding the ecological and cultural basis of coastal fisheries and designing sustainable management systems today,” says Ken Lertzman, another SFU co-author. The SFU School of Resource and Environmental Management professor directs the Hakai Network for Coastal People, Ecosystems and Management.

Map of First Nations sites with fish bones
Map of First Nations’ archaeological sites with high numbers of fish bones. Herring is abundant in sites throughout the Strait of Georgia. In 71% of sites, herring makes up at least 20 per cent of the bones found at the site. (SFU/PNAS)

Heiltsuk tradition

The paper says that the abundance of herring is additionally mirrored in First Nations’ place
names and origin narratives. They give the example of the 2,400-y-old site at Nulu where herring
made up about 85 per cent of the fish found in local middens. In Heiltsuk oral tradition, it is Nulu where Raven first found herring. Another site, 25 kilometres away at the Koeye River, has only has about 10 per cent herring remains and is not associated with herring in Heiltsuk tradition.

(In an e-mail to Northwest Coast Energy News, McKechnie said “there is a paucity of archaeological data from Kitimat and Douglas Channel. There is considerable data from around Prince Rupert, the Dundas Islands and on the central coast Namu/Bella Bella/ Rivers Inlet area and in southern Haida Gwaii.”)

The study says that the archaeological record indicates that places with abundant herring were consistently harvested over time, and suggests that the areas where herring massed or spawned were more extensive and less variable in the past than today. It says that even if there were natural variations in the herring population, the First Nations harvest did not affect the species overall.

It notes:

Many coastal groups maintained family-owned locations for harvesting herring and herring roe from anchored kelp fronds, eel grass, or boughs of hemlock or cedar trees. Herring was harvested at other times of the year than the spawning period when massing in local waters but most ethnohistorical observations identify late winter and springtime spawning as a key period of harvest for both roe and fish.

The herring and herring roe were either consumed or traded among the First Nations.

Sustainable harvests encouraged by building kelp gardens,wherein some roe covered fronds were not collected, by minimizing noise and movement during spawning events, and by elaborate systems of kin-based rights and responsibilities that regulated herring use and distribution.

Industrial harvesting

Industrial harvesting and widespread consumption changed all that. Large numbers of herring were harvested to for rendering to oil or meal. By 1910, the problem was already becoming clear. In that year British Columbia prohibited the reduction of herring for oil and fertilizer. There were reports at that time that larger bays on the Lower Mainland were “being gradually deserted by the larger schools where they were formerly easily obtained.”

But harvesting continued, in 1927 the fishery on eastern Vancouver Island, Columbia, processed
31,103 tons of herring. The SFU study notes that that is roughly twice the harvest rate for 2012 and would also be about 38 per cent of the current herring biomass in the Strait of Georgia.
In Alaska, reduction of herring began in 1882 and reached a peak of 75,000 tons in 1929.

As the coastal populations dwindled, as with other fisheries, the emphasis moved to deeper water. By the 1960s, the herring populations of British Columbia and Washington had collapsed. Canada banned herring reduction entirely in 1968, Washington followed in the early 1980s.

In the 1970s, the herring population off Japan collapsed, which opened up the demand for North American roe, which targeted female herring as they were ready to spawn. That further reduced the herring population so that the roe fishery is now limited to just a few areas including parts of the Salish Sea and off Sitka and Togiak, Alaska.

The First Nations food, social and ceremonial herring fishery continues.

Government fishery managers, scientists, and local and indigenous peoples lack consensus on the cumulative consequences of ongoing commercial fisheries on herring populations. Many First Nations, Native Americans, Alaska Natives, and other local fishers, based on personal observations and traditional knowledge, hypothesize that local herring stocks, on which they consistently relied for generations, have been dramatically reduced and made more difficult to access following 20th century industrial fishing

Deep time perspective

The SFU study says that some fisheries managers are suggesting that the herring population has just shifted to other locations and other causes may be climate change and the redounding of predator populations.

But the study concludes, that:

Our data support the idea that if past populations of Pacific herring exhibited substantial variability, then this variability was expressed around a high enough mean abundance such that there was adequate herring available for indigenous fishers to sustain their harvests but avoid the extirpation of local populations.

These records thus demonstrate a fishery that was sustainable at local and regional scales over millennia, and a resilient relationship between harvesters, herring, and environmental change that has been absent in the modern era.

Archaeological data have the potential to provide a deep time perspective on the interaction between humans and the resources on which they depend.

Furthermore, the data can contribute significantly toward developing temporally meaningful ecological baselines that avoid the biases of shorter-term records.

Other universities participating in the study were the University of British Columbia, University of Oregon, Portland State University, Lakehead University, University of Toronto, Rutgers University and the University of Alberta.

 

RELATED:

BC First Nations Opposition to Commercial Herring Fisheries supported by DFO

Fisheries minister ignored advice from own scientists

Oil spill caused “unexpected lethal impact” on herring, study shows

Ottawa’s Northern Gateway consultation with First Nations limited to three simple questions and 45 days: documents

The federal government’s main consultation with First Nations on the Northern Gateway Joint Review Panel report is limited to just three simple questions that had to be answered within 45 days, according to documents seen by Northwest Coast Energy News.

Joint Review Panel cover
Cover of Volume 1 of the Joint Review Panel ruling on Northern Gateway

That despite the fact that the first volume of the JRP report “Connections” is 76 pages and the second volume “Considerations” is 418 pages including the 209 recommendations and appendices and came after two years of hearings and tens of thousands of pages of evidence.

On Dec. 6 and again on Dec. 16, 2013, just prior to the release of the Joint Review Panel report, Brett Maracle, Crown Consultation Coordinator at the Canadian Environmental Assessment Agency for the Northern Gateway project wrote to the First Nations potentially affected by Northern Gateway, saying their response had to be filed within 45 days of the release of the JRP. Since the report was released on December 19, 2013, that made the initial deadline January 31, 2014.

The letter also told the First Nations that if they wanted their positions included in the “Crown Consultation Report” that would be part of the package on Northern Gateway presented to the federal cabinet, that position had to be limited to just two to three pages “given the number of groups involved” with a final deadline of April 16, 2014.

Maracle’s letters used the term Phase IV to define the post JRP consultations, implying there were three earlier stages of consultation, something many First Nations have disputed, especially since the Harper government had earlier maintained that the JRP itself was the constitutionally mandated consultation.

The cabinet has until June 19, 2014, 180 days after the release of the report to approve the issuing of the federal permits for the Northern Gateway project. Consultation with First Nations on projects such as the Northern Gateway is required by the Constitution and has been upheld by the Supreme Court of Canada.

The three questions outlined in the letter were:

  • Does the Report appropriately character the concerns you raised during the JRP process?
  • Do the recommendations and conditions in the Panel Report address some/all of your concerns?
  • Are there any “outstanding” concerns that are not addressed in the Panel Report? If so, do you have recommendations (i.e proposed accommodation measures) how to address them?

Consultation on implementation

The third question appears to confirm what most political observers have said, approval of the Northern Gateway by the Harper cabinet is a a forgone conclusion, since Maracle speaks of “accommodation measures.” When the JRP approved the Northern Gateway project, the panel said that Enbridge’s proposed “mitigation” measures in case of a spill were adequate, something environmental groups and First Nations are now disputing in court.

It appears from the correspondence seen by Northwest Coast Energy News, that the federal government will only consider further specific consultations with First Nations after the approval of the Northern Gateway and only then on the implementation and construction process, rather than consulting on the project as a whole.

The Haisla have filed a document in response to the JRP that notes that

The Haisla Nation needs to understand Canada’s views of the role that future federal decisions might play for the proposed project. In its December 12, 2013 to Mr. Maracle, the Haisla Nation asked the federal government to provide a comprehensive list of the regulatory permits which would be issued the the federal government decision-makers in Haisla Nation Territory in the event the proposed project is approved and describe the consultation process that would occur prior to decisions being on those regulatory permits, within 45 days of the issuance of the JRP Report.

Mr. Maracle’s January 29, 2014 [reply] suggests that the only future federal decisions on the proposed project which may entail consultation are specific watercourse crossing and fish habitat destruction permits issued by Fisheries and Oceans Canada.

Whole-of-government

One of the problems reaching back to long before the Joint Review Panel hearings began is that the Harper government policy was what they called a “whole-of-government” approach in its consultations with First Nations, saying: “The Crown is open to discussing how consultation with the framework provided will be carried out.”

In their repose, the Haisla say the federal government never defined how the “whole-of-government” approach to First Nations was going to work and noted:

What Canada should have realized is that it has a very real obligation to consult with the Haisla Nation at the deepest end of the consultation spectrum that cannot be pigeon-holed into a one size fits all approach.

Further, the term whole-of-government is misleading, as this approach actually prohibits the majority of government from engaging in consultation.

The Haisla then say: “Documents we have obtained under an Access to Information Request clearly indicate individual departments were asked not to communicate directly with the Haisla Nation.”

The response goes on to say:

Further questions at federal government witnesses during the JRP process confirmed that federal departments had not met with the Haisla Nation since the commencement of the JRP process. While these witnesses were reluctant to confirm that they had been prohibited from meeting with us, they repeatedly referred to the “whole-of-government” approach to consultation as their reason for not meeting.

Canada’s “whole-of-government” approach clearly limited engagement to a strict process with no opportunity for real engagement.

Earliest stages

The Haisla are telling the Harper government:

It is clear that the Haisla Nation that we are the very earliest stages of consultation with Canada about the proposed project….It is clear to the Haisla Nation that the 45-day period within which Canada has unilaterally determined face-to-face meetings with all the Aboriginal groups potentially affected by the proposed project will occur is not an adequate amount of time to complete a meaningful consultation process.

 

Related

Haisla ask cabinet to postpone Northern Gateway decision to allow for adequate consultation with First Nations

Haisla consultation reply outlines flaws in Northern Gateway Joint Review report

Haisla response lists evidence rejected by Northern Gateway Joint Review

Haisla ask cabinet to postpone Northern Gateway decision to allow for adequate consultation with First Nations

Haisla NationThe Haisla Nation are calling on the federal cabinet to postpone its decision on the Northern Gateway project to allow time for adequate consultations with First Nations, according to the Haisla response to the Joint Review Panel, seen by Northwest Coast Energy News.

The Joint Review Panel report and recommendations were released on Dec. 19, 2013 and the cabinet has 180 days from that point to recommend approval of the project.

The Haisla argue that Section 54 of the National Energy Board act allows the Governor-in-Council, the federal cabinet, to extend the timeline if it wants to, if recommended by the Minister of Natural Resources.

So far, the Harper government has refused to extend the deadline. The Haisla response document says Chief Counsellor Ellis Ross spoke to Minister of Natural Resources Joe Oliver on the telephone requesting the extension, but, according to the document, all Oliver did was point to the legislation that calls for the 180 day response to a joint review report.

The Haisla response document also has a long lists of what the Haisla say are flaws in the Joint Review Panel report.

Consultations

In correspondence with the Haisla, Brett Maracle, Crown Consultation Coordinator at the Canadian Environmental Assessment Agency for the Northern Gateway project, says:

the process set out by the Government of Canada in the Aboriginal Consultation Framework was finalized after receiving and carefully considering input from Aboriginal groups….The Government of Canada believes the process outlined in the Aboriginal Consultation Framework provides for a deep level of meaningful consultation with Aboriginal groups with Phase IV being the final step prior to a decision being made on the Project.

The Haisla dispute there has been any “deep level of meaningful consultation,” citing in the document a long list of attempts to engage the federal government with little or no response.

In their response, the Haisla Nation Council says:

Canada, has, to date, refused to engage in meaningful consultations with the Haisla Nation. Instead Canada has unilaterally imposed what it calls a “deep level meaningful consultation” process which is fundamentally flawed for a number of reasons…

The document lists attempts by the Haisla to engage with ministers and government departments including requests for a meeting with then Environment Minister Peter Kent, prior to the opening of the JRP formal hearings in Kitamaat Village in January 2012. Although the Haisla requested a meeting with Kent, several times in 2011, no meeting ever occurred. It was not until April 19, 2012, four months later that Kent replied to the Haisla saying he had asked the President of the Canadian Environmental Assessment Agency to meet with the First Nation prior to the start of the JRP hearings. However, it was apparently impossible to schedule such a meeting in December, 2011.

To which the Haisla reply:

For over six years, Canada ignored Haisla Nations requests for meetings. Once the JRP’s oral hearings process commenced, Canada further closed the door on any opportunity for a meeting until the JRP Report was release. This refusal to consult was baseless. The ongoing JRP process was not a rational or justifiable basis for Canada’s refusal to consult…

Canada has yet to meet with the Haisla Nation to discuss the proposed project, other than to tell the Haisla Nation it is only engaging through the JRP process for now. This is not consultation. It is, perhaps, at best an initial step towards a consultation process.
Ignoring the Eyford report

Joe Oliver
Natural Resources Minister Joe Oliver (front far right) answers questions after his news conference at the Northwest Community College Long House, March 19, 2013. Douglas Eyford is standing behind Oliver. (Robin Rowland/Northwest Coast Energy News)

In March 2013, Natural Resources Minister Joe Oliver flew to Terrace for a photo op to announce the appointment of Douglas Eyford to consult First Nations on the Northern Gateway project. Oliver then flew back to Ottawa without meeting anyone in the region. Eyford’s report Forging Partnership Build Relationship was released in November, 2013.

The Haisla say:

Mr. Eyford’s Report recommended that Canada should consider undertaking early engagement to address Aboriginal interests that may not be dealt within a regulatory process. The Haisla Nation has been seeking such early engagement from Canada since the proposed project was first announced.

Mr. Eyford’s Report also recommended that Canada should engage and conduct consultations n addition to those in regulatory processes, as may be required, to address issues and facilitate resolutions in exceptional circumstances. The Haisla Nation also asked for this, identifying early that this proposed project was an exceptional circumstance due to the significant potential impacts on the Haisla Nation.

It is not too late for Canada to correct the deficiencies in its consultation process, but cannot realistically do so by adhering unilaterally by Canada and laid out in Mr. Maracle’s letter of December 16, 2013

The Haisla Nation Council response was sent to Brett Maracle, Crown Consultation Coordinator at the Canadian Environmental Assessment Agency for the Northern Gateway project. The Haisla also sent copies of the response to Joe Oliver, the Minister of Natural Resources, Gaetan Caron, Chair of the National Energy Board, Leon Aqlukkaq, Minister of the Environment, Bernard Valcourt Minister of Aboriginal Affairs and Northern Development, Gail Shea, Minister of Fisheries and Oceans, BC Premier Christy Clark, Steve Thomson, BC Minister of Forests, Lands and Natural Resources and Mary Polak, BC Minister of the Environment.

Related

Ottawa’s Northern Gateway consultation with First Nations limited to three simple questions and 45 days: documents

Haisla consultation reply outlines flaws in Northern Gateway Joint Review report

Haisla response lists evidence rejected by Northern Gateway Joint Review

Haisla consultation reply outlines flaws in Northern Gateway Joint Review report

Haisla NationThe Haisla Nation response to the federal government’s request for consultation on the Joint Review Panel report on the Northern Gateway lists what the First Nation sees as flaws in the panel’s assessment of the project. (The Haisla filed their first list of flaws in the JRP in a court challenge).

In the response, seen by Northwest Coast Energy News, the Haisla are objecting to both the government’s and the JRP’s attitude toward the idea of consultation as well as some of the specific findings by the panel. The Haisla also fault the JRP process for refusing to take into consideration reports and studies that were released after the evidentiary deadlines.

Overall, the Haisla say

 The JRP report is written in a way that prevents an assessment of how or whether the JRP considered Haisla Nation concerns and of how whether the JRP purports to address the Haisla Nation’s concerns. Further the JRP Report is lacking n some of the fundamental justification required to understand how arrived at its recommendations.

So what are the Haisla concerns?

In the document filed with the Canadian Environmental Assessment Agency, the Haisla say:

 The proposed project carries with it an inordinate amount of risk to Haisla Nation Territory. The Haisla Nation is being asked to play host to this proposed project, despite the risk the proposed project poses to the land waters and resources relied on by the Haisla Nation for sustenance and cultural heritage. The risk includes a huge risk to Haisla Nation aboriginal rights to trap, hunt and fish, to gather seafood and gather plant materials. It could result in significant damage to the Haisla Nation cultural heritage—its traditional way of life…..

The terminal site is one of the few areas suitable for terminal development in our territory. It is also home to over 800 Haisla Nation Culturally Modified Trees (CMTs). Northern Gateway proposes to irrevocably alter the land, the use of the land and access to this land for the duration of the proposed project, which is anticipated to be at least 80 years. This irrevocable alteration includes the felling of our CMTS….

By seeking to use Haisla Nation aboriginal title land for the proposed project, Northern Gateway will be effectively expropriating the economic value of this land. Northern Gateway is proposing to use Haisla Nation aboriginal title land for a project with no benefit to the Haisla Nation and which is fundamentally at odds with Haisla Nation stewardship principles.

 

Obstructed clear understanding 

The Haisla say that “Canada has failed to adhere is own framework” for the JRP because in the Aboriginal Consultation Framework says “Federal departments will be active participants in the JRP process to ensure the environmental assessment and consultation record, is as accurate and complete as possible.”

The Haisla say “Canada provided limited written evidence to the JRP” and goes on to say that the “federal governments not only failed to provide relevant information but also obstructed a clear understanding of project impacts.”

Among the evidence relevant to Northern Gateway that the federal government was “unable or unwilling to provide” includes:

  •  Natural Resources had expertise on acid rock damage and metal leaching but did not include evidence on that in their evidence
  •  Fisheries and Oceans did not have a mandate to conduct an assessment of the potential toxicological effects of an oil spill.
  •  Environment Canada did not review or provide information on the spills from pipelines.
  • The federal government witnesses were unable to answer questions about the toxicity of dispersant.
  • Environment Canada was asked if it had studies of the subsurface currents and the movement of submerged oil. Environment Canada told the JRP did not measure hydrodynamic data but relies on DFO. DFO cold not provide any witnesses to the JRP with expertise on subsurface currents.

 

In the formal response on the JRP report, Haisla also say:

  •  The JRP has concluded that the risk of a large spill form the pipeline in the Kitimat River Valley is not likely, despite very significant information gaps relating to geohazards, leak detection and spill response.
  •  The JRP has concluded that a large spill would result in significant adverse environmental effects. However, the JRP appears to base a finding that these effects are unlikely to occur on an unreasonable assumptions about how widespread the effects could be or how long they would last. The JRP has not considered the extent to which a localized effect could impact Haisla Nation.
  •  The JRP relies on the concept of “natural recovery” as mitigation of significant adverse effects. The Haisla Nation asked the JRP to compel information from Northern Gateway about the applicability of its evidence to species found in Haisla National Territory. The JRP, however, refused to compel this evidence from Northern Gateway.
  •  The JRP has accepted at face value that Northern Gateway would shut down its pipeline within 13 minutes in the event of a rupture and has failed to consider the effects of a large spill that is not detected with this timeframe through the control centre (or was in the case of Kalamazoo, is detected by the control centre but is systematically mischaracterized and ignored).

As part of the consultation process the Haisla want 22 changes to the JRP report, changes which echo the Haisla Final Written Argument that was filed at the end of the hearings.

It says:

 The Panel should find that potential impacts to asserted Haisla Nation aboriginal rights and title from the proposed project are such that project cannot be found to be in the public interest in the absence of meaningful consultation… The current status of engagement and the federal government imposition of a 6-month time limit to complete consultation raise serious concerns that meaningful consultation will not be possible. Therefore the proposed project is not in the public interest.

Among the others are:

  • The JRP should have determined the significant of adverse effects to rare ecological communities that cannot mitigated.
  • The JRP should have provided more information to allow a reasonable assessment of the risk of a spill from the pipelines.
  • The JRP would have considered all factors to contribute to the risk of a spill.
  • The JRP should have found that Northern Gateway’s assessment of the toxicity of an oil spill because it did not consider the full range of products to be shipped nor did it consider the potential pathways of the effect of a toxic spill, whether from a pipeline, at the marine terminal or in the case of a tanker spill
  • The evidence had not demonstrated that Northern Gateway’s spill response would be able to mitigate the effects of a spill either at the pipeline, at the Kitimat marine terminal or from a tanker spill.
  • The JRP did not consider the impact of the Kitimat Marine Terminal on their cultural and archaeological heritage, including culturally modified trees.

Related

Ottawa’s Northern Gateway consultation with First Nations limited to three simple questions and 45 days: documents

Haisla ask cabinet to postpone Northern Gateway decision to allow for adequate consultation with First Nations

Haisla response lists evidence rejected by Northern Gateway Joint Review

Haisla response lists evidence rejected by Northern Gateway Joint Review

Members of the Joint Review panel make notes at Kitamaat Village (Robin Rowland)
Members of the Northern Gateway Joint Review Panel, left to right, Kenneth Bateman, chair Sheila Leggett and Hans Matthews make notes at the June 25, 2012 hearings at the Haisla Recreation Centre, Kitamaat Village. A map of Douglas Channel can be seen behind the panel. (Robin Rowland/Northwest Coast Energy News)

The Haisla Nation in their response to the Crown on the Northern Gateway Joint Review Panel details four studies, three Canadian and one American that were released after the Joint Review evidentiary deadline had passed, evidence that the Haisla say should be considered in any consideration of the Northern Gateway pipeline, terminal and tanker project. (The American report from the National Oceanic And Atmospheric Administration was released after the JRP final report)

JRP chair Sheila Leggett’s constant citing of rules of procedure and her stubborn refusal to consider new evidence and studies in a dynamic situation that was changing rapidly was one of the reasons that many people in the northwest said the JRP had lost credibility.

The Haisla say: “It is incumbent upon Canada to consider and discuss the information in these reports as part of a meaningful consultation process…” and then lists “key findings” that have potential impacts on aboriginal rights and title:

The West Coast Spill response for the government of British Columbia which found:

  • Most oil spilled into the marine environment cannot be cleaned up
  • There is a disconnect between planning and actual repose capability
  • Canada’s spill response is “far from world class.”

The Transport Canada Ship Oil Spill Preparedness and Response study:

  • Douglas Channel will go from low risk to high risk for pills if the project goes ahead
  • The study recommends preparation for a “true worst case discharge” rather than “the credible worst case discharge” as proposed by Northern Gateway
  • Canada needed a much more rigorous regulatory regime covering tankers.

The joint federal government technical report on the properties of bitumen from the Canadian Oil Sands:

  • There are uncertainties on how diluted bitumen would behave in a marine environment.
  • Northern Gateway did not provide adequate information about sediment levels to allow for proper study of interaction with diluted bitumen
  • Dispersant may not be effective.
  • Weathered diluted bitumen would “reach densities at which it will sink freshwater without mechanical or physical assistance.”

The US National Oceanic And Atmospheric Administration report on Transporting Alberta Oil sands:

  • Diluted bitumen has “significant differences from conventional crudes.’ (The JRP used conventional crude as a benchmark in its findings)
  • The physical properties of diluted bitumen “fluctuate based on a number of factors.
  • Pipeline operators may not have detailed information related to products in the pipeline at the time of a spill
  • There is a lack of experimental data on the weathering behaviour of oil sands product which limits the ability of spill response organizations “to understand and predict the behaviour and fate of oil sands products in freshwater, estuarine and saltwater environments.”

 
Related

Ottawa’s Northern Gateway consultation with First Nations limited to three simple questions and 45 days: documents

Haisla ask cabinet to postpone Northern Gateway decision to allow for adequate consultation with First Nations

Haisla consultation reply outlines flaws in Northern Gateway Joint Review report