Joint Review Panel tells northwestern BC to bear the “burdens” of Northern Gateway for the good of Canada

 

Joint Review Panel cover
Cover of Volume 1 of the Joint Review Panel ruling on Northern Gateway

 

If you read both the 76 pages of Volume One of the Northern Gateway Joint Review decision and the 417 pages of Volume 2, a total of 493 pages, one word keeps reappearing. That word is “burden.”

The JRP panel asks “How did we weigh the balance of burdens, benefits, and risks?”

And it says:

Many people and parties commented on the economic benefits and burdens that could be brought about by the Enbridge Northern Gateway Project. In our view, opening Pacific Basin markets wouldbe important to the Canadian economy and society. Though difficult to measure, we found that the economic benefits of the project would likely outweigh any economic burdens.

The JRP notes:

The Province of British Columbia and many hearing participants argued that most of the project’s economic benefits would flow to Alberta, the rest of Canada, and foreign shareholders in oil and pipeline companies. They said British Columbia would bear too many of the environmental and economic burdens and risks compared to the benefits.

But, as the panel does throughout the ruling, it accepts, with little, if any, skepticism, Northern Gateway’s evidence and assertion:

Northern Gateway said about three-quarters of construction employment would occur in British Columbia, and the province would get the largest share of direct benefits from continuing operations.

It does touch on the “burdens” faced by the Aboriginal people of northern BC and others in the event of a catastrophic spill.

In the unlikely event of a large oil spill, we found that there would be significant adverse effects on lands, waters, or resources used by Aboriginal groups. We found that these adverse effects would not be permanent and widespread. We recognize that reduced or interrupted access to lands, waters, or resources used by Aboriginal groups, including for country foods, may result in disruptions in the ability of Aboriginal groups to practice their traditional activities. We recognize that such an event would place burdens and challenges on affected Aboriginal groups. We find that such interruptions would be temporary. We also recognize that, during recovery from a spill, users of lands, waters, or resources may experience disruptions and possible changes in access or use.

And the JRP goes on to say:

We recommend approval of the Enbridge Northern Gateway Project, subject to the 209 conditions set out in Volume 2 of our report. We have concluded that the project would be in the public interest. We find that the project’s potential benefits for Canada and Canadians outweigh the potential burdens and risks….

We are of the view that opening Pacific Basin markets is important to the Canadian economy and society. Societal and economic benefits can be expected from the project. We find that the environmental burdens associated with project construction and routine operation can generally be effectively mitigated. Some environmental burdens may not be fully mitigated in spite of reasonable best efforts and techniques…. We acknowledge that this project may require some people and local communities to adapt to temporary disruptions during construction.

As for the chance of a major oil spill, again the JRP talks about burdens:

The environmental, societal, and economic burdens of a large oil spill, while unlikely and not permanent, would be significant. Through our conditions we require Northern Gateway to implement appropriate and effective spill prevention measures and spill response capabilities, so that the likelihood and consequences of a large spill would be minimized.

It is our view that, after mitigation, the likelihood of significant adverse environmental effects resulting from project malfunctions or accidents is very low.

And concludes:

We find that Canadians will be better off with this project than without it.

In the Joint Review ruling is one fact. Northern British Columbia must bear the “burden” of the Northern Gateway project for the good of Alberta and the rest of Canada. The JRP accepts, without much questioning, Northern Gateway’s assurances that environmental disruptions during construction will be minimal and that the chances of a major spill from either a pipeline or a tanker are minimal.

Canadians as a whole may be better off with the Northern Gateway. Whether the people who live along the pipeline and tanker route will be better off is another question, one which the Joint Review Panel dismisses with casual disdain.

Cover of JRP ruling
Cover of Volume 2 of the Joint Review rulng on Northern Gateway

The politics of the Joint Review Panel

There are actually two Joint Review Panel reports.

One is political, one is regulatory. The political decision by the three member panel, two from Alberta and one from Ontario, is that the concerns of northwestern British Columbia are fully met by Enbridge Northern Gateway’s assurances. There is a second political decision, found throughout both volumes of the report, and the reader sees the Joint Review Panel has the notion that many parts of the environment have already been degraded by previous human activity, and that means the construction and operation of the Northern Gateway will have little consequence.

Here is where the Joint Review Panel is blind to its own bias. With its mandate to rule on the Canadian “public interest,” the panel makes the political determination that, in the Canadian public interest, northwestern BC must bear the “burden” of the project, while other political issues were not considered because, apparently those issues were outside the JRP’s mandate.

…some people asked us to consider the “downstream” emissions that could arise from upgrading, refining, and diluted bitumen use in China and elsewhere. These effects were outside our jurisdiction, and we did not consider them. We did consider emissions arising from construction activities, pipeline operations, and the engines of tankers in Canadian territorial waters.

During our hearings and in written submissions, many people urged us to include assessment of matters that were beyond the scope of the project and outside our mandate set out in the Joint Review Panel Agreement. These issues included both “upstream” oil development effects and “downstream” refining and use of the products shipped on the pipelines and tankers…Many people said the project would lead to increased greenhouse gas emissions and other environmental and social effects from oil sands development. We did not consider that there was a sufficiently direct connection between the project and any particular existing or proposed oil sands development or other oil production activities

If someone in Northwestern British Columbia favours the Northern Gateway project, if they believe (and many people do) what Enbridge Northern Gateway says about the economic benefits, then it is likely they will accept the burden and the further environmental degradation imposed by the Joint Review Panel on this region of British Columbia.

If, on other hand, for those who are opposed to the project, then the decision to impose the burden on this region is both unreasonable and undemocratic (since no one in northern BC, in the energy friendly east or the environmental west has been formally asked to accept or reject the project). For those opposed to the project, the idea that since the environment has already been disrupted by earlier industrial development, that Canadians can continue to degrade the environment with no consequence will only fuel opposition to the project.

As for the assertion that green house gas emissions were not part of the Joint Review Panel’s mandate, that is mendacious. The panel made a political decision on the role of the people of northwestern BC and the state of northwestern BC’s environment. The panel made a political decision to avoid ruling on the role of Northern Gateway in contributing to climate change or the larger world wide economic impact of pipelines and the bitumen sands.

Regulations

The Joint Review Panel is supposed to be a regulatory body and should be pipeline, terminal and tanker project go ahead after the expected court challenges from First Nations on rights, title and consultation and from the environmental groups, then those 209 conditions kick in.

While the Joint Review Panel largely accepts Enbridge Northern Gateway’s evidence with little questions, in some areas the panel does find flaws in what Northern Gateway planned. In a few instances, it actually accepts the recommendations from intervenors (many from First Nations, who while opposed to the project, successfully demanded route changes to through environmentally sensitive or culturally significant territory.)

When it comes to regulations, as opposed to politics, the Joint Review Panel has done its job and done it well. If all 209 conditions and the other suggestions found in the extensive second volume of the ruling are actually enforced then it is likely that the Northern Gateway will be the safe project that Enbridge says it will be and actually might meet BC Premier Christy Clark’s five conditions for heavy oil pipelines across BC and tankers off the BC coast.

But and there is a big but.

The question is, however, who is going to enforce the 209 conditions? In recent conversations on various social media, people who were quiet during the JRP hearings, have now come out in favour of the pipeline project. Read those comments and you will find that the vast majority of project supporters want those conditions strictly enforced. Long before the JRP findings and before Premier Christy Clark issued her five conditions, supporters of the Northern Gateway, speaking privately, often had their own list of a dozen or two dozen conditions for their support of the project.

The people of northwestern BC had already witnessed cuts to Fisheries and Oceans, Environment Canada and the Canadian Coast Guard in his region even before Stephen Harper got his majority government in May 2011.

Since the majority government Harper has cut millions of dollars from the budgets for environmental studies, monitoring and enforcement. The Joint Review Panel began its work under the stringent rules of the former Fisheries Act and the Navigable Waters Act, both of which were gutted in the Harper government’s omnibus bills. Government scientists have been muzzled and, if allowed to speak, can only speak through departmental spin doctors. The Joint Review Panel requires Enbridge Northern Gateway to file hundreds of reports on the progress of surveying, environmental studies, safety studies, construction plans and activities and project operations. What is going to happen to those reports? Will they be acted on, or just filed in a filing cabinet, perhaps posted on an obscure and hard to find location on the NEB website and then forgotten?

Will the National Energy Board have the staff and the expertise to enforce the 209 conditions? Will there be any staff left at Environment Canada, Transport Canada, Fisheries and Oceans and the Canadian Coast Guard where the conditions demand active participation by government agencies, or ongoing consultation between federal agencies and Northern Gateway? Will there actual be monitoring, participation and consultation between the project and the civil service, or will those activities amount to nothing more than meetings every six months or so, when reports are exchanged and then forgotten? Although Stephen Harper and his government say the Northern Gateway is a priority for the government, the bigger priority is a balanced budget and it is likely there will be more cuts in the coming federal budget, not enhancements to environmental protection for northwestern BC.

The opponents of the project might reluctantly agree to the 209 conditions if Harper government forces the project to go ahead. It will be up to the supporters to decide whether or not they will continue their support of Northern Gateway if the 209 conditions are nothing more than a few pages of Adobe PDF and nothing more.

 

Commentary: In the tanker study, the District of Kitimat was missing in action

kitimatlogoThe list of participants in the oil spill preparedness and response study released last week by the federal government shows two glaring no shows, the District of Kitimat and Rio Tinto Alcan.
The Haisla Nation and the Gitga’at Nation did provide written submissions to the panel.

The expert panel was set up by the federal government to review “oil handling facilities and ship-source oil spill preparedness and response.” The expert panel was to review the “structure, functionality and the overall efficiency and effectiveness of the system, as well as analyzing the requirements for hazardous and noxious substances, including liquefied natural gas.”

Transport Canada tanker report
Expert panel tanker risk assessment report cover (Transport Canada)

As well as commissioning the Genivar report on the state of oil spill preparedness and consequences, the panel interviewed stakeholders and visited a few key locations, including Port Metro Vancouver.

The panel also invited any interested groups to submit documents or their own views to be taken into consideration.

Among the stakeholders interviewed by the panel were companies and organizations very familiar to Kitimat; Chevron and Shell, main partners in two of the LNG projects; Enbridge, which has proposed the Northern Gateway Pipeline and Kinder Morgan which has proposed expanding the dilbit pipeline on the Lower Mainland. Other stakeholders included Coastal First Nations, the Prince Rupert Port Authority, SMIT Marine and the Vancouver Port Authority.

As well as the Haisla and the Gitga’at, five west coast municipalities submitted their own reports to the tanker panel, both the city and districts of North Vancouver, the city of Richmond, the District of Ucluelet and the District of West Vancouver. San Juan County in Washington State also made a submission to the panel. So did the Prince Rupert and Vancouver Port authorities.

Chevron, Enbridge, Imperial Oil, Kinder Morgan, Pacific Northwest LNG, Seaspan Marine, and the Union of BC Municipalities, among others also submitted their views to the panel.

So why didn’t the District of Kitimat participate? When it came to the Enbridge Northern Gateway Joint Review, the mayor and council always maintained their neutrality motion meant that the District would not be an active participant. That was always a short sighted viewpoint. The District should have participated actively in the JRP in such a way as to protect the region’s interests where necessary while remaining neutral. If the District of Kitimat sat out the tanker panel because of the Northern Gateway neutrality policy, that was no excuse, because the expert panel’s mandate specifically included LNG.

Tanker traffic is a potential threat to the San Juan Islands (the Gulf Islands on the American side of the border). It is astounding that San Juan County would think that the Canadian tanker panel was important enough to make a submission and the District of Kitimat did not.

RTA logoWhat about Rio Tinto Alcan? Kitimat has been a private port for 60 years, run first by Alcan and then by Rio Tinto Alcan. Why wasn’t RTA asked to participate as a stakeholder? Why didn’t RTA make a submission? Those who are pushing the Northern Gateway terminal always like to say that tankers have been calling at Kitimat for those 60 years. That is true. Of course, none of those tankers have been the Very Large Crude Carriers proposed by Northern Gateway. However, those 60 years means that RTA has the expertise on the Port of Kitimat and Douglas Channel. RTA probably has important data that could have helped both the expert panel and Genivar (which pointed out the paucity of data on small and medium sized tankers). In not participating in the tanker panel submissions and possibly not providing valuable data on Douglas Channel, RTA neglected its social responsibility both to the community of Kitimat and the rest of the province of British Columbia.

Editorial: Once again the National Energy Board shows its contempt for British Columbia

Second Update December 10- NEB refuses to release JRP report in BC

The Globe and Mail reports Dec. 10, 2013

The National Energy Board says releasing its decisions in Calgary is standard practice regardless of where in Canada the project is located, and it will not make an exception for its report on the controversial $6.5-billion Northern Gateway pipeline proposal.

Apparently the NEB doesn’t trust reporters in BC to act as professionals. Also, as usual the stock market is more important than the people of BC.

NEB spokesperson Sarah Kiley told the Globe the board ruled out simultaneous lock-ups in Alberta and British Columbia.

“As far as hosting multiple media lock-ups, we need to make absolutely sure that the report is not inadvertently released before the markets close,” Ms. Kiley said. “This becomes more challenging if there are multiple events due to things like the need to ship reports.”

Because the ruling will affect markets, she said the report must be kept confidential until they close on the day of release.

 


A couple of years ago, on a visit to the Lower Mainland, I was speaking to man who was considering making a 10 minute comment before the Northern Gateway Joint Review panel. In the end, this man, who is by no means a radical environmentalist, just someone worried about the future, decided not to testify, telling me: “The National Energy Board is nothing more than an extension of the Petroleum Club.”

Once again today, the National Energy Board showed its contempt for British Columbia and proved my source’s belief that it is nothing more than an extension of the Petroleum Club.

Vancouver radio station News 1130 made a routine inquiry to the NEB about a reporters’ “lockup” on the day that the JRP decision is released. A “lockup” allows the media to read an embargoed report a few hours in advance so that  at the moment it is officially released, it can print or broadcast an accurate account of a government report.

News 1130 was told by the NEB that there would be no lockup in British Columbia, only reporters in Calgary, the home of the NEB, will have that opportunity, because “logistics did not work out for a lock-up” in Vancouver.

(Reporters who work along the actual pipeline route in the north are even farther off the NEB radar. The Calgary lockup will leave northerners to figure out what the JRP decision actually means from reports from Alberta-based journalists. The history of the past few years has proven that most Alberta-based reporters have little interest or knowledge of the concerns of northwest British Columbia.)

Before the JRP hearings began in January, 2012, a well-known northern First Nations leader predicted all this in a background conversation. He noted that there was no representation from British Columbia on the Joint Review Panel. The JRP had two members from Alberta, chair Sheila Leggett, and member Kenneth Bateman, while the “First Nations member,” Hans Matthews, was from Ontario. The First Nations leader, who would have to appear before the JRP, privately called them “flatlanders” with no knowledge of B.C.

He was right.

Even before that conversation, the Joint Review Panel blundered in its first appearance in Kitimat, the preliminary hearing at Riverlodge on August 30, 2010, by offending the Haisla Nation with a schedule of appearances crafted in Calgary that ignored that Kitimat is on Haisla traditional territory and put then Chief Counsellor Dolores Pollard well down on the schedule. That hearing was held up for about half an hour while the JRP scrambled to undo their mistake.

While the JRP did finally learn to respect the customs of BC’s First Nations, and the panel was often hamstrung by arcane and obsolete rules of procedure, the panel too often proved far too inflexible in understanding the issues along the pipeline route and up and down the coast.

The most recent example was the JRP’s refusal to consider the recent evidence from both scientists and Fisheries and Oceans about the growing importance of humpback whales in Douglas Channel. The JRP’s excuse was that the window for evidence had closed. If the Northern Gateway actually goes ahead, Enbridge speaks about the 30-year-life of the project. Yet the JRP’s continuing inflexibility acts as if all the key issues can be decided by the December 30 deadline and after that everything will be just fine.

In the past few weeks, report after report has been released on projects that will change the lives of the people of the northwestern British Columbia. The media of the northwest, all with very limited budgets, have been ignored time and time again.

Take another example from today. In March, the federal government flew its First Nations negotiator Douglas Eyford and Natural Resources Minister Joe Oliver to Terrace to announce the beginning of the Eyford’s meetings with BC First Nations (while at the same time Oliver didn’t bother to visit Kitimat). This morning, the Eyford report was released at a press event in media-rich Vancouver. For the release of the report, the northwest didn’t count.

On Tuesday, the federal government also used Vancouver to release a report on tanker traffic. While Vancouver is also vulnerable to tanker problems, the feds considered their message could be carried best by the mainstream major metro media. Again, no one bothered with the northwest, where the tankers will be sailing along the coast and up and down Douglas Channel.

A few weeks ago, BC Premier Christy Clark announced her agreement with Alberta Premier Alison Redford on the compensation issue, one of her five conditions for heavy oil development in the province. Clark solved the political dispute with Alberta by handing off the compensation issue from the province to the energy industry with absolutely no guarantee that the energy companies will actually offer compensation for crossing BC. Northern reporters could listen in to an audio feed of the news conference from the BC government website, but could not ask questions.

In the 21st century, of course, these news conferences are not about presenting factual information; the news conferences are about getting out a government message track, so questions from reporters who actually know about issues are not wanted.

The Joint Review Panel (with the NEB one of the “joint” partners) is supposedly, on paper, a quasi-judicial body, independent of the government.

If the JRP wants to salvage even a bit of its crumbling credibility for its Northern Gateway decision, it will show that it respects British Columbia. The means holding two additional lockups. If Terrace was good enough for the final arguments, and a central location for the northwest, one lockup should be held in Terrace, so northerners can read reporting by northwest-based reporters. The second, of course, should be in Vancouver for the province’s major media centre.

Given the record of the past two years, don’t hold your breath, time and time again the bureaucratic priorities and the fact that the NEB is thoroughly embedded in the energy culture of Alberta, it is likely that the release of the report sometime in the coming weeks will be Alberta-centric and will prove my source right, that the NEB is nothing more than that extension of the Petroleum Club.

 

Update: The Globe and Mail has confirmed News1130’s report in National Energy Board sidestepping B.C. on Northern Gateway.

The board plans to hold a media lock-up in Calgary, but does not have similar plans to brief reporters in British Columbia, says an official with the independent federal agency established to regulate international and interprovincial issues around the electrical utility, gas and oil sectors.

Board spokesperson Sarah Kiley said Thursday that the board recognizes there is an interest in B.C. in the subject, and said there is no final plan yet.

The Globe was unable to get a statement from the Liberal government of BC but for the opposition,Spencer Chandra Herbert (Vancouver-West End) said, the energy board should not be hiding out in Calgary when they announce what they are going to do, regardless of whether they approve or reject the project.

“You would think they would have the ability and respect for B.C. to host it here and explain whatever decision they make here to B.C. media and intervenors,” he said.

“We’re worthy of that respect.”

Commentary: The earthshaking difference between Enbridge and LNG

Joint Review Panel
The Northern Gateway Joint Review panel, Kenneth Bateman, Sheila Leggett and Hans Matthews, listen to final arguments in Terrace, June 17, 2013. (Robin Rowland/Northwest Coast Energy News)

Buried deep in the LNG Canada environmental assessment application, a reader will find a key difference in attitude with at least one of the group of companies planning liquified natural gas development in the northwest and Enbridge Northern Gateway.

It’s an earthshaking difference, since it’s all about earthquakes.

The documents filed by LNG Canada with the BC Environmental Assessment Office and the Canadian Environmental Assessment Agency acknowledge that there is a possibility of an earthquake (a one in 2,475 year event) at the LNG terminal site.

Northwestern British Columbia was shaken by two major earthquakes in the months before the Joint Review Panel concluded its hearings in Terrace. Both were far from Kitimat, but felt across the District. On October 27, 2012, there was a magnitude 7.8 earthquake on the Queen Charlotte Fault off Haida Gwaii. That quake triggered a tsunami warning, although the actual tsunami was generally limited to the coast of Haida Gwaii. Both landline and mobile phone service in Kitimat was briefly disrupted by both the quake and overloads on the system. Kitimat was also shaken by the 7.5 magnitude earthquake centered at Craig, Alaska a few weeks later on January 9, 2013.

With the exception of one vague reference in its final argument documents presented to the Joint Review Panel, Enbridge has stubbornly refused to consider any seismic risk to the region.

That was the company’s policy long before the October. 27, 2012 Haida Gwaii earthquake and was Enbridge policy after October 27, 2012.

In a public meeting in Kitimat on September 20, 2011, more than a year before the Haida Gwaii earthquake, John Carruthers, Northern Gateway president, insisted to skeptical questioners at a community forum at Mount Elizabeth Theatre that there was no earthquake danger to the proposed Northern Gateway pipeline and bitumen terminal in Kitimat.  One of the questioners, Danny Nunes, of Kitimat, asked could the pipes withstand an earthquake? Carruthers repeated that Kitimat was not in an earthquake zone, that the fault was off Haida Gwaii and so would not affect Kitimat.

After the September, 2011 meeting, I asked Carruthers if Enbridge knew about the March 27,1964 “Good Friday” magnitude 9.2 Alaska earthquake that, because of its high magnitude, had caused major shaking in Kitimat. That earthquake destroyed much of Anchorage and triggered tsunamis that caused damage and death across Alaska and in parts of British Columbia, Oregon and California.

Carruthers promised to get back to me and never did.

On June 17, 2013, six months after the Craig, Alaska earthquake, in his opening summation before the Joint Review Panel, Richard Neufeld, lead lawyer for Northern Gateway, stayed on message track, telling the JRP, referring to pipelines: “The route is not seismically unstable. The seismic risk along the pipeline right-of-way is low, with only a few locations of moderate risk encountered, none of which are within the Haisla territory.”

That brought a gasp from spectators in the room, or at least those who had felt the October and January earthquakes.

The following day, June 18, Murray Minchin of Douglas Channel Watch found an anomaly in the Enbridge documentation, arguing in the group’s summation:

“The Proponent’s written final argument gets on shaky ground regarding design and construction of the storage tanks on a ridge beside Douglas Channel in paragraph 249 where they say:

“‘It also involves the safe construction and operation of the Kitimat terminal in Kitimat Arm in an area subject to seismic activity which encompasses both terrestrial and marine components.’

“Now, that’s interesting because isn’t that the first time — the first admission by the Proponent in a little over 10,000 pages of documents that the area they intend to build their project is in a seismically-active area?

“Haven’t they been telling us all along to this point that the only seismic concerns would be from the distant Queen Charlotte fault off of Haida Gwaii?

“Now, this completely contradicts Mr. Neufeld’s statement yesterday where he described the Project area as not “seismically unstable”. So what is it? This is their final argument and they’re contradicting themselves.”

Minchin went on to quote from the Enbridge argument: “’Seismic conditions in the project area have also been addressed.’

“Well, really? Is that a truthful statement, considering Natural Resources Canada has only submitted a preliminary report concerning a 50-kilometre fault line and massive submarine landslides they accidentally discovered last year in Douglas Channel while doing a modern survey of the Channel for navigation hazards.

“How can the Proponent claim to have adequately addressed seismic forces in their design of this Project when they don’t know what those forces are or for what duration they may be subjected to those forces.

“Has there ever been a paleoseismological study in the Project area to establish past earthquake or tsunami history?

“Wouldn’t it be in the best interest of the Proponent, the Panel and Canadians to know the risks before 1.3 billion litres of liquid petroleum products are allowed to be stored on a low ridge right beside Douglas Channel?”

In his final rebuttal on June 24, Neufeld did not address the contradictions that Minchin had pointed out.

Compare Enbridge’s attitude to the view of LNG Canada, which at very least, appears willing to consider that major events could have adverse consequences on the terminal and liquifaction facilities.

    • The first one is a bit puzzling to Kitimat residents “A 1 in 100 year 24 hour rain event,” after all the town often gets rain for 24 hours straight or more fairly often.
    • The second, 1 in 200 year flood of the Kitimat River. Flooding has always been a concern and will be even more so, because as the pipelines come into town, whether natural gas or bitumen, those pipelines will be close to the river bank.
    • The 1 in 2,475 year seismic event. That figure is probably correct for a local event given the geology of the Kitimat Valley—unless, of course, the fault line discovered by the Geological Survey of Canada on Hawksbury Island proves to be a potential danger.
    • A tsunami.
    • Change in flow of the Kitimat River.
    • Even more interesting is that LNG Canada is willing to consider possible effects of climate change on the project, saying: “Predicted climate change effects during the project lifecycle on sea-level rise, precipitation and temperature. Where relevant and possible, the implications of such climate induced changes to the extreme weather events given above will also be addressed.”

.

Although the hydrocarbon industry as a whole is reluctant to acknowledge climate change, it appears that on a practical level, the LNG Canada partners, if they are about to invest billions of dollars in a natural gas liquifaction plant and marine terminal, will certainly take steps to protect that specific investment from the effects of climate change.

On the other hand, the National Energy Board, as matter of policy and the Northern Gateway Joint Review Panel, both still stubbornly refuse to even consider any effects of climate change, even possible effects locally on a specific project application.

The Joint Review Panel decision on the Northern Gateway is expected sometime in the next three weeks. While most reports seem to indicate that the decision will be released after Christmas before the Dec. 30 deadline, there has been recent media speculation that the decision could be released next week.

In the meantime, Enbridge has pulled out all stops in a public relations campaign to build support for the Northern Gateway. While a recent poll indicates that advertising campaign may be having some success in the Lower Mainland, the same poll showed that 65 per cent of northern BC residents oppose or strongly oppose the Northern Gateway.

The problem for Enbridge is that the new public relations campaign is repeating the blunders that began when they first proposed Northern Gateway in 2005. There have been meetings across the northwest, but those meetings have been invitation only affairs at chambers of commerce and community advisory boards, with possible opponents or skeptics and media perceived as critical of Enbridge not invited. So Enbridge still wants to control the message and will only talk to friendly gatherings.

Then there are the television spots featuring Janet Holder, the Enbridge vice president in charge of Northern Gateway, supposedly showing her commitment to wilderness. Those commercials would have had more credibility if the agency had produced the ads with actual video of Holder walking through the bush, rather than shooting the spots in front of a green screen in a studio, with pristine wilderness stock video in the background, and Holder acting as if she was a model for an adventure clothing company rather than  vice president of a pipeline company.

Right-wing business columnists in Toronto and the countless Albertans fume at the so-called “hypocrisy” of British Columbians who support LNG and oppose bitumen.

Of course, those critics didn’t feel the earth move under their feet.  The critics don’t see the difference between natural gas and bitumen, differences very clear to the people of British Columbia.

It’s more than the fact, that so far, the LNG projects have been relatively open and willing to talk to potential adversaries,  as Chevron has done on the controversial Clio Bay project; more than the fact that if even a fraction of the LNG projects go ahead, the money coming into northwestern BC means that the handful of permanent jobs promised by Enbridge will be literally a drop in a bucket of warm bitumen.

Although there are many other environmental issues on the Northern Gateway project, the fact the potential for earthquakes in Kitimat is brushed off by Enbridge while LNG Canada is at least willing to consider the problem, sums it all up.

 

Updated with link to Sept. 2011  questions and answers

 

 

 

 

 

 

 

BC calls for input on conservation plan for Ashdown Island, one of the “disappeared” on Douglas Channel

Ashdown Island
Sea lions basking on Ashdown Island (BC Parks)

BC Parks and the Gitga’at First Nation are calling for public input as they development a management plan for the K’nabiyaaxl/Ashdown Island Conservancy at the mouth of Douglas Channel.

BC Parks describes the area as:

K’nabiyaaxl/Ashdown Conservancy covers 727 hectares of marine and uplands ecosystem on the northwest coast of British Columbia, south of Gil Island. The conservancy is 40 kilometres south of Hartley Bay and 120 kilometres southwest of Kitimat. The conservancy is in the traditional territory of the Gitga’at First Nation.

The public has until December 9 to read the management plan and file comments with BC Parks and the Gitga’at Nation.

Although not well known outside the Kitimat region, Ashdown Island did receive some measure of fame because it was one of the islands that disappeared from Enbridge’s promotional animation of the tanker route for diluted bitumen from Kitimat to Asia if the controversial Northern Gateway project goes ahead. As well as a haven for wildlife, Ashdown is known as a prime halibut fishing area.

Ashdown Island
Ashdown Island study area (BC Parks)

Ashdown Island is on the proposed “Southern Approach” for Enbridge’s tanker traffic routes.

Tanker routes (Wikipedia from Living Oceans)
Tanker routes (Wikipedia from Living Oceans)

 

Recent studies by both Fisheries and Oceans and scientists have identified the area as “critical habitat” for the rebounding humpback whale population visiting the BC Coast. The Northern Gateway Joint Review panel recently refused to consider those studies because they were released after the deadline for filing evidence.

The BC management plan notes:

The area and nearby waters have been and continue to be intensively used by the Gitga’at people for cultural, social and economic purposes. In Tsimshian language (Sm’algyax), K’nabiyaaxl means “place where cliff” – which is located on the west side of Ashdown Island.

The conservancy encompasses all of Ashdown Island and the foreshore area
and land covered by water within 200 metres of the high tide line. It
has high intertidal values, especially for seaweed, and contains an important
Steller Sea Lion haulout. The waters around the island support important Gitga’at
community fisheries.

 

Although in Gitga’at traditional territory, the plan notes that the Haisla, the Kitasoo community of Klemtu; and Gitxaala community of Kitkatla on Dolphin Island should be consulted.

It goes on to say:

The conservancy protects an entire small island representative of the Hecate Lowlands Ecosection. The island’s foreshore marine environments include high value intertidal areas which provide high value habitat for important marine wildlife species and migratory birds. The conservancy also protects a haulout for Stellar Sea Lions (Eumetopias jubatus), a species of concern (provincially blue- listed3)…

Stellar Sea Lions use small islets off the south end of Ashdown Island as a winter
haulout, with up to 12 pups and 107 adults observed

The plans lists the Humpback Whale (Blue-listed, S1N); the. Killer Whale (Red- or Blue-listed, S2 or S3 depending on sub-species); and the Fin Whale; as Ashdown Island species at risk. (SARA species schedule procedure site)

As well:

The conservancy contains seven hectares of potential Marbled Murrelet habitat
which, although small, may provide important habitat when combined with core
Marbled Murrelet habitat in nearby areas.

K’nabiyaaxl’s remote location provides an excellent opportunity for maintaining
biological diversity and natural environment values. This habitat should not be
disturbed by conservancy use and development.

The island and the near shore are also part of the Gitga’at’s rich cultural heritage.

The conservancy is near the seasonal Gitga’at village camp of K’yel. The Gitga’at
travel in the spring from Hartley Bay to K’yel, which they use as a base for conducting intensive marine and intertidal harvesting and hunting activity.

Since time immemorial, the Gitga’at people have harvested fish and marine
mammal species in waters adjacent to K’nabiyaaxl. They also collect seaweed,
plants and berries from intertidal and upland areas on the island.

Archaeological sites are known to exist in the area. That the BC Archaeological
Branch does not have archaeological sites registered in the conservancy is not
indicative of the rich history of Gitga’at occupancy and use of K’nabiyaaxl.

“Conservatives’ hatred for science intentional part of their environmental policy,” Cullen says

Skeena Bulkley Valley MP and NDP House Leader, reacting to  Northwest Coast Energy News exclusive story that the  Northern Gateway Joint Review Panel has refused to consider a Fisheries and Oceans report on humpback whales says in a  Facebook posting “Like many of you, I’ve come to see the Conservatives’ hatred for science as more than a passing tendency – it’s an intentional part of their environmental policy.”

Cullen has issued an open letter to Natural Resources Minister Joe Oliver and Fisheries Minister Gail Shea that says:

 

21 November 2013

Dear Ministers,

This is an open letter regarding the 21 October 2013 report, entitled Recovery Strategy for the North Pacific Humpback Whale (Megaptera novaeangliae) in Canada, from the Department of Fisheries and Oceans on a recovery strategy for humpback whales in Canada. As you are likely aware, it is part of the DFO’s mandate to help this species recover from a century of whaling that nearly drove the species into extinction. The report identified four areas of “critical habitat” for humpbacks, one of which is at the mouth of the Douglas Channel, the gateway from Kitimat to the Pacific Ocean. The report also identified vessel traffic and toxic spills as two of the greatest threats to the recovery of this species.

Thus, it was with shock and dismay I recently learned of the decision by the federal joint review panel for the Northern Gateway project to ignore the report as evidence in its ruling, as though vessel traffic and the potential for toxic spills were not two of the primary environmental concerns surrounding this proposal.

It is particularly stunning given that the report, submitted to the panel last week, was authored by a federal government agency, and yet the federal government is now saying it refuses to take into account its own information when ruling on this project. It begs the question of why we even have a federal government agency devoted to ensuring the health and viability of our fisheries and our waters when the research and recommendations they produce are ignored by the very same federal government.

The purpose of the joint review panel hearings is to weigh the available scientific evidence in determining whether this project will negatively impact habitat and endangered species.  The purpose of the work of the DFO is to ensure that information is considered when the government is weighing projects which will impact habitat and endangered species. The decision by the JRP to ignore the DFO report is not only wasteful indifference; it’s a double-play failure and abrogation of the duty of both of your departments to protect endangered species and our natural environment.

I wish I could feign some measure of surprise on this matter. But like many Canadians, I have come to see this kind of negligence as not only a passing tendency of the Conservative government but as a very intentional aspect of the government’s resource and environmental policy.

When the government of Canada ignores its own science on endangered species protection, it’s no wonder why Canada has lost all credibility on environmental stewardship among both its own citizens and the international community.

Nathan Cullen

MP Skeena—Bulkley Valley

 

 

 
Copy of Nathan Cullen’s open letter on his website
 

 

New poll shows some people in Vancouver more in favour of Northern Gateway

A poll released this morning by Insights West, and already being heavily promoted by Enbridge Northern Gateway claims to show: “Opposition to the proposed Enbridge Northern Gateway Pipelines has subsided over the past 10 months in British Columbia, with the province’s residents now being staunchly divided on the project…”

It goes on to report:

In the online survey of a representative sample of British Columbians, support for the proposed Northern Gateway Pipelines stands at 42%, a seven-point increase since an Insights West poll conducted in February. Conversely, opposition to the project has dropped by 14 points, from 61% at the start of 2013 to 47% today.

It is important to note that the level of “strong opposition” to the project has fallen to 29% (down 9 points since February), while “strong support” increased to 16% (+5).

What the press release doesn’t tell you is that opposition to the Northern Gateway, according to the poll, is at 65 per cent in Northern British Columbia, with 50 per cent strongly opposed and 15 per cent somewhat opposed.

The Insight Poll assumes the findings of the online poll are within the usual margin of error

We have assumed that the same margins of error apply as if it were a true unweighted random probability sample with a margin of error of +/- 3.7 percentage points, nineteen times out of twenty.

The problem with the Insight West poll, like all other polls on the Northern Gateway, is that it is weighted toward the population heavy Lower Mainland. The tables released by Insight West show that the online poll had 504 respondents in Vancouver and 25 in Northern BC.

Northwest Coast Energy has spoken to pollsters both on the record and on background and it is clear that the polling entire province distorts the issue along the pipeline route.

The problems with these polls are two fold:

First is the standard polling definition of Northern British Columbia, which is based on Census data. “Northern BC” actually begins at Williams Lake, although most people believe Northern BC begins around Prince George.

Second the polls, due to small population and sample size, do not usually divide northwestern British Columbia, where the opposition is strongest to the Northern Gateway project, and northeastern British Columbia, where the energy industry is a major employer and support for the project is likely stronger.

The tables released by Insight West shows that poll surveyed just 25 people in “Northern British Columbia” but 504 in “Metro Vancouver.”

In a 2012 Ipsos Reid poll conducted on behalf of Enbridge, public affairs spokesperson Kyle Braid said their survey covered 168 people in “Northern British Columbia.” As Northwest Coast Energy News reported at the time:

Braid says the 168 people represents 17% of the sample. These interviews would have been weighted down to about 7% in the overall results to reflect the actual population of the North in BC. The margin of error in the North is about +/-7.6%, 19 times out of 20.

 

So with a total sample of 749 in the Insight West online poll and just 25 people in Northern BC surveyed, that means the Insight West poll survey of Northern BC covers just 3.3 per cent of the total sample. In contrast, 504 people in Vancouver were surveyed, accounting for 67.2 per cent of the sample.

The Insight West survey does acknowledge that:

British Columbians continue to be of two minds on the Northern Gateway,” continues Canseco. “There is a large proportion of the population that remains concerned with the possibility of oil spills and environmental problems, but the argument about economic benefits has gained traction over the past few months.

The actual tables show that of the 25 people surveyed in Northern BC, 50 per cent “strongly oppose,” (13 out of the 25 people surveyed) 15 per cent “somewhat oppose” Northern Gateway. Twelve per cent “somewhat support” the project, four per cent (one person) “strongly support” the project.

Those numbers, although small, are likely an accurate reflection of the sentiments in northern BC, although a breakdown between the western and eastern parts of Northern BC would have been helpful.

As for the residents of Vancouver, the poll shows that area is divided  (as the Insight West news release says) with 22 per cent strongly supporting (119 people) and 27 per cent somewhat supporting the project and 19 per cent somewhat opposed and 27 per cent strongly opposed (123 people).

You can see the poll tables here.

The “growing support” for the pipeline project that Enbridge is promoting from the poll likely shows that their advertising campaign is having some impact on the Lower Mainland but is ineffective in the north.

It is possible to do more accurate polling on energy issues in Northern British Columbia. Earlier this year, a significant number of Kitimat residents reported that they had received calls from a polling company representing TransCanada which will be building the Coastal GasLink pipeline project for LNG Canada, a project where Shell will operate the terminal in Kitimat.

On Monday, when TransCanada officials appeared before District of Kitimat council, they did acknowledge that they have been polling people along the pipeline route so they can understand their concerns.  So far, TransCanada has not released the results of that poll.

 

 

JRP refuses to consider latest DFO findings on Humpback Whales

The Northern Gateway Joint Review Panel has refused to consider the latest findings from the Department of Fisheries and Ocean on humpback whale critical habitat on the coast of British Columbia, including areas of ocean that could be on the route of tankers carrying diluted bitumen from Kitimat.

On October 21, 2013, Fisheries and Oceans released a report called Recovery Strategy for the North Pacific Humpback Whale (Megaptera novaeangliae) in Canada. The DFO report notes that humpback whales are a species of “special concern” by the Committee on the Status of Endangered Wildlife in Canada.

It is DFO policy to assist the humpback whale population to recover from the century of whaling that almost drove the species to extinction. The report identified four areas of “critical habitat” for humpbacks. One critical habitat zone is Gil Island at the mouth of Douglas Channel.

DFO map of humpback habitat
DFO map of humpback sightings on the BC coast. (DFO)

Last week, on November 13, Smithers based environmental activist Josette Weir filed a notice of motion with the JRP requesting that the panel consider the DFO report as late evidence.

Weir acknowledged that the JRP proceedings closed on June 24, after final arguments in Terrace, but she noted that rules allow the Board to override the final closure. She argued that the humpback report fell within the JRP’s mandate since the DFO report is “is likely to assist the Panel.”

Weir noted in her motion that there was insufficient information before the JRP that would identify critical humpback habitat.

She argued:

Three of the four critical known habitats are on the proposed tanker routes, and the Recovery Strategy acknowledges that other areas have not been identified. Without such information, it is impossible to assess the potential effects of the marine transport of bitumen on this endangered species.Activities likely to destroy or degrade critical habitat include vessel traffic, toxic spills, overfishing, seismic exploration, sonar and pile driving (i.e., activities that cause acoustic disturbance at levels that may affect foraging or communication, or result in the displacement of whales).

The report clearly identifies vessel traffic and toxic spills, which are associated with the Project as potential causes for destruction or degradation of the Humpback Whales’ critical habitat.

Weir went on to argue that the JRP had “insufficient information to develop relevant protection measures” because the humpback studies are ongoing, “meaning their results will not be available before decision.”

The Panel must consider this significant risk to an endangered listed species for which no meaningful protection measure can be offered against the risks associated with the Project.

Weir also noted that “No similar submission has been made by others, but I cannot predict if others will not see fit to do so.”

The JRP didn’t take long to reject Weir’s request, replying the next day, November 14.

In its response, the JRP cited the amended Joint Review Panel Agreement, signed after the passage of of the Jobs, Growth and Long-term Prosperity Act, the Omnibus Bill C-38, that “provides that the Panel’s recommendation report is to be submitted to the Minister of Natural Resources by 31 December 2013.”

The JRP then told Weir it didn’t have jurisdiction over endangered species (even if those species inhabit the tanker route) saying:

The Panel notes that the Recovery Strategy has been released in accordance with the provisions of the Species At Risk Act, as part of a legislative scheme that operates independently of this joint review process.

It goes on to say: “In this case, the Panel also notes that the Recovery Strategy was not authored by or for Ms. Wier.”

Map of Gil Island
Humpback whale sightings at the Gil Island critical habitat. (DFO)

The executive summary of the DFO report noted:

Critical habitat for Humpback Whales in B.C. has been identified to the extent possible, based on the best available information. At present, there is insufficient information to identify other areas of critical habitat or to provide further details on the features and attributes present within the boundaries of identified critical habitat. Activities likely to destroy or degrade critical habitat include vessel traffic, toxic spills, overfishing, seismic exploration, sonar and pile driving (i.e., activities that cause acoustic disturbance at levels that may affect foraging or
communication, or result in the displacement of whales). A schedule of studies has been included to address uncertainties and provide further details on the critical habitat feature(s), as well as identify additional areas of critical habitat. It is anticipated that results from these studies will also assist in development of relevant protection measures for the critical habitat feature(s).

In the part of the report on the danger of toxic spills to humpbacks, the DFO report mentions that sinking of the BC ferry Queen of the North:

Toxic spills have occurred impacting marine habitat along the B.C. coast. For example, the Nestucca oil spill (1988) resulted in 875 tonnes of oil spilled in Gray’s Harbor, Washington. Oil slicks from this spill drifted into Canadian waters, including Humpback Whale habitat. In 2006, a tanker ruptured in Howe Sound, B.C. spilling approximately 50 tonnes of bunker fuel into coastal waters. In 2007, a barge carrying vehicles and forestry equipment sank near the Robson Bight-Michael Bigg Ecological Reserve within the critical habitat for Northern Resident Killer Whales, spilling an estimated 200 litres of fuel. The barge and equipment (including a 10,000L
diesel tank) were recovered without incident. When the Queen of the North sank on March 22, 2006, with 225,000 L of diesel fuel, 15,000 L of light oil, 3,200 L of hydraulic fluid, and 3,200 of stern tube oil, it did so on the tanker route to Kitimat, which is currently the subject of a pipeline and port proposal and within the current boundaries of Humpback Whale critical habitat

The DFO report also takes a crtical look at vessel strikes

In B.C. waters, Humpback Whales are the most common species of cetacean struck by vessels, as reported to the Marine Mammal Response Network. Between 2001 and 2008, there were 21 reports of vessel strikes involving Humpback Whales. Of these, 15 were witnessed collision events while the remaining 6 were of live individuals documented with fresh injuries consistent with recent blunt force trauma or propeller lacerations from a vessel strike.

Overall, vessel strikes can cause injuries ranging from scarring to direct mortality of individual whales. Some stranded Humpback Whales that showed no obvious external trauma, have been shown from necropsy to have internal injuries consistent with vessel strikes… It is unknown how many whales have died as a result of vessel strikes in B.C. waters. To date, only one reported dead Humpback Whale presented with evidence consistent with blunt force trauma and lacerations resulting from a vessel strike…

There are no confirmed reports of Humpback Whale collisions in B.C. waters attributed to shipping, cruise ship or ferry traffic. However, larger ships are far less likely to detect the physical impact of a collision than smaller vessels, and this could account for the lack of reported strikes. Collisions with large vessels may be more common than reported, especially in areas where larger vessel traffic is concentrated.

Despite the fact that collisions may only affect a small proportion of the overall Humpback Whale population, vessel strikes may be a cause for concern for some local and seasonal areas of high ship traffic.. In B.C., areas of high probability of humpback-vessel interaction include Johnstone Strait off northeast Vancouver Island, Juan de Fuca Strait off southwest Vancouver Island, Dixon Entrance and the “Inside Passage” off the northern B.C. mainland which include portions of two of the identified critical habitat areas..

The JRP also said

As the Panel has mentioned previously during the hearing, the later in the joint review process that new evidence is sought to be filed the greater the likelihood of the prejudice to parties. The Panel is of the view that permitting the Recovery Strategy to be filed at this late stage in the hearing process would be prejudicial to the joint review process.

Weir’s submission to the JRP did not mention an academic study published on September 11, 2013, that also identified Gil Island as critical humpback habitat.

RELATED:

“Conservatives’ hatred for science intentional part of their environmental policy,” Cullen says

DOCUMENTS:

DFO report on Humpback Recovery strategy  (PDF)

Josette Weir notice of motion on Humpback Whales (PDF)

Panel Commission Ruling on Humpback Whales (PDF)

 

 

Defend our coast rally in Kitimat

Protest rally
Protesters march down Kingfisher Ave, during the Defend Our Coast Rally in Kitimat, Nov. 16, 2013. (Robin Rowland/Northwest Coast Energy News)

About 250 people took part in the Defend Our Coast Rally at Mount Elizabeth Secondary School, Saturday, Nov. 16, 2013. The Kitimat protest was part of what organizers said were 130 rallies across Canada to protest environmentally threatening energy developments including the Alberta bitumen sands and various pipeline projects under the labels of Defend Our Climate or Defend Our Coast.

 

Gerald Amos
Gerald Amos addresses the rally. (Robin Rowland/Northwest Coast Energy News)
Kelly Marsh
Kelly Marsh speaks about his studies that show small or mid-level pipeline breaches are inevitable. (Robin Rowland/Northwest Coast Energy News)
Protest
Family at the rally. (Robin Rowland/Northwest Coast Energy News)
Patricia Lange
Patricia Lange addresses the rally. (Robin Rowland/Northwest Coast Energy News)
Protesters join arms
Protesters join arms, a feature of every one of the rallies across Canada. (Robin Rowland/Northwest Coast Energy News)
Protest march
The protest march on Kingfisher. (Robin Rowland/Northwest Coast Energy News)
Protest march
The protest march. (Robin Rowland/Northwest Coast Energy News)

Cullen calls Clark Redford pipeline deal “a bust hand”

Skeena Bulkley Valley MP and NDP House leader is calling today’s framework deal between BC Premier Christy Clark and Alberta premier Alison Redford, “a bust hand.”

In a statement released late Tuesday, Cullen said:

MP Nathan Cullen called the BC-Alberta framework agreement struck this morning regarding Enbridge “political window-dressing” that draws a blind on truth and transparency and deals a bust hand to British Columbia.

“When it comes to the Enbridge Northern Gateway Pipeline, everything is negotiable for Christy Clark, including principals and promises made leading up to last May’s provincial election,” Cullen said.

“The reality is that none of the five conditions Ms. Clark made such a big deal about 16 months as being necessary for Enbridge to put a pipeline through our province were even remotely addressed in today’s announcement.

“The best we got after overnight negotiations and months of high drama is the ‘possibility of progress’ and a bizarre blessing that somehow allows BC to negotiate directly with Enbridge.

“Today’s agreement does absolutely zero to protect BC’s environment and economy from a bitumen disaster,” Cullen said.

“It’s a shameful political ploy that greases Ms. Clark’s real agenda, which is to pump oil through BC regardless of environmental or economic costs.

“Six months into a new mandate and Premier Clark has turned her back on promises to stand up for BC and demand a higher standard from industry.”

Cullen noted Enbridge’s social licence to operate is clearly tied to safe oil transport, effective spill response, and First Nations consent, conditions on which today’s agreement is silent.

Cullen vowed to continue fighting the Enbridge pipeline and to work toward sustainable resource development that is supported by Skeena-Bulkley Valley communities.