Moricetown band joins Pacific Trail Partnership, Kitimat LNG now has all First Nation councils on board

Chevron,  the lead corporation in the Kitimat LNG project announced on January 23 that the Moricetown Indian Band had agreed to join the First Nations Limited Partnership, in effect, approving the Pacific Trail Pipeline that would take natural gas to the project in Kitimat.

Here is the news release from all parties involved.

First Nations Limited PartnershipVancouver, British Columbia, January 23, 2015 – The First Nations Limited Partnership (FNLP) today announced that Moricetown Indian Band (Moricetown) has joined the FNLP. The FNLP is a commercial partnership that, with the addition of Moricetown, now includes all of the 16 First Nations whose traditional territory is located along the proposed 480 kilometre Pacific Trail Pipeline (PTP) route from Summit Lake to Kitimat, B.C.

“The decision of the Moricetown First Nation Band Council to join the First Nations Limited Partnership is one that we warmly welcome,” said the Honourable Bob Rae, Chairman of FNLP.

“It means all 16 First Nations along the proposed Pacific Trail Pipeline route are partners in a unique approach that combines environmental stewardship, extensive job, procurement, and other economic benefits, and direct financial transfers on a regular basis to each First Nations community.”

The FNLP is without precedent in the Canadian energy industry and the Pacific Trail Pipeline is the only proposed natural gas pipeline for a liquefied natural gas (LNG) facility in B.C. with such a benefits agreement. The proposed PTP and Kitimat LNG Facility projects are owned by Chevron and Apache through a 50/50 joint venture and are operated by Chevron.

“This agreement is unparalleled in balancing strong economic growth measures with preserving our cultural heritage and the environment. There is, quite simply, no other deal that comes close to what we’ve been able to achieve in this partnership,” said Chief Dan George of Ts’il Kaz Koh (Burns Lake).

The commercial partnership ensures that FNLP Nations receive immediate and long-term benefits from the PTP project. These include up to $550 million in direct financial benefits over the life of the PTP project, including a recent enhanced benefit of $10 million a year operating life of the PTP project from the Province of British Columbia. The FNLP Nations also receive substantial economic development, skills training, employment and contracting benefits from PTP under the terms of the agreement.

Chevron Logo“Chevron Canada wishes to commend all parties for creating a partnership between industry and First Nations based on mutual respect, trust and economic self-determination. We welcome Moricetown as the 16th member of the FNLP, and look forward to building the Pacific Trail Pipeline with First Nations in a manner that places the highest priority on protecting people and the environment,” said Jeff Lehrmann, President, Chevron Canada Limited.

Measures that reflect environmental protection, vitality of traditional cultural values, protection of aboriginal rights and title, economic self-determination and a sustainable future for First Nations are also part of the FNLP agreement. Members of the FNLP have already received significant benefits to date from the agreement, including $17 million in financial payments.

“We have already seen over 1,600 First Nations members receive skills training through the PTP Aboriginal Skills to Employment Partnership, better known as PTP ASEP. Over 900 of these trainees have found jobs,” said Chief Karen Ogen of the Wet’suwet’en First Nation.

First Nations employment currently accounts for 54 per cent of all early works construction workforce hours to date on the Pacific Trail Pipeline. To date, FNLP members have also been awarded over $245 million in PTP construction contracts, and over 65 per cent of construction contract expenditures have been made to member First Nation businesses.

The agreement also facilitates joint ventures between FNLP and companies engaged in the PTP Project. As such, the FNLP Nations not only have a clear financial interest in the pipeline construction but, just as importantly, also have a strong voice in ensuring the preservation of environmental and cultural integrity.

“The FNLP is an innovative model for how industry and First Nations can cooperate effectively with respect to major economic development projects,” said the Honourable Bob Rae.
About First Nations (PTP) Group Limited Partnership (FNLP)

The First Nations (PTP) Group Limited Partnership (FNLP) is a limited partnership of 16 First Nations whose traditional territories are located along the transportation corridor between Summit Lake and Kitimat, British Columbia.

FNLP was formed to secure significant, reliable and long-term economic benefits for its limited partners from the proposed PTP Project.

FNLP member Nations are:

* Haisla Nation
* Kitselas First Nation
* Lax Kw’alaams Band
* Lheidleh T’eneh First Nation
* McLeod Lake Indian Band
* Metlakatla First Nation
* Moricetown Indian Band
* Nadleh Whut’en First Nation
* Nak’azdli Band
* Nee Tahi Buhn Indian Band
* Saik’uz First Nation
* Skin Tyee First Nation
* Stellat’en First Nation
* Ts’il Kaz Koh First Nation (Burns Lake Indian Band)
* West Moberly First Nations
* Wet’suwet’en First Nation
About PTP and the Pacific Trail Pipelines Limited Partnership

The proposed 480-kilometre Pacific Trail Pipeline Project is jointly owned by Chevron Canada Limited (Chevron) and Apache Canada Ltd. (Apache) through the Pacific Trail Pipelines Limited Partnership (PTPLP). The PTP is intended to deliver natural gas from Summit Lake

B.C. to the proposed Kitimat LNG facility on B.C.’s north coast. The Pacific Trail Pipelines Limited Partnership (PTPLP) acquired the project in February 2011 from Pacific Northern Gas.

 

The fact that the Moricetown Band had held out for so long was seen as one of several factors that was holding up a Final Investment Decision by Chevron and its soon to be new partner, Australia’s Woodside Pretroleum, which is currently finalizing a deal to buy Apache’s stake in the project. Chevron vice chairman, George Kirkland was asked about it during an investor conference call in August, 2014 At the time,  Kirkland hinted at the potential problems with the Pacific Trails Pipeline, where there is still a dispute with members of the Wet’suwet’en First Nation. “We’re going to focus on the pipeline and the end of the pipeline corridor. That’s important and we’re putting some money into that to finalize the pipeline routing, get all our clearances and then we’ve got work going on.”

The Unist’ot’en Camp group which opposes energy development in the traditional territory of that House has not yet commented on the announcement. However, earlier Friday at a protest in Winnipeg, Freda Huson, Spokesperson for the Unist’ot’en People and Hereditary Chief Toghestiy of the Likhts´amisyu Clan, issued this statement.

¨The Hereditary Chiefs of the Wet´suwet´en People will stop all attempts from Pipeline Companies, Colonial Governments, and their sell-out employees from bringing Tar Sands Bitumen or Fracked Gas onto our lands. We have ancestral integrity which guides us and will help us ensure that we make the right decisions to protect our lands for all of our unborn generations. We will hold ALL those accountable for attempting to enable destructive agendas to take hold on our sacred lands. We will use our traditional governing systems, the colonial courts, grassroots Indigenous Peoples, and our media savy to make everyone associated with Pipelines, Tar Sands, and Fracking activity from affecting our unceded lands. We are armed with our indomitable spirit and 2 Supreme Court of Canada decisions and will use them against any more aggressors on our unceded lands. Consider this a warning for attempting to trespass on our homelands. We have defended our lands for countless generations and we will stand up like our ancestors have to ensure that we never are viewed as weak in the eyes of our ancestors or children.

Photo op or engagement? How the Harper government failed in the northwest

Bear totem at UNBC
The bear totem at the University of Northern British Columbia, one of the backdrops considered by Natural Resources for an announcement by Joe Oliver. (UNBC)

If anyone wanted a snapshot (or for younger folks a selfie) of why the Harper government grounded out at home, never even getting to first base  with northwestern British Columbia on Northern Gateway and other resource projects, it can be found in about sixty pages of  documents, obtained by Northwest Coast Energy News under the Access to Information Act, documents that outline the planning for former Natural Resources Minister Joe Oliver’s first visit to Terrace in March 2013

  • The documents reveal the priority for Natural Resources communications staff was mainly finding an appropriate First Nations visual backdrop for Oliver’s speech announcing the appointment of Douglas Eyford as special representative to First Nations, the Harper government’s attempt to smooth relations as it dawned on the government that opposition to Northern Gateway wasn’t just going to disappear.
  • Despite years of media coverage from both those opposed to and even those who support the Northern Gateway project that highest priority issue was preventing oil spills whether from tankers or pipelines, the Ottawa-based communications planners in Natural Resources Canada were talking about how aboriginal and non-aboriginal communities could respond to oil spills.
  • For an event that was supposed to engage the First Nations of coastal British Columbia and gain their support for resource projects, all the economic examples are about Alberta First Nations who are working the extraction of bitumen in Alberta, there are no example of how BC First Nations might profit from Northern Gateway (that is if any BC First Nations actually wanted to do so)
  • A visit to Kitimat, the centre of the debate, wasn’t even on the radar in March, 2013, as Joe Oliver, then Minister of Natural Resources, even though Kitimat is just a 40 minute drive from the site of the announcement at the Terrace campus of Northwest Community College.

When Natural Resources Canada started planning Joe Oliver’s announcement they created what was called a “Message Event Proposal” which even in its title shows how the government and the communications staff think. The message is more important than the event.

Northwest Coast Energy News
Finding a background with a First Nations focus was a high priority for Natural Resources Canada in choosing Northwest Community College in Terrace for an announcement by Minister Joe Oliver on March 19, 2013. (Robin Rowland/Northwest Coast Energy News)

The planning documents from Natural Resources, starting on March 5, 2013, indicate that from the beginning the announcement was being treated as a photo op. Invitations to or participation by “stakeholders” are listed as N/A “not applicable,” which meant that meetings, even private meetings, with representatives of northwestern First Nations and other communities either weren’t considered or the communications staff weren’t informed. (If there were such plans they were not part of the access documents released and as far as Northwest Coast Energy News can find out no meetings took place since Oliver left for Ottawa immediately after the announcement)

The documents show that there were no plans to involve "stakeholders" in Joe Oliver's announcement.
The documents show that there were no plans to involve “stakeholders” in Joe Oliver’s announcement.

The Natural Resources communications staff were working on multiple angles in March, as part of what the planning documents call “a suite of events in Vancouver on marine and pipeline safety.”

The first set of those events would eventually take place on March 18, 2013, in Vancouver, and included the announcement, without consulting either Rio Tinto Alcan or the District, that Kitimat’s private port run by Alcan since it was first built would be turned in a federal public port.

The announcement of Eyford’s appointment  would eventually take place at the Waap Galts’ap community long house at Northwest Community College in Terrace on the morning of March 19.

That location certainly wasn’t clear at first. The first documents suggested the announcement take place in Vancouver, and then a day later on March 6, the proposed venue, according to the staff, was in either Prince Rupert or Prince George.

According to the internal e-mails, sometime that week what Ottawa bureaucrats call MINO — the minister’s office– decided that the venue should be Terrace. On March 11, e-mails among Natural Resources staff show that the choice had changed to either Terrace or Prince George.

Since the “special representative” whom we now know would be Douglas Eyford, would report directly to Prime Minister Stephen Harper, the political level was involved.  MINO took over writing Oliver’s speech and the arrangements were copied to the Privy Council Office, the civil service branch that has overall supervision of the federal bureaucrats and works directly with the Prime Minister. So the speech that the communications branch had drafted for Oliver became “can please turn the one we had done for him into the remarks for the new guy?”

Plan B in Prince George

The choice of Terrace left the Natural Resources Ottawa staff hedging their bets, looking for a “potential plan B” in Prince George. The e-mails indicate that Ottawa asked  Natural Resources west coast communications officer for a list of suitable locations in Prince George.

The communications officer replied with three locations at the University of Northern British Columbia “a moving bear totem on campus” the main administration building which the e-mail said “ has a strong First Nations focus,” adding  “Environment Canada has done…events there. Strong FN visuals.” The third choice was “a new bio energy facility that looks industrial.”

Backups were The College of New Caledonia trade centre and the Prince George industrial park.

UNBC adminstration building
Natural Resources Canada also considered the “strong First Nations visuals” at the University of Northern British Columbia administration building. (UNBC)

NRCan email

 

UNBC bioenergy lab
The University of Northern British Columbia’s bioenergy facility. (UNBC)

E-mails from the staff on Wednesday, March 14 and Thursday, March 15, showed while they were now aware the event would be in Terrace, and probably at Northwest Community College, there was still a lot of uncertainty. “We haven’t been able to contact them to confirm, but as soon as we do, we will let you know the exact details as well as what is required in terms of logistics.”

Remembering that Natural Resources and Transport Canada were also planning the Vancouver event on Monday, March 18, it appears that even as Oliver arrived on the morning of March 19, the minister’s staff both political and bureaucratic were still scrambling.

On March 19, the NWCC staff on site were complaining that as soon as the Ottawa delegation saw the standard arrangements for an event at the Waap Galts’ap community long house they ordered the NWCC staff to immediately rearrange the room, so that the podium was in front of one wall with what Oliver’s staff thought was a better First Nations painting. That rearranging was still going on when I arrived to cover the announcement.

Joe Oliver
Joe Oliver tries out a heavy equipment simulator at Northwest Community College on March 19, 2013, prior to his speech. (Robin Rowland/Northwest Coast Energy News)

Even after the furniture was rearranged, the start was delayed as Oliver and his staff disappeared into an upstairs room for a meeting before the news conference began, and Oliver announced Eyford’s appointment.

During the question and answer session with the media during the news conference, the students that had essentially been brought in as props for the photo op and to help promote Northwest Community College’s industrial training program, began to ask questions.

news conference
Joe Oliver listens to a question from a student at the Northwest Community College news conference. (Robin Rowland/Northwest Coast Energy News)

One student asked Oliver if Eyford’s appointment was going to replace “all talks” with First Nations about resource projects. The Natural Resources public relations staff tried to cut off one student, since the national media were waiting on a telephone conference call. To his credit, Oliver did answer the student’s question, saying Eyford’s appointment was not intended to “replace the independent, regulatory review.” He went on to explain the Northern Gateway Joint Review would continue its work and report at the end of 2013.

What was Ottawa thinking? You too, can respond to an oil spill.

If the aim was to engage the First Nations and other residents of northwestern BC, it is clear that the concerns of this region hadn’t reached out Ottawa.

It appears from the planning documents for Joe Oliver’s trip to Terrace, that a main concern of everyone in the northwest, aboriginal and non-aboriginal, opponents and supporters of the Northern Gateway pipeline, preventing oil spills also wasn’t on the government radar, rather it was preparing and responding to oil spills.

Guess who would respond?

As part of the measures to strengthen Canada’s Marine Oil Spill Preparedness and Response Regime, the Government of Canada will strengthen the engagement and involvement of Aboriginal and non-aboriginal communities in preparing for and responding to oil spills.

oilspill

When it comes to a key section on benefits from the Northern Gateway and other resource projects, there is no mention of benefits to British Columbia; rather it appears all the examples of benefits for aboriginal communities come from Alberta, including $1.3 billion in contract work for oil sands companies not including construction, for the year 2010, and $5 billion since 2001. The Message Event Proposal also cites a joint venture between the Bigstone Cree and Bronco Energy, “the biggest oil sands project every undertaken on First Nations reserve lands.”

economicbenefit

Overall the plan was to “Promote Canada’s commitment to achieving its goals under its plan for Responsible Resource Development, including increased consultations with Aboriginal peoples.”

The “media lines’ issued by Natural Resources also outlined the Harper government’s attitude to the Northern Gateway, noting that Eyford’s appointment was independent of the Northern Gateway Joint Review, and went to indicate that the JRP was “conducting a rigorous, extensive, open, science-based assessment.” It adds that “we will continue to rely on the integrity of this process,” again showing how out of touch Natural Resources was (at least in talking points) since by March 2013, there was growing consensus in the northwest that the JRP had lost its credibility.gateway1
gateway2

The media lines also show that the Harper government believed that “Aboriginal consultations are fully integrated into the review process to ensure meaningful consultation occurs,” a position that most First Nations in British Columbia reject, insisting on meaningful consultations between the Crown and the First Nation.

consultation1

When Eyford presented his report to the Prime Minister in December, 2013, Eyford called for stronger action to engage First Nations opposed to new oil and gas pipelines.

“It’s never too late to engage and do so in a process of good faith negotiations… “This won’t be an easy process. I hope my report is perceived as providing objective and blunt advice to all the parties engaged in this process.’’

The 53 page report contained dozens of recommendations mainly concerned with a more open and principled dialogue with First Nations.

“The development of West Coast energy infrastructure provides an opportunity to forge partnerships and build relationships. There is a strong interest and real opportunity for Canada and aboriginal Canadians to more effectively collaborate to address their respective interests.’’

Editor’s note:  On the port issue, an RTA spokesperson noted that talks with the federal government are continuing. He noted that all the Kitimat port facilities are privately owned, by Rio Tinto Alcan or by LNG Canada and there are “multiple stakeholders” involved.

Documents

Natural Resources Media Lines  (pdf)

Natural Resources Message Event Proposal  (pdf)

Forging Trust Douglas Eyford’s final report  (pdf)

Related Links

Joe Oliver makes flying visit, meets Haisla, snubs Kitimat (almost)

Harper government to District of Kitmat Drop Dead

Phil Germuth, Enbridge’s “What the….” moment and what it means for British Columbia

Phil Germuth
Councillor Phil Germuth questions Northern Gateway officials about their plans for leak detection, Feb. 17, 2014 (Robin Rowland/Northwest Coast Energy News)

Enbridge Northern Gateway officials are loath (to put it mildly) to speak to the media but sometimes they let things slip. Earlier this summer, at a social event, I heard an Enbridge official (probably inadvertently) reveal that when the company’s engineers came before District of Kitimat Council earlier this year they were surprised and somewhat unprepared to fully answer the detailed technical questions from Councillor Phil Germuth on pipeline leak detection.

In January, 2015, Phil Germuth will take the centre chair as mayor at the Kitimat Council Chambers.

The results of the municipal election in Kitimat, and elsewhere across BC show one clear message; voters do want industrial development in their communities, but not at any price. Communities are no longer prepared to be drive by casualties for giant corporations on their road to shareholder value.

The federal Conservatives and the BC provincial Liberals have, up until now, successfully used the “all or nothing thinking” argument. That argument is: You either accept everything a project proponent wants, whether in the mining or energy sectors,  or you are against all development. Psychologists will tell you that “all or nothing thinking” only leads to personal defeat and depression. In politics, especially in an age of attack ads and polarization, the all or nothing thinking strategy often works. Saturday’s results, however, show that at least at the municipal level,  the all or nothing argument is a political loser. Where “all politics is local” the majority of people are aware of the details of the issues and reject black and white thinking.

Ray Philpenko
Northern Gateway’s Ray Philpenko gives a presentation on pipeline leak detection to Kitimat Council, Feb. 17. 2014. (Robin Rowland/Northwest Coast Energy News)

The Enbridge official went on to say that for their company observers, Germuth’s questions were a “what the…..” moment.  As in “what the …..” is this small town councillor doing challenging our expertise?

But then Enbridge (and the other pipeline companies) have always tended to under estimate the intelligence of people who live along the route of proposed projects whether in British Columbia or elsewhere in North America, preferring to either ignore or demonize opponents and to lump skeptics into the opponent camp. The Northern Gateway Joint Review Panel also lost credibility when it accepted most of Northern Gateway’s arguments at face value while saying “what the ……” do these amateurs living along the pipeline route know?

Pro Development

“I am pro-development,” Germuth proclaimed to reporters in Kitimat on Saturday night after his landslide victory in his campaign for mayor.

On the issue of leak detection, over a period of two years, Germuth did his homework, checked his facts and looked for the best technology on leak detection for pipelines. That’s a crucial issue here where pipelines cross hundreds of kilometres of wilderness and there just aren’t the people around to notice something is amiss (as the people of Marshall, Michigan wondered at the time of the Line 6B breach back in 2010). Enbridge should have been prepared; Germuth first raised public questions about leak detection at a public forum in August 2012. In February 2014, after another eighteen months of research, he was ready to cross-examine, as much as possible under council rules of procedure. Enbridge fumbled the answers.

So that’s the kind of politician that will be mayor of Kitimat for the next four years, technically astute, pro-development but skeptical of corporate promises and determined to protect the environment.

Across the province, despite obstacles to opposition set up by the federal and provincial governments, proponents are now in for a tougher time (something that some companies will actually welcome since it raises the standards for development).

We see similar results in key votes in British Columbia. In Vancouver, Gregor Roberston, despite some problems with policies in some neighborhoods, won re-election on his green and anti-tankers platform. In Burnaby, Derek Corrigan handily won re-election and has already repeated his determination to stop the twinning of the Kinder Morgan pipeline through his town. In Prince Rupert, Lee Brain defeated incumbent Jack Musselman. Brain, who has on the ground experience working at an oil refinery in India, supports LNG development but has also been vocal in his opposition to Northern Gateway.

The new mayor in Terrace Carol Leclerc is an unknown factor, a former candidate for the BC Liberal party, who campaigned mainly on local issues. In the Terrace debate she refused to be pinned down on whether or not she supported Northern Gateway, saying,  “Do I see Enbridge going ahead? Not a hope,” but later adding, “I’d go with a pipeline before I’d go with a rail car.”

 

election signs
Kitimat election signs. (Robin Rowland/Northwest Coast Energy News)

Plebiscite confirmed

Kitimat’s mayor and council elections also confirm that Northern Gateway plebiscite vote last April. Kitimat wants industrial development but not at the price of the community and the environment. The unofficial pro-development slate lost. A last minute attempt to smear Germuth on social media was quickly shot down by people from all sides of the Kitimat debate. Smears don’t usually work in small towns where everyone knows everyone.

Larry Walker, an environmentalist with a track record in municipal politics as an alderman in Spruce Grove, Alberta, won a seat. Together with Rob Goffinet and Germuth, that is three solid votes for the environment. The other new councillor is Claire Rattee who will be one to watch. Will the rookie be the swing vote as Corinne Scott was?

Mario Feldhoff who came to third to Goffinet in the overall vote (Edwin Empinado was second) is a solid councillor with a strong reputation for doing his homework and attention to detail and the unofficial leader of the side more inclined to support development. Feldhoff got votes from all sides in the community.

During the debates, Feldhoff repeated his position that he supports David Black’s Kitimat Clean refinery. But as an accountant, Feldhoff will have to realize that Black’s plan, which many commentators say was economically doubtful with oil at $110 a barrel, is impractical with oil at $78 a barrel for Brent Crude and expected to fall farther. Any idea of a refinery bringing jobs to Kitimat will have to be put on hold for now.

LNG projects are also dependent on the volatility and uncertainty in the marketplace. The companies involved keep postponing the all important Final Investment Decisions.

There are also Kitimat specific issues to deal with. What happens to the airshed, now and in the future? Access to the ocean remains a big issue. RTA’s gift of land on Minette Bay is a step in the right direction, but while estuary land is great for camping, canoeing and nature lovers, it is not a beach. There is still the need for a well-managed marina and boat launch that will be open and available to everyone in the valley.

Germuth will have to unite a sometimes contentious council to ensure Kitimat’s future prosperity without giving up the skepticism necessary when corporations sit on a table facing council on a Monday night, trying to sell their latest projects. That all means that Germuth has his job cut out for him over the next four years.

Apache still looking for buyer for Kitimat LNG stake

Apache Corp is still looking for a buyer for its stake in the Kitimat LNG project,  company CEO Steven Farris told investors Thursday as the company reported its third quarter results. Farris gave no details, just telling an investor conference call, that as he reported during the second quarter call, that company intends to “completely exit” both the Kitimat LNG project and the Wheatstone LNG project in Australia.Apache Corporation

 

All Farris would say is, “We have lots of people working on the projects to do just that.”

At that same time, Apache is still spending money on the Kitimat project. The quarterly report says that Apache spent $151 million on the project in the third quarter, and a total of $498 million so far this year. That includes an equity investment in the Pacific Trail Pipelines $15 million in the third quarter and $44 million so far this year.

Chevron, Apache’s partner continues to work on the Kitimat project.

Editorial Part II:Commodities dropping: Whether it is a correction or a cyclical downturn, Kitimat needs a plan B

You might not be seeing it at the gas pumps at the moment, but you soon will, the price of gas has gone down by 30 per cent since June.

Prices of key commodities, oil, coal and iron ore are dropping. And the weakness in the market for two of those commodities oil and iron ore should be setting off the alarm bells in Kitimat and the northwest.

The declining price of oil will soon affect all those energy-related projects that are supposed to bring an economic renaissance to northwest British Columbia.

As for iron ore, people might ask, what does iron ore have to do with us, there are no iron mines or steel mills around here.? However, in the highly integrated world economy, Rio Tinto is one of the world’s largest producers of iron ore, the decline in iron ore prices is affecting Rio Tinto’s bottom line and that is why, analysts say, the company may be vulnerable to a take over by the little known commodities giant Glencore.

There are two possibilities with commodity prices. Some analysts see the decline in commodity prices and the accompanying drop in prices on the world’s stock exchanges as a “correction” phase. However, others like Reuters analyst John Kemp says the downturn is an indication that the commodities “supercycle” has reached its peak and is on the way down.

The oil industry has always experienced very long, slow and deep cycles in supply, demand and prices: the current downturn is no exception.

Kemp says the current up cycle began around 2002, with rising oil prices. The financial collapse in 2007 and 2008 briefly interrupted the cycle but now according to Kemp and other analysts there is a glut of oil on the market and prices are falling world wide.

High prices meant not only new plays, especially in the Alberta bitumen sands, but also stronger efforts to save money by increasing energy efficiency and, yes, turning to cheap natural gas.

There are also new factors at play. In the past when there was a downturn in oil prices, OPEC led by Saudi Arabia, would limit supply to keep the price at a profitable level. However, the flood of oil on to the market from shale oil plays, mainly in the United States but also in Canada, has meant that OPEC can’t do that anymore. Too much competition. So the analysts say, the Saudis and other OPEC members are actually starting a price war to retain market share.
When Kemp was writing last week, he said the key marker, North Sea Brent crude:

if prices are adjusted for inflation (using average U.S. hourly earnings), Brent prices are at the lowest level in real terms since October 2007, exactly seven years ago.

There has always been a lot of skepticism among long term residents of Kitimat who have seen boom and bust cycles before and so they, rightly as it turns out, have been wary of industrial promises. Then there’s the current housing debate which may soon see the out of region speculators and developers caught with their pants down in the midst of a Kitimat January blizzard.

The commodity downturn also shows the foolishness of the politicians, business people and commentators who kept saying that BC is a “natural resource economy” and restrictions on corporations and strong environmental requlations will only hurt that economy. Who needs diversification? Who needs a fishing guide anway? It is fairly clear already that Christy Clark’s promises of a debt free province have as much credibility as speculating in Dutch tulip bulbs.

As for the idea among some here that if Kitimat had only voted in favour of Enbridge Northern Gateway, the gates to ecomonic paradise would open, that is foolishness. You can be certain when the Saudi princes decided on a price war to keep themselves in the luxorious lifestyle which they believe they are entitled, they didn’t consider whether Kitimat voted for or against Northern Gateway.

Editorial Part I: Kitimat needs a world class council

So what does Kitimat need to know

The nail in the coffin for Northern Gateway?

The Northern Gateway project was already in deep trouble before the downturn in oil prices.

Writing in The Globe and Mail last week, Jeff Rubin noted.

Part of the impetus behind constructing new pipelines to carry bitumen from northern Alberta to the U.S. Gulf Coast, Kitimat on the Pacific, or even all the way across the country to Saint John, N.B., was to help close the substantial discount between Canadian oil and world prices. Well, crude’s recent drop into the $85‑a‑barrel range has basically collapsed the once wide‑open spread that had existed between West Texas Intermediate and Brent crude with hardly any new lengths of pipe being laid into the ground at all.

Rubin went on to note that the decision by the Saudis to launch the price war has changed everything.

For pipeline companies with major proposals on the table, such as TransCanada and Enbridge, falling oil prices are a game‑changer of the same magnitude that rising prices were a decade ago. Back then, soaring prices created an urgent need to build new pipelines to connect North America’s burgeoning supply to coastal refineries and world markets.

We’re now in a different world. At the root of today’s problem is global demand that is no longer growing quickly enough to support the prices necessary to keep expanding expensive unconventional sources of supply such as the oil sands. Lower prices will effectively strand those reserves regardless of the transportation options that may become available. Even if President Obama approved Keystone XL or the National Energy Board gave the green light to Energy East, falling commodity prices mean that soon there might not be enough oil flowing out of northern Alberta to fill those new pipelines.

This week’s near disaster with the Russian container ship Simushir, where the coast of Haida Gwaii was saved by a change in the wind direction, hasn’t helped either.

Will the refinery fade to black?

Economists have always been skeptical about David Black’s plan for the Kitimat Clean refinery and Black has admitted that he also had not much support for the refinery idea either from the hydrocarbon indusry or from government.

Most important, Black has said that he as a businessman intends to eventually make a profit by selling refined product. In fact on his website, Black said he expected the refinery to go into profit after just seven  to ten years of operation.

But now comes the flaw in Black’s business plan. According to the website, the Kitimat Clean project is based on North Sea Brent Crude priced at $110 US a barrel. The refinery would take advantage of the “discount” on deliveries of Alberta bitumen crude which the site estimated at $35 a barrel. Black’s site says the refinery would be profitable if it could purchase bitumen at a $23 discount, making $12 a barrel over the world price.

Unfortunately, as of this writing, 11 am on October 20, the price of Brent Crude is now $85.79 and dropping slightly. West Texas Intermediate Crude, the other bench mark is even lower at $82.79 a barrel.

It looks like the drop in oil prices wipes out Black’s plan for profitability, since Brent Crude is already $25 a barrel cheaper than Black had projected.

What’s that got to do with the price of gas?

The falling price of crude oil is also going to have a major impact on the liquified natural gas projects in the northwest. The current economic situation will soon see the short term players and speculators cut and run, leaving, it is hoped, a couple of long term players in the west coast LNG terminal market. However the volatility in the dropping oil market may mean that the all important Final Investment Decisions are delayed yet again.

That’s because, at the moment, in Asia, the price of natural gas is calculated as a per centage of the price of crude oil, what is called the Japan Cleared Customs price. And as the LNG Journal has reported the price of LNG in Japan has dropped to the 2009 level.

 East Asian Delivered LNG Indicator Price hit its lowest level since 2009 at $12.30 million British thermal units with European Brent crude oil prices collapsing to $82.85 per barrel. The East Asia LNG price is based on the Japanese Crude Cocktail method of assessing long-term contract cargo prices for Japan, based on oil which last hit current levels and then slipped below $80.00 per barrel during 2009.

The idea of LNG exports, especially since the Japanese earthquake in 2011, is that the companies can make a big profit by buying natural gas at low North American prices, exporting and then selling at the higher Asia price. In a free market world, however, the Asian countries and companies have, for the past few years been balking at buying at the higher JCC price and attempting to buy at the much lower North American Henry Hub price which at this writing was $3.72 MMBTu. Today’s JCC LNG price was $12.75, still higher than the North American price, but as LNG Journal notes, at a five year low.

Bloomberg reports that slump in oil prices is already threatening the Northwest’s greatest rival in LNG, Australia.

Weaker oil prices may put proposed LNG projects “to sleep for a number of years,” Fereidun Fesharaki, chairman of Facts Global Energy, an industry consultant, said in a phone interview. “For the projects that are already under construction, it hits their pocketbooks seriously.”

Prices below $80 a barrel may be a “disaster” for some projects, said Fesharaki, who forecasts Brent may decline to $60 a barrel before the end of the year, then rebound to about $80 by the end of 2015.

and

“There’s no doubt if we were to see the type of crude oil prices we’re seeing now continue they would be looking at lower LNG prices,” Daniel Hynes, senior commodity strategist at Australia and New Zealand Banking Group Ltd., said by phone. “On face value, it would put pressure on margins.”

Long term LNG prospects

On the other hand, long term prospects for LNG exports are good. Demand in the Asian markets is still growing.

LNGpricesAccording to the Nikkei Asian Review, the Japanese  Ministry of Economy, Trade and Industry projects that by 2020, 70 per cent of Japan’s LNG will come from Australia and North America. That doesn’t mean that Canada won’t have rivals, the projections say that the United States, which is just starting many of its LNG export projects could be Japan’s third largest customer with Canada in fourth place.

There are big benefits to getting LNG from North America and Australia. The unlikeliness of pirate attacks is one. There is also less political uncertainty. And then there is the price. U.S. shale gas, for example, costs about 20% less than what Japan currently pays for LNG.

Diversification

With the Rio Tinto Alcan Kitimat Modernization Project construction phase winding down, with some uncertainty about the future of Rio Tinto itself and with more possible delays in the Final Investment Decisions for LNG Canada and Kitimat LNG, Kitimat needs a Plan B (and a Plan C or D or E).

The idea of a retirement community is no longer viable, costs of housing, even if they drop, are just too great.

Kitimat’s second strength has always been tourism and fishing. In 2015, there must be stronger efforts of support both fishing and tourism, which, in the long term will support that regions economy through good times and bad.

That means the new council must be firm in demanding (yes demanding) full access to the Kitimat waterfront and that includes a well-managed marina or marinas that have the capacity for recreational, adventure and fishing guiding and industrial use.

The District of Kitimat must come up with a plan that will promote the advantages of the region as a tourist and fishing destination. While the Chamber of Commerce has being doing a good job, up to now as the main promoter of tourism, Kitimat’s public image across Canada and the world is soley industrial and the District should assume more responsiblity for changing that image. The economic development staff at the district have been working largely on large scale industry. It should devote more time and money to the natural wonders of the area.

The plan B should also mean balance. Balance between industry and environment. The sneering contempt for those who want to protect the environment of the northwest is short sighted thinking, because a large proportion of the economy will depend for decades to come on attracting visitors to the wild beauty of of this part of British Columbia. That means, as much as it can within municipal powers, the new council must strengthen environmental protection in Kitimat.

Back in the 50s, Kitimat was planned for a future, a future that didn’t exactly work out when the price of aluminum slumped in the early 60s. Now we’re facing a slump in energy prices, so those plans will change. The plan B must include, as much as possible, creating a mainstay base that will smooth out the boom and bust of the commodities cycle.

The motto on the Kitimat snowflake logo is “A marvel of nature and industry.” The new council should make sure that motto is applied during the coming years.

Sending the Northern Gateway Pipeline to Prince Rupert: A dumb, dumb, dumb idea—and here are the photos to prove it.

There’s a dumb, dumb, really dumb idea that just won’t go away—that Enbridge could solve all its problems if only, if only, it would send the Northern Gateway Pipeline to Prince Rupert.

Enbridge long ago rejected the idea. Before Enbridge updated its website to make  Gateway Facts, to make it slick and more attractive, the old website had an FAQ where Enbridge explained why it wasn’t going to Prince Rupert.

Did you consider running the pipeline to Prince Rupert where a major port already exists?

We considered Prince Rupert and Kitimat as possible locations. We carried out a feasibility study that took into account a number of considerations. The study found that the routes to Prince Rupert were too steep to safely run the pipeline, and that Kitimat was the best and safest option available.

Current proposed route for the Northern Gateway pipeline. (Enbridge)
Current proposed route for the Northern Gateway pipeline. (Enbridge)

Here in the northwest even the supporters of the Northern Gateway roll their eyes when they hear the old Prince Rupert story come up again and again – and it’s not just because these people support the Kitimat plans for Northern Gateway, it’s because those supporters (not to mention the opponents) have driven along the Skeena from Terrace to Prince Rupert.

There just isn’t any room for a pipeline. It’s a game of centimetres.

A rainbow hugs the mountains near the Telegraph Point rest area on the Skeena River between Terrace and Prince Rupert, Sept. 29, 2014.  Traffic is seen on the narrow corridor between the mountains and the river (Robin Rowland/Northwest Coast Energy News)
A rainbow hugs the mountains near the Telegraph Point rest area on the Skeena River between Terrace and Prince Rupert, Sept. 29, 2014. Traffic is seen on the narrow corridor between the mountains and the river (Robin Rowland/Northwest Coast Energy News)

Alternatives to Kitimat?

Now the new premier of Alberta, Jim Prentice, who should know better if he’s going to lead that province, is hinting that Kitimat isn’t the only possible solution for the Northern Gateway.

Without specifying Prince Rupert, according to Gary Mason reporting in The Globe and Mail, Prentice was speculating about an alternative to Kitimat.

Asked whether he believes the Gateway terminus should be relocated to Prince Rupert or another destination, Mr. Prentice said, “Everything I’ve heard from the Haisla who live there is they don’t agree with the terminal being in Kitimat.” Is it possible to get First Nations approval if there is no support at the planned terminus site? “It’s pretty tough,” the Premier said.

A couple of days ago, the Prince Rupert’s Mayor Jack Mussallem told The Globe and Mail in Mayor, port authority say no room for Northern Gateway pipeline in Prince Rupert

Prince Rupert has a thriving local fishing industry that employs hundreds of people and is critically important to the local First Nations. He is convinced the community would not be willing to put that at risk.
“Overwhelmingly people in my community are much more comfortable with liquefied natural gas, with wood pellets, with coal, than any oil product,” he said.

The Prince Rupert Port Authority also rejected the idea

A spokesman for the Prince Rupert Port Authority said Wednesday there is currently no room for Enbridge to build at the port even if it wanted to. “We are fully subscribed,” Michael Gurney said. There are two large vacant lots within the port authority’s jurisdiction, but both are locked by other energy companies, earmarked for LNG projects.

So not only is there no room on the road to Prince Rupert, there is no room in Prince Rupert.

Shovel-ready?

Let’s just consider for a moment that if Prince Rupert was the ideal location for the Northern Gateway terminal (which it is not), what would be needed to get the project going today.

The Northern Gateway Joint Review Panel would have be reconstituted or a new JRP created by the National Energy Board. That’s because the bitumen comes from Bruderheim, Alberta, crossing provincial boundaries and thus it’s in federal jurisdiction.

Even under the fast track rules imposed on the NEB by Stephen Harper’s Conservative government, new environmental and social impact studies would be required, starting from scratch. So add another five years of paperwork before a single shovel goes into the ground.

The pipeline would have to cross the traditional territory of First Nations that, so far, have not been part of the negotiations, mostly the Tsimshian First Nation as well as the Nisga’a First Nation which has a treaty establishing local rule over their territory.

Traditional leaders of the Gitga'at First Nation lead a protest march through the streets of Prince Rupert, February 4, 2012. (Robin Rowland/Northwest Coast Energy News)
Traditional leaders of the Gitga’at First Nation lead a protest march through the streets of Prince Rupert, February 4, 2012. (Robin Rowland/Northwest Coast Energy News)

In February 2012, the largest anti-Enbridge demonstration outside of the Lower Mainland took place in Prince Rupert, with the elders of the Tsimshian First Nation welcoming the elders and members of the Gitga’at First Nation, at Hartley Bay, which had organized the protest.

While Kitimat Council long stood neutral on the issue, the councils at Prince Rupert, Terrace, Smithers as well as the Kitimat Stikine Regional District and the Skeena Queen Charlotte Regional District had voted to oppose the Northern Gateway.

Audio Slideshow; No to Tankers Rally, Prince Rupert, February 4, 2012

The Skeena Route

The Skeena is one of the greatest salmon rivers on the planet. The Petronas LNG project has already run into problems because its planned terminal at Lelu Island would also impact the crucial eel-grass which is the nursery for young salmon leaving the Skeena and preparing to enter the ocean. Note that northern BC is generally in favour of LNG terminals, if the terminals are in the right place, so expect huge protests against any bitumen terminal at the mouth of the Skeena.

When I say there isn’t room for a pipeline along the Skeena, it also means that there isn’t any room for the pipeline corridor right-of-way. Enbridge, in its submissions to the Joint Review Panel, said it requires a 25 metre wide right of way for the pipeline corridor. (For the record that’s just over 82 feet).

Along that highway, as you will see, there’s barely enough room for the CN mainline and Highway 16 (also known as the Yellowhead Highway) and on a lot of places both the highway and the railway roadbed are built on fill along the side of a cliff.

Now I’ve said this all before, two years ago, in a piece for the Huffington Post, Get Over it! A Pipeline to Prince Rupert Is Bust

Albertans’ desperate desire to see the Northern Gateway go to anywhere to what they call “tide water” keeps coming up like the proverbial bad penny. The latest came when Jim Prentice speculated about a new route for the Northern Gateway.

I knew I had an appointment coming up in Prince Rupert on Monday, September 29. So I decided that only way to prove to people sitting in Calgary, Edmonton and Fort McMurray playing with Google Maps that the pipeline to Prince Rupert was a really dumb idea was to shoot photographs to show just why the Northern Gateway will never go to Prince Rupert—at least along the Skeena.

As you drive out of Terrace, you pass two large swing gates (also called by some “Checkpoint Charlie” gates after the Cold War era crossing in Berlin.) At the first rest stop west of Terrace, there are another set of gates at the Exstew. There’s a third set of gates just outside Prince Rupert.

A logging truck passes the avalanche gates at Exstew on Highway 16, Sept. 29, 2014.  (Robin Rowland)
A logging truck passes the avalanche gates at Exstew on Highway 16, Sept. 29, 2014. (Robin Rowland)

The swing gates are avalanche gates and, in the winter, Highway 16 can be shut down if an avalanche closes the highway or the danger from avalanche is too great to allow motorists to proceed. When you drive the highway from Terrace to Prince Rupert in the winter (the signs were covered up when I drove Monday) you are warned “Avalanche danger Next 13 kilometres. No stopping.”

The Exstew avalanche gates, (Robin Rowland/Northwest Coast Energy News)
The Exstew avalanche gates, (Robin Rowland/Northwest Coast Energy News)

The drive along the Skeena from just west of Exchamsiks River Provincial Park all the way to Tyee where the highway turns inland to reach northwest to Prince Rupert on Kaien Island is one of the most spectacular drives on this planet. The highway snakes along a narrow strip of land with steep mountain cliffs on one side and the vast river on the other.

The problem is that apart from locals and tourists, none of the “experts” whether journalist, think tanker, bureaucrat or politician have, apparently ever driven from Prince Rupert to Terrace.

When both Opposition Leader Tom Mulcair and Liberal Leader Justin Trudeau were in the northwest earlier this summer to “engage” with the local people, apart from short boat trips down Douglas Channel, they flew everywhere. Scheduling you know. Stephen Harper has never visited northwest BC and probably never intends to. His cabinet members fly in for photo ops and then are on the next plane out of town.

Of all the visiting journalists who have come to the northwest only a couple have bothered to drive around the region. Most fly-in fly-out. These days, most often budget-strapped reporters never leave their offices, interviewing the same usual suspects by phone on every story.

On Monday, I took most of the photographs on my way back from Prince Rupert to Terrace after my appointment, so the sequence is from west to east. There are also very few places along the river where you can safely stop. There are concrete barricades on both sides of the highway to prevent vehicles either going into the river or onto the narrow CN right-of-way.

There are, however, two rest stops and a number of small turnoffs on the highway, the turnoffs mainly intended for use by BC Highways, but which are also used by tourists, fishers and photographers.

aberdeencreek1

The first image was taken at one of those highway turnoffs just east of Aberdeen Creek. This is what the highway and rail corridor are like all along the Skeena, the highway, bounded by concrete barricades, the CN rail line and then the towering mountains. Note where the telegraph and telephone lines are—further up the cliffside.

aberdeencreek4

A closer view of the highway and rail corridor just east of Aberdeen Creek.

aberdeencreek3

Here is the view of the Skeena River from the Aberdeen Creek turnoff. You can see to the east, a mountain and the narrow strip of fill land that supports the highway and the rail line.

 

aberdeencreek2
You see the broad width of the mighty Skeena, the Misty River, as it is called by the Tsimshian First Nation and by everyone else who lives in the northwest and on the right side of the image, the highway and rail corridor built on fill.

Any room for a pipeline?

aberdeencreek5

There’s another turnoff on the other side of the headland east of Aberdeen Creek, looking back the way we came.

khyex1

The final small turnoff is just by the Kylex River. Again you can see how narrow the highway and rail corridor are.

basalt

A few kilometres further along—as I said the highway snakes and curves its way along the riverbank–  you come to the Basalt Creek rest area. So this telephoto image shows a logging truck heading west,   taken from Basalt Creek, looking back at the highway.

Again you can see both the highway and CN line are built on fill. Is there any room for a pipeline?

Any room for a 25 metre pipeline right-of-way?

Between Basalt Creek and Telegraph Point, a few kilometres to the east, again the highway and rail line hug the narrow strip between the river and mountains.

Rowland_CN_container_Skeena

This shot, taken from Telegraph Point, in October 2013, shows a CN intermodal container train heading to Prince Rupert. The container trains and the coal trains usually have between 150 and 180 cars. If a winter avalanche took out a train, there would be environmental damage, but that damage would be insignificant from coal or containers compared to a train of railbit tankers carrying diluted bitumen.

At Telegraph Point, the second of the three rest stops between Prince Rupert and Terrace, again there is just a narrow strip between the mountain, the highway and the river.

telegraph1

telegraph2

Across the highway from the rest stop, you can again see the narrow corridor, the first shot looking west the rail line close to the cliff face, the second, east, with the waterfall, which you don’t see during the rest of the year, fed by the fall monsoon.

 

telegraphmarch2013Two shots from the same location, Telegraph Point, taken in March, 2013, of a CN locomotive hauling empty coal cars back to the fields around Tumbler Ridge. (No waterfall in March)

telegraphmarch2013_1

 

Alternative routes

Everyone has assumed that if Northern Gateway changed its route, the most likely choice given the configuration of the pipeline at the moment is to follow the Skeena.

There are alternatives. The Petronas LNG project and its partner TransCanada Pipelines have proposed a more northern cross-country route, which would go north from the Hazeltons, avoiding the Skeena 

Proposed natural gas pipeline. (TransCanada)
Proposed natural gas pipeline. (TransCanada)

The BG Group and Spectra Energy are also contemplating a pipeline…although details on the website are rather sparse.

If Enbridge wanted to try a northern route, similar to the one TransCanada contemplates for Petronas, Northern Gateway would again run into trouble.

It would require reopening or creating a new Joint Review Panel, many more years of environmental and social impact studies of the route, even under Stephen Harper’s fast track system. The TransCanada/Petronas pipeline would also cross the traditional territory of the Gitxsan First Nation and if Enbridge tried that the company would have to deal with the fact that it signed a controversial agreement with Elmer Derrick that was immediately repudiated by most members of the Gitxsan First Nation and eventually dropped by Enbridge.

So why does this idea of a pipeline to Prince Rupert keep coming up?

In most cases, the idea of the pipeline to Prince Rupert is always proposed by Albertans, not from any credible source in British Columbia, or the suggestions come from desk bound analysts in Toronto and Ottawa both in think tanks and in the newsrooms of dying newspapers who have never seen the Skeena River apart from a tiny handful who have looked at Google Street View

(Yes you can Google Street View Highway 16 along the Skeena, I recommend it if you can’t do the drive)

Perhaps the worst example of this failure of both analysis and journalism came in the Edmonton Journal on July 7,2014, when it published a piece by Bob Russell, entitled Opinion: Make Prince Rupert the terminus, which went over the same old inaccurate arguments.

The overland route currently proposed by Enbridge is fraught with environmental issues because it goes over coastal mountains and streams before entering Kitimat’s port. This port will also be the base of perhaps as many as four liquefied natural gas terminals, which will result in the channel always busy with LNG ships outbound and returning from many Asian ports.

There are existing rights of way for the major highway, the Yellowhead, and CN Rail line from Edmonton to the Port of Prince Rupert, so this eliminates the issue of transgressing First Nations lands. The technical issues of narrow passages can be overcome with engineering. In fact, the pipeline can be buried in the roadway at some restricted locations if absolutely necessary, but two different engineers have assured me that for the most part, the right of way should be able to handle the pipeline. A vital factor, of course, is to reduce the impact by eliminating the need for two pipelines.

The clue is how the Edmonton Journal describes Russell;

Bob Russell has an extensive background in planning and was a member of the Edmonton Metro Regional Planning Commission. He has flown the Douglas Channel, visited Kitimat and toured the Port of Prince Rupert.

This is so typical of the Albertan attitude toward northwest British Columbia,  people fly in for a couple of days, make a quick observation, and fly out again and present themselves as experts on the region. (Some “experts” on Kitimat, very active on Twitter have apparently never left Calgary).

It obvious that the “two engineers” who assured him “the right-of-way could handle of pipeline” have no idea what they’re talking about. As the photos show there is barely enough room for a highway and a rail line much less a 25 metre wide pipeline corridor.

If the pipeline was to be built as Russell proposed, the only highway between Prince Rupert and the rest of Canada would have to be closed for years, there are no detours.  All so a pipeline can be buried under the asphalt not in solid ground, but in the fill on the side of a riverbank in an avalanche zone?

Of course, closing a highway up here won’t inconvenience anyone in Edmonton or Calgary, will it?

Would CN be happy with years of disruption of their lucrative traffic to Prince Rupert with grain and coal outbound to Asia and all those containers coming in to feed Chinese products to the North American market? (you can be sure Walmart wouldn’t be happy about that, not to mention prairie farmers including those from Alberta)

Russell’s statement

There are existing rights of way for the major highway, the Yellowhead, and CN Rail line from Edmonton to the Port of Prince Rupert, so this eliminates the issue of transgressing First Nations lands.

Is also inaccurate.

I was told by First Nations leaders during the Idle No More demonstrations in the winter of 2013, that, a century ago, when the Grand Trunk built the railway along the Skeena , they did just that, built it without consulting the First Nations along the route, sometime digging up native cemeteries and sacred spots.

While apparently CN has worked in recent years to improve relations with the First Nations along the rail line, according to those leaders some issues of right-of-way remain to be resolved.

If there were any plans to build a diluted bitumen pipeline along that route, that would likely mean another court battle adding to those already before the Federal Court, a court battle that would cost Enbridge, CN, the federal government, environmental NGOs and the First Nations more millions in lawyers’ fees.

It’s doubtful if in the long gone (and perhaps mythical) days of “get it right” journalism that the Russell opinion piece would have passed the scrutiny of an old fashioned copy editor and fact checker.

In 2012, the Edmonton Journal (in a story no longer available on their website) also cited former Alberta Premier Peter Lougheed and former Bank of Canada governor David Dodge, as also favouring Prince Rupert.

Dodge, who was in Edmonton Tuesday to deliver a speech on the global economic outlook at MacEwan University, said Enbridge’s proposed Northern Gateway pipeline to Kitimat looks like even more of a long shot.
“I think the project to Kitimat looks, objectively, more risky. So why hasn’t much greater effort gone into looking at Prince Rupert and taking (bitumen) out that way? My guess is, the easiest place to get B.C. to buy into the project would be to go to Rupert.”
Dodge’s views echo those of former Alberta Premier Peter Lougheed, who also favours looking at an alternate pipeline route to Prince Rupert, where ocean-going supertankers can navigate more easily.

Back in 2012, I finished my piece for the Huffington Post by saying:

So why do people insist, despite the evidence, that the Northern Gateway go to Prince Rupert? It’s no longer an pipeline; it’s emotion and ideology. Ideology in that opposition to the Northern Gateway is seen by conservatives as heretical opposition to free enterprise itself. Emotion among those who see promoting the oil patch as an issue of “Alberta pride” and even Canadian patriotism.
For the promoters of the pipeline to Prince Rupert, ignoring the science of geology and the study of geography across all of northwestern B.C. is no different than repeatedly knocking your head against the Paleozoic metamorphic greenstone of the mountain cliffs along the Skeena. It only gives you a headache.

Things haven’t gotten much better in the past two years. In fact they’re getting worse as opposition to pipelines mounts.

It seems that in 2014  the Alberta and the federal government policy in promoting pipelines Northern Gateway, KinderMorgan’s TransMountain, Keystone XL, Line 9 Reversal and Energy East (slick PR and smiling representatives at open houses, politicians at strictly controlled photo ops) is to ignore facts on the ground and to refuse to deal with the concerns of local people from coast to coast.

There could, perhaps, be a more inclusive and truly science-based pipeline planning process that could see pipelines go on optimum routes but that isn’t happening.

The policy  for the oil patch and its politician supporters when it comes to pipelines is facts and geology don’t really matter. So they put on ruby slippers, knock their heels together three times and send pipelines down a yellow brick road to an Emerald City (while telling the locals to ignore the man behind the curtain)

Related links

The Save Our Salmon website has a different view, arguing that federal government and the energy companies have a plan to create an energy corridor for bitumen pipelines to Prince Rupert.

Controlling land and pipelines key to Haisla LNG future NEB filing says

The Haisla Nation’s plan for entering the LNG business is based on the idea that “it is anticipated that the Haisla Projects will be developed using a business model based on controlling two components of the value chain: land and pipeline capacity” according to its application to the National Energy Board for a natural gas export licence.

Cedar LNG Development Ltd., owned by the Haisla Nation, filed three requests for export licences with the NEB on August 28, under the names Cedar 1 LNG, Cedar 2 LNG and Cedar 3 LNG.  Another name used in the application is the “Haisla Projects.”

The 25-year export licence request is standard in the LNG business; it allows export of natural gas in excess of projected North American requirements. Thus like the NEB hearings for the Kitimat LNG and LNG Canada projects it is not what is called a “facility” licence which is what Enbridge Northern Gateway requested.

The project anticipates six “jetties” that would load LNG into either barges or ships at three points along Douglas Channel, one where the present and financially troubled BC LNG/Douglas Channel Partners project would be.

A second would be beside the BC LNG project, which may refer to the Triton project proposed by  Pacific Northern Gas parent company Altagas.

Both are on land now owned by the Haisla Nation in “fee simple” land ownership under Canadian law.

Map of Haisla LNG sites
Map from the Haisla application to the NEB showing that the Haisla Projects Region will allow for a total of six LNG jetty sites. One of these, on DL99, is currently ear-marked to be used for a project involving a consortium (BCLNG) One will be situated on the DL309 Haisla fee simple land and the other four jetties are to be  situated on the Haisla leased lands that surround the Chevron-led LNG development at Bish Cove. The map also shows that the Haisla own land at Minette Bay.

The other four would be on land surrounding the current Chevron-led Kitimat LNG project along Douglas Channel and in the mountains overlooking Bish Cove which the Haisla have leased.

Ellis Ross
Haisla Nation Chief Counsellor Ellis Ross at Bish Cove, June 19, 2013. (Robin Rowland/Northwest Coast Energy News)

The move last week and the revelation of the Haisla’s plans for the land are a cumulation of Haisla Nation Chief Counsellor Ellis Ross’s idea of restoring more of the First Nation’s traditional territory by buying or leasing the land using standard Canadian land law and at the same time getting around some of the more restrictive provisions of the Indian Act that apply to reserve land.

Just how the Haisla will go into the pipeline business is not as clear as the First Nation’s acquisition of the land. The application says:

The pipeline capacity required to transport sourced LNG to the Haisla Projects will include a mix of new and existing pipeline and infrastructure. The Haisla are in the advanced stages of negotiating and drafting definitive agreements with the major gas producers and pipeline transmission companies located in the vicinity with respect to securing pipeline capacity. It is expected that the Haisla Projects will rely on the Haisla’s business partners or customers to source gas from their own reserves and the market.

With the Haisla basing their business strategy on land and pipelines, the First Nation’s strategy is looking for  flexibility in what is a volatile and uncertain market for LNG.

The application says the Haisla “are currently in advanced stage discussions and negotiations with a number of investors, gas producers, LNG purchasers, pipeline transmission companies, technology providers and shippers. As such, the particular business models have yet to be finalized. However, it is anticipated that between the various Haisla Projects, multiple export arrangements may be utilized.”

As part of the idea of flexibility, the actual LNG infrastructure will be constructed and operated with potential partners. That is why there are three separate applications so that each “application will represent a separate project with independent commercial dealings with investors, gas producers, LNG purchasers, pipeline transmission companies, technology providers and shippers.”

The Haisla say that they are “working with a number of entities to develop business structures and partnerships to provide transaction flexibility, adequate financing, modern technology, local knowledge, and marketing expertise specific to Asian targets. The separate projects will accommodate expected production and demand and will also allow for a number of midlevel organizations to be involved with the various projects as well as traditional major gas producers and LNG purchasers.”

The Haisla are working with the Norwegian Golar LNG which had been involved in the stalled BC LNG project, using a Golar LNG’s vessels and technology, using a new design that is now being built in Singapore by Keppel Shipyard.

Golar LNG uses PRICO LNG  process technology developed by Black & Veatch,  (Wikipedia entry) “which is reliable, flexible and offers simplified operation and reduced equipment count.”

The filing says the project will “be developed using either barge-based or converted Moss-style FLNG vessels. The terminals will consist of vessel-based liquefaction and processing facilities, vessel-based storage tanks, and facilities to support ship berthing and cargo loading”

The jetties to be used for the Haisla Projects may be either individual FLNG vessels or “double stacked”, meaning that the FLNG vessels are moored side-by-side at a single jetty. The Haisla have conducted various jetty design work and site /evaluation studies with Moffat and Nichol.

The Haisla Projects anticipate that the construction will be in 2017 to 2020, “subject to receiving all necessary permits and approvals” and is expected to continue for a term of up to twenty five years. There is one warning, “The timelines of the Haisla Projects will also depend on the contracts and relationships between the Applicant and its partners.”

The filing goes on to say:

Haisla Nation Council and its Economic Development Committee are committed to furthering economic development for the Haisla. The Haisla’s business philosophy is to advance commercially successful initiatives and to promote environmentally responsible and sustainable development, while minimizing impacts on land and water resources, partnering with First Nations and non-First Nations persons, working with joint venture business partners, and promoting and facilitating long-term development opportunities.

The Haisla Applications will allow the Haisla to be directly involved as participants in Canada’s LNG industry, rather than having only royalty or indirect interests. The Kitimat LNG and LNG Canada projects, and the associated Pacific Trails Pipeline and Coastal Gas Link Pipeline, have increased economic opportunities in the region and the Haisla are very supportive of these projects locating within the traditional territory of the Haisla. The support of the Haisla for these two projects reflects a critical evolution of the Haisla’s economic and social objectives.

You can see the filing on the NEB projects page at http://www.neb-one.gc.ca/clf-nsi/rthnb/pplctnsbfrthnb/lngxprtlcncpplctns/lngxprtlcncpplctns-eng.html

Map from the Haisla Nation application to the NEB showing the proposed LNG developments in relation  to Douglas Channel.
Map from the Haisla Nation application to the NEB showing the proposed LNG developments in relation to Douglas Channel.
Bitumen map
Map from the Enbridge filing with the Joint Review Panel showing the same area with the proposed Northern Gateway bitumen terminal.

 

 

Enbridge Kalamazoo cleanup now set at $1.157 billion and growing

The cost of Enbridge’s cleanup from the spill at Marshall, Michigan in 2010 is now $1.157 billion the company said Friday as it released its second quarter results. That is an increase of $35 million from the estimates Enbridge released at the end of 2013 and the first quarter of 2014.

As of June, 2014, Enbridge faces possibly $30 million in fines and penalties from the United States government.

In its quarterly report Enbridge said

EEP   [Embridge Energy Partners] continues to perform necessary remediation, restoration and monitoring of the areas affected by the Line 6B crude oil release. All the initiatives EEP is undertaking in the monitoring and restoration phase are intended to restore the crude oil release area to the satisfaction of the appropriate regulatory authorities.

On March 14, 2013, as previously reported, the United States Environmental Protection Agency ordered in Enbridge to undertake “additional containment and active recovery of submerged oil relating to the Line 6B crude oil release.”

new Enbridge logoEnbridge says it has “completed substantially all of the EPA order, “with the exception of required dredging in and around Morrow Lake and its delta.”

“Approximately $30 million of the increase in the total cost estimate during the three months ended June 30, 2014 is primarily related to the finalization of the MDEQ approved Schedule of Work and other costs related to the on-going river restoration activities near Ceresco,” Enbridge reported.

Enbridge also said it is working with the Michigan Department of Environmental Quality “to transition submerged oil reassessment, sheen management and sediment trap monitoring and maintenance activities from the EPA to the MDEQ, through a Kalamazoo River Residual Oil Monitoring and Maintenance Work Plan.”

Enbridge also said that costs may still go up, saying there continues to be the potential for “additional costs in connection with this crude oil release due to variations in any or all of the cost categories, including modified or revised requirements from regulatory agencies, in addition to fines and penalties and expenditures associated with litigation and settlement of claims.”

Enbridge said that “a majority of the costs incurred in connection with the crude oil release for Line 6B are covered by Enbridge’s comprehensive insurance policy…. which had an aggregate limit of  $650 million for pollution liability.” So far, Enbridge has recovered $547 million of the $650 million from its insurers. Enbridge is suing its insurers to recover the rest of the money.

That means that “Enbridge and its affiliates have exceeded the limits of their coverage under this insurance policy. Additionally, fines and penalties would not be covered under the existing insurance policy,” the company said.

Insurance renewed

Enbridge said it has “renewed its comprehensive property and liability insurance programs under which the Company is insured through April 30, 2015 with a liability aggregate limit of $700 million, including sudden and accidental pollution liability, with a deductible applicable to oil pollution events of $30 million per event, from the previous $10 million.”

It adds:

In the unlikely event multiple insurable incidents occur which exceed coverage limits within the same insurance period, the total insurance coverage will be allocated among Enbridge entities on an equitable basis based on an insurance allocation agreement among Enbridge and its subsidiaries.

All Enbridge figures are in US dollars

The Northern Gateway Joint Review Panel required Enbridge that “its Northern Gateway’s Financial Assurances Plan must provide a total coverage of $950 million for the costs of liabilities for, without limitation, cleanup, remediation, and other damages caused by the Project during the operations phase. The plan should include the following components and minimum coverage levels.” (That figure in Canadian dollars)

Chevron sticks with Kitimat but no final investment decision until customers sign

Chevron is sticking with the Kitimat LNG project but won’t make a Final Investment Decision until it has signed sales and purchase agreements for between 60 and 70 per cent of the natural gas, Chevron’s vice-chairman and executive vice-president of upstream operations, George Kirkland told investment analysts in a conference call Friday.

Kirkland said that decision will happen “irrespective of what happens with Apache,” which has decided to completely exit the project.

Chevron Logo“We need to get partnership resolved and Apache has to move through the issues s and we need to get a new partner in. That needs to happen. That’s quite obvious,” Kirkland added.

Other factors, Kirkland told the call, are final test results from the Liard and Horn River natural gas play in northeast British Columbia and finalization of the “pipeline corridor.”

Kitimat-Liard-Horn package

Although the residents of Kitimat are focused on the LNG terminal at Bish Cove, remarks both by Kirkland today and by Apache CEO Steve Farris Thursday, it appears that energy industry views Kitimat LNG as part of a “package” (a term used by both) that includes the Liard and Horn River gas fields and the connecting Pacific Trails Pipeline.

Kirkland also said Chevron has no interest in any further investment beyond the 50 per cent it already holds. “We have 50 per cent of the interest in Kitimat-Liard-Horn River assets. That’s right in the middle of the sweet spot where we like to be where we’re committing people to run the projects and operations. We don’t want more than 50 per cent but we do have available some small amount of working interest that we would provide to a LNG buyer.

“There’s always been a plan for us and Apache to have some working interest that could be sold down to buyers, so they would be part of the development and they would be in the value chain. That has not changed.”

Kitimat LNG’s rival project LNG Canada, run by Shell, has buyer partners in KoGas, Mitsubishi and PetroChina.

Bish Cove
Kitimat LNG under construction at Bish Cove, September 2013. (Robin Rowland/Northwest Coast Energy News)

Final Investment Decision

One analyst asked Kirkland if the Final Investment Decision would come at the end of 2014, as previously announced, or in 2015. Instead, Kirkland said, “We will reach FID shortly after having 60 to 70 per cent gas committed to an SPA- a sales and purchase agreement. That is the critical decision maker and for both timing and the investment decision, irrespective of what happens with Apache. We’re driven, once again, by having a sales contract or sales contracts that gives us 60 to 70 per cent of the gas committed at an economic price.”

On the Kitimat terminal, Kirkland said, “We’ve got work going on, FEED [Front End Engineering and Design] work on the plant itself.

“We have to understand cost and schedule on that plant… We’re not spending huge money but it is a lot of money in terms of  hundreds  of millions of dollars.  Now that is critical for us to have all that so we can deal knowledgeably with buyers. We have to understand cost. We have to understand resource,  so we can deal with the particulars of pricing.

“We are not going to do a project unless it’s economic. We’ve always told you we’re not going to build that project unless we have 60 per cent of the gas sold. If you understand the project it makes sense.”

“I am not concerned if Apache leaves,” Kirkland said. “I think we could easily step in and be the operator of the upstream. I am confident there. Apache has been very good to work with in the early stages of the assessment of Liard.

“I think we’re in good shape but we need clarity, we need to get closure on the partnership and as I mentioned we have to do the work where we deal with buyers and understand costs and understand economics. We are very value driven, we are not going to go FID until we understand the economics of that sale.”

Confident on assets

Kirkland said that the company is confident about the assets in the Liard and Horn River regions but is waiting for final results from some test wells in the Liard.
“We can check off our confidence level on the Horn River. Resources are already high. We’ve already done that appraisal. So the focus on the resource sector is on the Liard,  with some appraisal there and getting some production work. The wells where we need to get some production data  will be complete by the end of the year. So that’s a really important step forward.”

Kirkland also hinted at the potential problems with the Pacific Trails Pipeline, where there is still a dispute with the Wet’suwet’en First Nation. “We’re going to focus on the pipeline and the end of the pipeline corridor. That’s important and we’re putting some money into that to finalize the pipeline routing, get all our clearances and then we’ve got work going on.”

Chevron slide
Slide from the Chevron second quarter results presentation showing other LNG projects (Chevron)

Overall Kirkland was enthusiastic about other liquified natural gas projects in Australia and elsewhere in the world. Chevron Corporation reported earnings of $5.7 billion for the second quarter 2014, compared with $5.4 billion in the 2013 second quarter. Sales and other operating revenues in the second quarter 2014 were $56 billion, compared to $55 billion in the year-ago period.

Company CEO John Watson said a news release, “In Australia, our Gorgon and Wheatstone LNG projects continue to reach important interim milestones. Gorgon remains on track for expected start-up in mid-2015. We are also advancing the development of our liquids-rich, unconventional properties in the United States, Canada and Argentina.”

Kitimat air shed study raises more questions than it actually answers

The sudden release early Friday, July 18, by the British Columbia Ministry of the Environment about the Kitimat Valley air shed study brings more questions than the answers it provides; some questions are political, some technical.

The questions include

1. Why was the study suddenly released after the province said it was “privileged?”
2. Did the apparently rushed release mean that the study, as far as the public is concerned, is incomplete?
3. While most people in Kitimat believed that the study would be a wide ranging look at all parameters of industrial development in the valley, it was limited to just two factors, sulphur dioxide and nitrogen dioxide.
4. It appears that everyone involved were consulted prior to the release with one key execption, the District of Kitimat. Why?
5. The study appears to have changed in its criterion from the time of the request for proposal and the final release one issue—an oil export terminal, which went from “crude” in the request for proposal  to refined in the final report.

Douglas Channel
Clouds over Douglas Channel. (Robin Rowland/Northwest Coast Energy News)`

While the study is spun has a showing that industrial development in the Kitimat Valley can proceed as long as the environment is properly managed, the gaps and the spin will likely bring doubt to the results. That means that a wider ranging and truly independent study of the air shed is needed so that both residents and industry can then make the proper decisions.

Ironically, a proper study may actually come from industry, rather than government since LNG Canada has said that a full air shed study will be part of its environmental assessment filing expected in the fall.

The air shed proposal

In October  2013, the Ministry of the Environment issues a “request for proposal” to “study potential cumulative effects to environment and human health from existing and proposed industrial facilities in the Kitimat airshed.” to be filed by March 31, 2014.

According to the government website,

The Province will fund a $650,000 scientific study to help inform regulatory and policy development for future industrial activity in the Kitimat area. The goal is to ensure the potential impacts from industrial air emissions are clearly understood prior to new projects being approved and in operation.
The Kitimat Airshed Impact Assessment Project will look at the cumulative effects of existing and proposed industrial air emissions in the airshed. These include emissions from: an existing aluminium smelter, three proposed LNG terminals, a proposed oil refinery, a crude-oil export facility, and gas-turbine-powered electrical generation facilities. The study will focus on sulphur dioxide and nitrogen dioxide emissions from these facilities.
The study will assess the impact of emissions through a number of scenarios, including their potential effects on water and soil, as well as on vegetation and human health from direct exposure.

With that news release, it appears that many people assumed that “cumulative effects of existing and proposed industrial air emissions in the air shed,” would include all possible scenarios and contaminants.

The report, when it was released on Friday, covered just  the “focus” sulphur dioxide and nitrogen dioxide and no other factors in air quality.

Crude or refined oil export?

airshedmap3As Northwest Coast Energy News noted that the report, as released, doesn’t include any references to the Enbridge Northern Gateway project, even though Northern Gateway is a source of “proposed industrial air emissions in the air shed.” The request for proposal also mentions “a crude-oil export facility” but the report as issued concerns a marine terminal for Black’s refinery

David Black’s Kitimat Clean website says 

The products will be exported via a marine terminal on the Douglas Channel. Projected volumes include 320,000 barrels per day of diesel fuel, 110,000 barrels per day of gasoline and 60,000 barrels per day of jet fuel.

The map in the main report clearly shows that the study concerned the “Kitimat Clean Refinery Port” not a crude oil export facility—in other words likely Enbridge Northern Gateway.

Kitimat excluded

On October 21, 2013,  District of Kitimat Council endorsed a motion by former Councillor Corinne Scott:

“The BC Government has recently announced a budget of $650,000 to study the cumulative effects on the air quality due to the proposed industrial development in the District of Kitimat. It would be beneficial to have a representative from the District of Kitimat as an active participant on the committee to provide input and feedback as the study progresses.”

At the time Chief Adminstrative Officer Ron Poole told council that the minister’s office had called and promised to “involve the District.”

At that meeting, Councillor Mary Murphy reported that member were “vocal” at the Union of BC Municpalities that it was essential that Kitimat be involved. Councillors suggested that the study be wide ranging and include emissions already in the area and residual emissions left over from the closed Eurocan and Methaex operations.

The provincial final air shed report makes no mention at all of the District of Kitimat, Eurocan or Methanex.

In April, 2014, after the March 31, reporting deadine, the District and Council had heard nothing from the province. So in April, District Council passed a motion asking for a report on the status of the study.

Crown Privilege

In June, the province refused to release the report to lawyers involved in a suit against the Environmental Assessment Board which is challenging Rio Tinto Alcans’ permit to increase sulphur dixoide emission in the valley. According to the Globe and Mail,  Dennis Doyle, a lawyer with the Ministry of the Attorney General, in the RTA suit, wrote to the Environmental Law Centre in Victoria

In a follow-up letter dated June 12, Mr. Doyle said, “On the matter of the Kitimat Airshed Study I am instructed that this report was prepared to guide development of government policy on industrial development in the Kitimat area and to assist the executive council in its ongoing deliberations. It is not a report that was prepared for the Respondent and played no part of the decision-making process for the permit amendment which is now under appeal.”

In mid-July, the lawyers then asked the Environment Assessment Board to either turn over the air shed report or explain why it was covered by Crown Privilege.

The EAB told the province to respond to that question by July 18. Instead there was a hastily called news conference and the report was released. However, a close look at the report shows that it was likely rushed to meet the EAB deadine and was incomplete—rather surprising for a report that was supposed to be complete by March 31.

Rushed report

airshedcoverWhat evidence is there that the report was rushed out by the Ministry of the Environment? The most compelling indication is that instead of a public-friendly Summary Report with an executive summary and clear conclusions, there was nothing more than a short Power Point presentation.

Most people in Kitimat who follow the energy debate are familiar with the approach of combining a readable summary with technical data. It is most evident in the report of the Enbridge Northern Gateway Joint Review, which issued a relative short summary, Connections along with the long technical report, Considerations.

Let’s take as a prime example, the original report on the Kitimat airshed commissioned by Rio Tinto Alcan. In that case, ESSA Technologies Ltd of Vancouver, the company hired by the RTA Kitimat Modernization Project to study the effects of increased sulphur dioxide emissions in the Kitimat Valley, issued three documents, an easy to understand 37-page summary report, a much longer 456 page Technical Assessment Report and a third  332 page volume of appendices, technical data and tables.

It was the same company, ESSA Technologies, that was retained by the province to do the much larger study of the airshed. However, the only public-friendly information was the 16 page highly simplified Power Point presentation.

The ESSA summary report for RTA shows in plain language, the reasons for its conclusions that the increased sulphur dioxide from KMP on human health “is characterized as moderate, an acceptable impact, but in need of closer scrutiny with moderate monitoring.” That report also outlines the limitations and uncertainties of the study.

There was no similar plain language summary released for the overall provincial air shed study, even though it was produced by the same company and came to similar conclusions.  To find any limitations or uncertainties in the provincial air shed study you have to do a computer search for those key words.

So it is apparent that intended audience for the report is not really  those who live in Kitimat, where over the past five years there is wide knowledge that a summary release along with a technical report is considered a standard procedure.

Kitimat not consulted

At the Friday news conference, reporters asked Environment Minister Mary Polak several times about the delay in releasing the report, and then why it was suddenly released.

In answer to the initial question, Polak said, “We had always intended to release it.” She refused to comment on the claim of cabinet privilege, saying that was the responsibility of government lawyers at the Ministry of the Attorney General. She said that the government had received the March 31 report “by the end of April and “it went through quite a rigorous and thorough review by different agencies… we are satisfied now that the findings have been given the kind of rigorous overview and we’re pleased with what has resulted from that.”

Polak said the Haisla Nation were consulted before the commissioning of the report.

Asked again about who the BC government consulted during the review period, she replied, “There were a number of other groups involved in technical review, so not just Ministry of Environment, you’ll be aware of Northern Health authority, but Ministry of Natural Gas Development, Health Canada, Environment Canada and also specialist reviewers from the Province of Quebec, the University of Helsinki, UBC, also private consultants. Then we spent some time going over and having a technical review with Gitga’at and Coastal Coastal First Nations. So it was a matter of ensuring that we had done the very best review of the work before the occasion on which we released it.”

Which leaves one big question, why was the Province of Quebec and the University of Helsinki consulted and Kitimat, despite requests, was not?

Not in the report, not my department

The provincial government called for a report on the “cumulative effects of existing and proposed industrial air emissions” and noted it would focus “ focus on sulphur dioxide and nitrogen dioxide emissions from these facilities.” It is clear that the report did not go beyond the narrow focus on those two substances.

At the Vancouver news conference, a reporter  asked Polak why green house gases were not included.

She replied, “That’s not what this study was intended to look at. This department deals with pollutants and pollution and protecting our environment from it, whereas GHG [green house gas] emissions are dealt with in our department around climate change and climate action. These particular substances have an immediate impact on human health and vegetative health and the receiving environment generally unlike GHGs which are a more global impacted and of course have an impact on climate change. This study only looked at those pollutants sulphur doixide and nitrogen dioxide

Then a second reporter asked here about particulate matter, to which Polak replied, “Coming from the Fraser Valley I am very aware of the impact of particulate matter. Any industrial development that we permit in British Columbia or receives an environmental assessment certificate, particulate matter and the release of particulate matter is one of the things that gets evaluated as we determine whether or not to grant those permits. Or to put stipulations on those permits in order to ensure a reduction or management of particulate matter. That’s where that’s dealt with and we have some pretty good understanding of how that operates. We also have some modelling from this study.

“The reason this study didn’t report on that because we hadn’t asked them to. We specifically wanted to get at the issue of sulphur disoxide and nitrogen dioxide but please do not take frm that because it’s not in the study, it doesn’t get looked at. It simply gets looked at in a different process. In this case it was the understanding of the Kitimat air shed with respect to sulphur dixoide and nitrogen dioxide that we needed to have a better answers and better information.”

In other words, despite what the original proposal said: “The goal is to ensure the potential impacts from industrial air emissions are clearly understood prior to new projects being approved and in operation,” the provincial government is content to wait until the permit phase to consider particulate matter, rather than include particulate matter in the long term planning for the air shed.

And for green house gases, the same attitude seems to apply, either it’s not her department or it will be dealt with sometime in the future.

What’s going on in the air shed?

Although the provincial government has been able to spin that the air shed report clears the way for more industrial development in the region, the report isn’t much help for long term planning for those both for and against industrial development in the valley.

First one has to wonder just how comprehensive was the study, even when it comes to sulphur dioxide and nitrogen dioxide?

The report for Rio Tinto Alcan for just one substance—sulphur dixoide—from one industry—aluminum smelting–led to a 456 page technical report with 332 pages of appendices.

The provincial technical report adds  one more substance, nitrogen dioxide,  and adds four LNG facilities, an oil refinery, different export terminals for those industries, and two hydro generating stations plus related shipping, including a passing mention of vehicular and train traffic. The new report  is 363 pages, including the appendices. (It should be noted that the air shed report does reference some of the information in the RTA report)

The various studies for the Enbridge Northern Gateway, which often contained material on air emissions, included a much longer list of what in industry jargon are called CPOC “chemicals of potential concern,” including chemicals that might be released in trace amounts from the Northern Gateway terminal, but may be of more concern from LNG projects. Who knows unless those substances are studied?

As was required by the Joint Review Panel, Enbridge also studied potential problems from accidental release of air-borne contaminants from the Northern Gateway project. There is no mention of accidental release in the current air shed study.

Although the increase in truck traffic in Kitimat is clearly visible to people who live in the town, the air shed report also speculates that with LNG and a possible refinery, there will also be a significant increase in rail traffic coming into Kitimat, hauled, of course, by diesel locomotives, which the report says is “expected to be conservatively captured within the background concentration adjustment.”

Can the Valley “handle industrial expansion”

Stakeholders in the region from the District of Kitimat to the Gitga’at First Nation to various environmental groups asked for a comprehensive review of what is going to happen in the Kitimat air shed with industrial expansion.

So the answer to the question can the valley “handle industrial expansion” after the flawed and limited report from the provincial government is not “yes,” but “we don’t know yet.”

It appears that the report is part of Christy Clark’s ongoing campaign that LNG will save the provincial economy.

There are two factors the report ignores.

First the energy companies are going to make their final investment decision on cold hard facts, including their own assessment of the potential problems from the air shed, not spin from the provincial government.

Second, until there is a proper air shed study, the First Nations, including the Haisla in Kitimat, the Gitga’at at Hartley Bay, the Kitselas in Terrace  will not have solid evidence to make a decision on the details of the LNG or refinery development on their traditional territory and increased ship traffic along the coast and that will come into immediate conflict with the Supreme Court ruling on the Tsilhqot’in decision and the finding that “Whether a particular use is irreconcilable with the ability of succeeding generations to benefit from the land will be a matter to be determined when the issue arises.”

There is a new Orwellian phrase used by both the federal and provincial government. Every report is “independent” and “science-based,” although all they all tend to support the policy of the commissioning agency.

What the Kitimat Valley, Douglas Channel and the Terrace region need is a truly independent and truly science based and truly comprehensive evaluation of the air shed. At the moment, that doesn’t exist. It should whether it comes from industry or if the local governments can find the budget to fund a proper study or some combination of the two.

Links

Kitimat Airshed Assessment
RTA report Sulphur-dioxide-technical-assessment.html

(Scanned version of copy in Kitimat public library)

 

Related

Business in Vancouver

Kitimat airshed modelling has narrow focus

Vancouver Observer

Province’s air pollution study green lights LNG build-up, but ignores climate change

News release: Andrew Weaver MLA
New airshed study is a “nail in the coffin” for government LNG dreams in Kitimat